Submits Schedule for Performing Ipe,Per Suppl 4 to Generic Ltr 88-20, IPE of External Events for Severe Accident Vulnerabilities
ML20114B800
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/27/1992
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-20, W3F192-0300, W3F192-300, NUDOCS 9208310245
Download: ML20114B800 (2)


Text

.

a

W ENTERGY F " "" " " "' " " * " ' ~

,a,

-- -+- -

__q A. F. Durski j

W3F192-0300 A4.05 QA August 27, 1992 U.S. Nuclear Rogulatory Commission Attnt Document Control Desk Washington, D.C.

2055S

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Individual Plant Examination of E:ttornal Events (IPEEE)

-for severe Accident Vulnerabilities (Goneric Lottor 88-20, Supplomont 4)

Dear Gentlemon:

On June 28,

1991, the NRC _ issued Generic Lotter No.

88-20, Supplomont 4,

requesting that licenscos perform an IPEEE and describe the methods, milestones, and schedule for performing the IPEEE.

Waterford 3 via letter W3F191-0657, dated December 20, 1991, described the program and mothods f,r performing the IPEEE.

11owever, a schedule was not provided sinco the completion of the IPE*9 was predicated on the NRC Supplemental Snfoty Evaluation m un '

(SSER) on the Seismic Qualification Utility Group (SQUG) 1 ic Implomontation Procedure which was not issued at that time.

P a1 The yRC, via a letter dated June 17, 1992, apprised Waterford 3 of j

'a issuance of' the SSER and roquested that Waterford 3 provide i

p. Nected - milestones and _ schedules to the NRC no later than September 18, 1992.

This letter providec the requested information.

Entergy Operations, Inc., Waterford 3 will complets the IPEEE for Waterford 3 and submit the results to the NRC by December 31, 1994.

The ovaluation will be conducted in accordance with Waterford 3 letter W3F191 0657 submitted to the NRC on December 20, _1991.

- The submittal-date for the IPEEE is after the date requested in Generic-Lotter 88-20, -but prior to the date set by the NRC for closing savore accident issues. This schadule is necessary so that in-containment walkdowns that may.be required for the seismic or fire evaluation can be'dono during the planned refueling outage in the Spring of 1M 4.

This schedule will provide the additional time that is needed to incorporate the walkdown information into the 92003 % h h 82

(

PDR PDR P-

\\

. s

,_..__ ~.

i l

U'. S. Nuclear Regulatory Commission Individual Plant Examination of External Events (IPEEE) for Savoro Accident Vulnerabilities (Generic Lottor 88-20, Supplomont 4)

W3F192-03L'.

Page 2 August 27, 1992 L

ovaluation, perform any additional evaluations, and complete a final report.

Although Waterford 3 has a refueling outago scheduled for the Fall of 1992,_the unavailability to Waterford 3 personnel of industry training on seismic evaluations precludes performance of in-containment walkdowns at that time.

Please contact me or Robert J.

Murillo should thoro be any questions regarding this letter.

Very truly yours,

[ pW/

f Ae v'\\

R.F.

Burski Director, Nuclear Safety RFB/RJM/dc cc:

R.D. Martin, NRC Region IV-D.L. Wigginton, NRC-NRR R.B. McGohoe N.S. Reynolds NRC Resident Inspectors Office 1