ML20113F935
| ML20113F935 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 01/17/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20113F939 | List: |
| References | |
| TAC-56777, TAC-56778, NUDOCS 8501240180 | |
| Download: ML20113F935 (3) | |
Text
.
DUKE POWER GOMPANY P.O. BOX 03189 CmutLOTTE. N.C. 28242 HAL B. TUCKER Teternown voce reseroewe (704) 373-4 Sag wressan enoescreen January 17, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4
Subject:
McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Technical Specification Amendment Dose Projections for Routine Releases
Dear Mr. Denton:
Attached are proposed license amendments to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.
The proposed changes to the McGuire Technical Specifications furnish a needed clarification to surveillance requirements 4.11.1.3.1 and 4.11.2.4.1 which govern the preparation of projected doses for liquid and gaseous releases to unrestricted areas. At present, all planned radioactive releases are processed by the radwaste treatment systems to ensure that only the lowest possible levels of radioactive effluents are released. Therefore dose projections are not required for pretreated releases and are only required when radwaste treatment systems are not used.
Attachment I contains the proposed changes for the Technical Specifications.
Attachment II provides the Justification and Safety Analysis in support of the proposed changes. Attachment III provides an analysis conducted in accordance with the standards contained in 10CFR50.92, as required by 10CFR50.91. This analysia concludes that the proposed changes to the Technical Specifications would not have any adverse safety implications.
This request involves one application for amendment to McGuire's Technical Specifications. Accordingly, pursuant to 10CFR 170.21 a check.for $150.00 is enclosed.
Please feel free to contact us if you require any additional information.
Very truly yours.
A Hal B. Tucker
/
\\
WHMcD/mjf 8501240100 850117 PDR ADOCK 05000369 Attachment P
PDR I I dh t#)')4 W O
m Mr. Harold R. Denton, Director January 17. 1985 Page Two Mr. James P. O'Reilly, Regional Administrator cc:
U. S. Nuclear Regulatory Commission
~ Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 W. T. Orders Senior Resident Inspector McGuire Nuclear Station 1
i s
n-Mr. Harold R. Denton, Director January 17, 1984 Page Three HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17 and that all statements and matters set forth therein are true and correct to the best of his knowledge.
~bk Hal B. Tucker, Vice President Subscribed and sworn to before me this 17th day of January,1985.
' - Al
/12 Notary Public My Commission Expires:
cLtA u
/Nr V