Amend 73 to License NPF-30,revising TS in Response to 920811 Application & Grants One Time Only Extension to Surveillance Interval Specified for TS Surveillance 4.3.1.1,Table 4.3-1
ML20114B895
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/21/1992
From: Hannon J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20114B898 List:
References
NUDOCS 9208310347
Download: ML20114B895 (4)


Text

.

f.' o. s, s

.l' '

UNITED STATES I * ',

3 i

NUCLEAR REGULATORY COMMISSION

/e' WASHINGTON. D.C. 20666 g

UNION E_LECTRIC COMPANY CALLAWAY PLANT. UNIT 1 DOCKET NO. 50-483 MENDMENT TO FAClllTY OPERATING LICENSE Amendment No. 73 License No. NPF-30 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment filed by Union Electric Company (UE, the licensee) dated August 11, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the comme-defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical specifications as indicated in the attachment to this license amendmen' and paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:

9208310347 920821 PDR ADOCK 05000483 p

PDR

,,.JL.

~.

2 (2)

Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in' Appendix A, as revised through Amendment No.

73, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the license.

UE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Q

'f

/

-h W John t. Hannon, Director Project Directorate III-3 Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: August 21, 1992

ATTACHMENT TO LICENSE AMENDMENT N0 m OPERATING LICENSE N0. NPF-30 DOCKET NO. 50-483 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page.

The revised page-is identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 3/4 3-12a 3/4 3-12a 1

l 4

1 k

TABLE 4.3-1 (Continued)

TABLE NOTATIONS (10) Setpoint verification is not required.

(11) Following maintenance or adjustment of the Reactor trip breakers, the TRIP ACTUATING DEVICE OPERATION TEST shall include independent verifica-tion of the Undervoltage and Shunt trips.

(12) At least once per 18 months during shutdown, verify that on a simulated Boron Dilution Doubling test signal the normal CVCS discharge valves will close and the centrifugal charging pumps suction valves from the RWST will open within 30 seconds.

(13) Deleted (14) Deleted (15) The surveillance MODES specified for these channels in Table 4.3-2 are more restrictive and, therefore, applicable.

(16) The TRIP ACTUATING DEVICE OPERATION TEST sball independently verify the OPERABILITY of the Undervoltage and Shunt Trip circuits for the Manual l

l Reactor Trip function. The test shall also verify the OPERABILITY of the Bypass Breaker trip circuit.

(17) local manual shunt trip prior to placing breaker in service.

(18) Automatic Undervoltage Trip.

l l

' Completc verification of OPERABILITY of the manual reactor trip switch circuitry shall be performed prior to startup from the first shutdown to Mode 3 occurring after August 7, 1992.

i CALLAWAY - UNIT 1 3/4 3-12a Amendment No. 19, 28, 34, 67, 64,73