Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113F558 + (ML20113F558)
- ML20113F565 + (ML20113F565)
- ML20113F566 + (ML20113F566)
- ML20113F569 + (ML20113F569)
- ML20113F575 + (ML20113F575)
- ML20113F601 + (ML20113F601)
- 05000382/LER-1996-012-01, :on 951111,normally Locked Closed Valve Discovered 1.5 Turns Open.Caused by Equipment Failure. Closed & Repaired CS-118A to Ensure Ease of Operation.W/ + (ML20113F603)
- ML20113F616 + (ML20113F616)
- 05000440/LER-1996-007, :on 960821,missed Surveillance Occurred.Caused by Weakness in Design Mod Process.Revised Design Mod Process to Provide Detailed Requirements + (ML20113F617)
- ML20113F622 + (ML20113F622)
- 05000382/LER-1996-013-01, :on 960822,possible Operation in Excess of 100% Licensed Power.Cause Is Being Investigated + (ML20113F625)
- ML20113F632 + (ML20113F632)
- ML20113F640 + (ML20113F640)
- ML20113F644 + (ML20113F644)
- 05000338/LER-1996-005-02, :on 960827,reactor Trip Experienced from 100% Power.Caused by Failure of CR Drive Sys.Operations Emergency Procedure E-O, Reactor Trip or Safety Injection Was Entered + (ML20113F647)
- ML20113F657 + (ML20113F657)
- ML20113F660 + (ML20113F660)
- B11400, Forwards Environ Qualification Rept for safety-related Mechanical Equipment,Per 840731 SER (NUREG-1031) Open Item 7.Rept Outlines Evaluation Methodology & Summarizes Evaluation Results + (ML20113F666)
- 05000454/LER-1996-013-02, :on 960815,determined Atmospheric Radiation Monitor Alarm Setpoint Did Not Meet Design Criteria.Cause Unknown.Setpoint Changes Were Completed + (ML20113F668)
- ML20113F678 + (ML20113F678)
- 05000325/LER-1996-009-01, :on 960815,solid Radwaste Updated FSAR Discrepancies Identified.Cause Could Not Be Determined. Resin Processing Was Suspended & Event Investigation Was Performed + (ML20113F683)
- 05000254/LER-1996-015, Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 961231 + (ML20113F715)
- 05000254/LER-1996-015-01, :on 960816,HPCI Sys Jet Impingement Support Baseplate/Concrete Expansion Anchors Were Improperly Installed,Due to Ineffective Work Practices & QA Program. Review Will Be Completed + (ML20113F722)
- ML20113F729 + (ML20113F729)
- ML20113F744 + (ML20113F744)
- ML20113F749 + (ML20113F749)
- ML20113F755 + (ML20113F755)
- ML20113F776 + (ML20113F776)
- 3F0420-03, Supplemental Information in Support of Crystal River Unit 3 License Transfer Application - Amended License Conditions + (ML20113F777)
- ML20113F796 + (ML20113F796)
- ML20113F816 + (ML20113F816)
- ML20113F848 + (ML20113F848)
- ML20113F856 + (ML20113F856)
- PLA-2389, Forwards Response to Enforcement Action 84-109 Resulting from Violations & Deviation Noted in Insp Rept 50-388/84-34.Corrective Action:Addl Training Conducted Re Proper Procedures for Racking Out Breakers.Fee Paid + (ML20113F863)
- ML20113F870 + (ML20113F870)
- ML20113F882 + (ML20113F882)
- ML20113F903 + (ML20113F903)
- 05000336/LER-1995-019-01, Forwards LER 95-019-01.Util Commitments Listed,Including Reviews of Operation Procedures to Be Completed by 961115 + (ML20113F909)
- ML20113F927 + (ML20113F927)
- ML20113F935 + (ML20113F935)
- ML20113F952 + (ML20113F952)
- ML20113F969 + (ML20113F969)
- ML20113F993 + (ML20113F993)
- ML20113G002 + (ML20113G002)
- ML20113G003 + (ML20113G003)
- 2CAN128406, Monthly Operating Rept for Nov 1984 + (ML20113G009)
- ML20113G017 + (ML20113G017)
- ML20113G021 + (ML20113G021)
- ML20113G023 + (ML20113G023)
- 1CAN128404, Monthly Operating Rept for Nov 1984 + (ML20113G033)
- ML20113G037 + (ML20113G037)