Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113H888 + (ML20113H888)
- ML20113H890 + (ML20113H890)
- ML20113H899 + (ML20113H899)
- ML20113H903 + (ML20113H903)
- ML20113H906 + (ML20113H906)
- HL-2300, Requests Temporary Waiver of Compliance from TS to Permit Exceeding 7-day Allowable Outage Time to Perform Preventative Maint & Mods to EDG 1B by 7 Days.Basis for Waiver & No Significant Hazards Evaluation Encl + (ML20113H907)
- ELV-03715, Forwards Revised Pages to Decommissioning Funding Plan for Vogtle Electric Generating Plant,Units 1 & 2, Per NRC Request.Funding Plan Initially Submitted on 900725.Revs Increase Trust Contribution Amounts from Util + (ML20113H909)
- ML20113H912 + (ML20113H912)
- ML20113H914 + (ML20113H914)
- ML20113H918 + (ML20113H918)
- ML20113H921 + (ML20113H921)
- ML20113H922 + (ML20113H922)
- ML20113H924 + (ML20113H924)
- ML20113H927 + (ML20113H927)
- ML20113H937 + (ML20113H937)
- ML20113H943 + (ML20113H943)
- ML20113H944 + (ML20113H944)
- 0CAN079211, 1991 Annual 10CFR50.59 Rept,Arkansas Nuclear One + (ML20113H951)
- TXX-9236, Forwards Rev to Data Point Library,Initially Submitted Via ,As Part of Erds.Rev Contains Info to Reverify Contents &/Or Changes to Library Resulting from Installation & Testing of Computer,Per Generic Ltr 89-15 + (ML20113H952)
- ML20113H966 + (ML20113H966)
- ML20113H967 + (ML20113H967)
- ML20113H974 + (ML20113H974)
- ML20113H984 + (ML20113H984)
- ML20113H989 + (ML20113H989)
- ML20113H995 + (ML20113H995)
- ML20113J000 + (ML20113J000)
- ML20113J007 + (ML20113J007)
- ML20113J010 + (ML20113J010)
- ML20113J013 + (ML20113J013)
- ML20113J014 + (ML20113J014)
- ML20113J022 + (ML20113J022)
- PY-CEI-NRR-1533, Responds to Violations Noted in Insp Rept 50-440/92-11 on 920527-0615.Corrective Actions:Fill & Vent Summary Sheet, Containing Instruments from All Three RHR Loops,Will Be Eliminated & Operations Personnel Will Be Trained + (ML20113J028)
- ML20113J031 + (ML20113J031)
- ML20113J036 + (ML20113J036)
- ML20113J038 + (ML20113J038)
- ML20113J046 + (ML20113J046)
- ML20113J050 + (ML20113J050)
- ML20113J054 + (ML20113J054)
- ML20113J093 + (ML20113J093)
- ML20113J099 + (ML20113J099)
- LD-92-088, Forwards Sys 80+ Probabilistic Risk Assessment Program Plan for Revised Pra,Per 920325 Commitment + (ML20113J100)
- ML20113J108 + (ML20113J108)
- ML20113J115 + (ML20113J115)
- 05000388/LER-1984-027, :on 841026,fire Watch Not Provided for Inoperable Fire Barriers Per Tech Specs.Caused by Administrative Errors.Affected Fire Barriers Restored. Incident Discussed W/Unit Supervisor + (ML20113J130)
- ML20113J137 + (ML20113J137)
- 05000370/LER-1984-028, :on 841113,upper Head Injection Hydraulic Sys Alarm Received in Control Room for Train B While Train a Instruments Calibr.Caused by Crossover Connection Between Trains Allowing Pressure Surges + (ML20113J140)
- 05000366/LER-1984-037, :on 841218,airlock Leaked in Excess of Tech Spec Limits.Caused by Loose Packing Follower on Inner Door Shaft Seal.Seal Repaired + (ML20113J145)
- 05000321/LER-1984-005, :on 840720,personnel Discovered Numerous Cable Leads Lifted & Not Properly Tagged in Control Room.Caused by Personnel Error & Inadequate Administrative Controls. Procedures Revised + (ML20113J150)
- ML20113J152 + (ML20113J152)
- ML20113J153 + (ML20113J153)
- ML20113J172 + (ML20113J172)