Monthly Operating Rept for Nov 1984
ML20113G023
Person / Time
Site: Beaver Valley
Issue date: 11/30/1984
From: Carey J, Eicher J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8501240215
Download: ML20113G023 (6)


Text

r I..

s g-OPERATI G DATA REPORT DOCKET NO. 50-334 DATE 12/5/84 COMPLETED BY

_J.

Eicher TELEPHONE. 417-541-1825 OPERATING STATUS

1. Unit Name:. Beaver Valley Power Station. Unit #1 Notes
2. Reporting Period:

November, 1984

3. Licensed Thermal Power (MWt):

2660

4. Nameplate Rating (Gross MWe):

923 S. Design Electrical Rating (Net MWe).

835

6. Maximum Dependable Capacity (Gross MWe):

860

7. Maximum Dependable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):

None

10. Reasons For Restrictions. If Any:

N/A

'Iltis Month Yr.-to.Date

' Cumulative II. Hours in Reporting Period 720 8040 75,264

12. Number Of Hours Reactor Was Critical 0

6476.3 37,355.7

13. Reactor Reserve Shutdown Hours 0

0 4,482.8

14. Hours Generator On-Line 0

6304.1 36,082.9 IS. Unit Reserve Shutdown Hours 0

0 0

16. Gross Therma! Energy Generated (MWH) 0 15,808.975 83,398,514 17 Gross Electrical Energy Generated (MWH) 0 5.065.500 26,494,400
18. Net Electrical Energy Generated (MWH)

-3010 4,743,825 24,632,713

19. Unit Service Factor 0

78.4 50.2

20. Unit Availability Factor 0

78.4 50.2

21. Unit Capacity Factor (Using MDC Net)

O 72.8 43.9

22. Unit Capacity Factor (Using DER Net) 0 -

70.7 42.6

23. Unit Forced Outage Rate 0

3.0 27.1

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Plant shutdown for 4th refueling began October 11 at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />.

Scheduled duration: 86 days j

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

December 29, 1984

26. Units In Test Status (Prior te Commercial Operation):

Forecast Achieved INITIAL CRITICA LITY N/A N/A INITIAL ELECTRICITY N/A N/A g

COMMERCIAL OPERATION N/A N/A 8501240215 841130 (9/77)

PDR ADOCK 05000334 R

PDR l

f

/'

AVERAGE DAILi UNIT POWER LEVEL DOCKET NO.

50-334 (JNIT 3VSS U::1:: di DATE 12/5/84 COMPLETED BY 3.

R.

Eicher TELEPHONE (412) 643 1825 MONTH November, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NetI (MWe-NetI 0

0 g

7 2

0 0

gg 3

0 0

39 4

0 0

20 0

0.

21 0

6

~

0 0

~

7 23 0

0 8

0 9

33 0

0 10 26 0

O II 27 0

0 3

3 0

13 g

0 0

14 30 0

15 31 0

0 16 i

]

INSTRUCTIONS On this format. list the average daily unit power lese!in MWe. Net br each day in the reportine month. Compute to the nearest whole mepwatt.

(9/77)

~

\\

T UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKETNO.

50-334 UNIT NAME BVPS Unit #1 DATE 12/5/84 REPORT MON'ilg November,1984 COMPLETED RY J.

R.

Eicher TELErilONE _(412) 643-1825~

"s

=

j.w e g

=

2E s

sy Eicensee

$-e, 3%

Cauw A Correttise

\\"-

U 8'C i

35 4

2 5 cr:

Event 37 53 Attion to 3E j@g Repine 8 WU j'

Preveni Recurrente 6

11 11/1/84 S

720 C

4 N/A

.ZZ ZZZZZZZ Station remained shutdown for 4th refueling outage.

1 I

2 3

4 F: F.nted Reason:

trethod:

Exhibit G. Insisuttions 5: Schedu'ed A.Equipnwnt Failure (Explain) 1-Manual lin Pseparation ol' Data B. Maintenance of Test 2-Manual Scram Entr> Sheets for 1.icemce C Refueling 3-Automatic Scram Eveni Reposi llTRil de lNilRI G D.Regulaine) Restelcliin' 4-Continued From Previous Month Ultill l' Opcialin Training & 1.icense I:xaniinatiini 8

5-Reiuction F Admisiistrative 9-Other G. Operational 1:s sin ll:xplain t Estphit i Same Souwe 07/77)

Il-Olher IExplain t

1 3

,9 V4

'A@

Telepnone (412) 393-6000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004 December 10, 1984 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report United States Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D.C.

20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of November, 1984.

Very tia y yours, V

J.

Carey Vice President Nuclear Group Enclosures cc: NRC Regional Of fice, King of Prussia, PA l

f6Y

. l

.4;

. i Narrative Summary of Monthly.

' Operating Experience - November 1984

-November 1-The-station was in cold' shutdown for 4th Refueling and through; major modifications. Began removing fuel.from the November 30 reactor vessel 'at 0840 on the 8th.-

Refueling was completed on November 22.

Reactor Coolant System Tavg and Pressure at ambient conditions.

I

?

J t

T e

v

,.,r m

+

.we, e

~ -

o s.

Major Maintenance -- November' 1984

-1.

10-year Inservice Inspection of welds in Containment (Phase I & II).

2.

Reactor Coolant Pumps (RC-P-1A, 1B, IC]cFlywheel inspection.

3. '

Reactor Coolant Pumps [RC-P-1A, IB,-lC] Seal Inspection and Maintenance.

4.

Inspection of 1A Steam Generator primary side and IC Steam Generator Secondary Side.

5.

Retube of the Main Condenser.

6.-

Replacement. of First Point Feedwater. Heaters [FW-E-1A, 1B].

7.

Inspection of the Main Unit Generator.

. _i