r I..
s g-OPERATI G DATA REPORT DOCKET NO. 50-334 DATE 12/5/84 COMPLETED BY
_J.
Eicher TELEPHONE. 417-541-1825 OPERATING STATUS
- 1. Unit Name:. Beaver Valley Power Station. Unit #1 Notes
- 2. Reporting Period:
November, 1984
- 3. Licensed Thermal Power (MWt):
2660
- 4. Nameplate Rating (Gross MWe):
923 S. Design Electrical Rating (Net MWe).
835
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
- 10. Reasons For Restrictions. If Any:
N/A
'Iltis Month Yr.-to.Date
' Cumulative II. Hours in Reporting Period 720 8040 75,264
- 12. Number Of Hours Reactor Was Critical 0
6476.3 37,355.7
- 13. Reactor Reserve Shutdown Hours 0
0 4,482.8
- 14. Hours Generator On-Line 0
6304.1 36,082.9 IS. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Therma! Energy Generated (MWH) 0 15,808.975 83,398,514 17 Gross Electrical Energy Generated (MWH) 0 5.065.500 26,494,400
- 18. Net Electrical Energy Generated (MWH)
-3010 4,743,825 24,632,713
- 19. Unit Service Factor 0
78.4 50.2
- 20. Unit Availability Factor 0
78.4 50.2
- 21. Unit Capacity Factor (Using MDC Net)
O 72.8 43.9
- 22. Unit Capacity Factor (Using DER Net) 0 -
70.7 42.6
- 23. Unit Forced Outage Rate 0
3.0 27.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Plant shutdown for 4th refueling began October 11 at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />.
Scheduled duration: 86 days j
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
December 29, 1984
- 26. Units In Test Status (Prior te Commercial Operation):
Forecast Achieved INITIAL CRITICA LITY N/A N/A INITIAL ELECTRICITY N/A N/A g
COMMERCIAL OPERATION N/A N/A 8501240215 841130 (9/77)
PDR ADOCK 05000334 R
PDR l
f
/'
AVERAGE DAILi UNIT POWER LEVEL DOCKET NO.
50-334 (JNIT 3VSS U::1:: di DATE 12/5/84 COMPLETED BY 3.
R.
Eicher TELEPHONE (412) 643 1825 MONTH November, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NetI (MWe-NetI 0
0 g
7 2
0 0
gg 3
0 0
39 4
0 0
20 0
0.
21 0
6
~
0 0
~
7 23 0
0 8
0 9
33 0
0 10 26 0
O II 27 0
0 3
3 0
13 g
0 0
14 30 0
15 31 0
0 16 i
]
INSTRUCTIONS On this format. list the average daily unit power lese!in MWe. Net br each day in the reportine month. Compute to the nearest whole mepwatt.
(9/77)
~
\\
T UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKETNO.
50-334 UNIT NAME BVPS Unit #1 DATE 12/5/84 REPORT MON'ilg November,1984 COMPLETED RY J.
R.
Eicher TELErilONE _(412) 643-1825~
"s
=
j.w e g
=
2E s
sy Eicensee
$-e, 3%
Cauw A Correttise
\\"-
U 8'C i
35 4
2 5 cr:
Event 37 53 Attion to 3E j@g Repine 8 WU j'
Preveni Recurrente 6
11 11/1/84 S
720 C
4 N/A
.ZZ ZZZZZZZ Station remained shutdown for 4th refueling outage.
1 I
2 3
4 F: F.nted Reason:
trethod:
Exhibit G. Insisuttions 5: Schedu'ed A.Equipnwnt Failure (Explain) 1-Manual lin Pseparation ol' Data B. Maintenance of Test 2-Manual Scram Entr> Sheets for 1.icemce C Refueling 3-Automatic Scram Eveni Reposi llTRil de lNilRI G D.Regulaine) Restelcliin' 4-Continued From Previous Month Ultill l' Opcialin Training & 1.icense I:xaniinatiini 8
5-Reiuction F Admisiistrative 9-Other G. Operational 1:s sin ll:xplain t Estphit i Same Souwe 07/77)
Il-Olher IExplain t
1 3
,9 V4
'A@
Telepnone (412) 393-6000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004 December 10, 1984 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report United States Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D.C.
20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of November, 1984.
Very tia y yours, V
J.
Carey Vice President Nuclear Group Enclosures cc: NRC Regional Of fice, King of Prussia, PA l
f6Y
. l
.4;
. i Narrative Summary of Monthly.
' Operating Experience - November 1984
-November 1-The-station was in cold' shutdown for 4th Refueling and through; major modifications. Began removing fuel.from the November 30 reactor vessel 'at 0840 on the 8th.-
Refueling was completed on November 22.
Reactor Coolant System Tavg and Pressure at ambient conditions.
I
?
J t
T e
v
,.,r m
+
.we, e
~ -
o s.
Major Maintenance -- November' 1984
-1.
10-year Inservice Inspection of welds in Containment (Phase I & II).
2.
Reactor Coolant Pumps (RC-P-1A, 1B, IC]cFlywheel inspection.
- 3. '
Reactor Coolant Pumps [RC-P-1A, IB,-lC] Seal Inspection and Maintenance.
4.
Inspection of 1A Steam Generator primary side and IC Steam Generator Secondary Side.
5.
Retube of the Main Condenser.
6.-
Replacement. of First Point Feedwater. Heaters [FW-E-1A, 1B].
7.
Inspection of the Main Unit Generator.
. _i