Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20105B022 + (ML20105B022)
- ML20105B025 + (ML20105B025)
- ML20105B031 + (ML20105B031)
- ML20105B039 + (ML20105B039)
- ML20105B046 + (ML20105B046)
- ML20105B081 + (ML20105B081)
- ML20105B095 + (ML20105B095)
- ML20105B102 + (ML20105B102)
- JPN-92-048, Updates 801104 Response to NRC Bulletin 80-11, Masonry Wall Design. of 83 safety-related Wall Sections Listed in Field surveys,18 Did Not Have Hardware Cloth.All Wall Sections Listed in Bulletin Meet Acceptance Criteria + (ML20105B123)
- 05000482/LER-1992-013, :on 920814,determined That Sp for Trip Actuating Device Operational Test Manual Reactor Trip Did Not Properly Test Rtb Actuation Function.Caused by Personnel Error.Sp Revised to Include Trip Blocking + (ML20105B136)
- ML20105B140 + (ML20105B140)
- ML20105B157 + (ML20105B157)
- ML20105B158 + (ML20105B158)
- 05000275/LER-1985-003, :on 850105,while in Mode 1,diesel Generator (Ek) 1-1 Started Automatically Due to Undervoltage on 4 Kv Bus H.Event Classified as Anticipated Operational Transient + (ML20105B177)
- TXX-9239, Forwards Major Milestone Schedule & Portions of Part 21 Open Items List of Issues Currently Under Review,Per 920729 Discussion W/Nrc.Open Items Include,Pacific Air Balance Damper Actuators & Dresser Masoneilan Products + (ML20105B194)
- ML20105B195 + (ML20105B195)
- ML20105B199 + (ML20105B199)
- ML20105B203 + (ML20105B203)
- ML20105B206 + (ML20105B206)
- 05000373/LER-1984-093-01, :on 841219,plastic Bag Containing Radioactive Debris Found in Turbine Bldg Laundry Sample Tank Room (non-high Radiation Area).Cause Not Stated.Debris Removed to Secured High Radiation Area + (ML20105B210)
- 05000397/LER-1985-004, :on 850116,determined That 841226 Discovery of Failure to Perform Weekly Fire Pump Battery Surveillance Reportable.Caused by Deficiency in Program Scheduling. Surveillance Scheduling Procedures Revised + (ML20105B212)
- 05000338/LER-1984-022, :on 841127,fire Protection Sys Main Header Ruptured,Causing Sys to Be Inoperable.Caused by Pipe Crack Probably Occurring During Installation.Ruptured Section of Pipe Replaced + (ML20105B219)
- RBG-19963, Final Deficiency Rept DR-225 Re Velan Engineering,Ltd Supplied Motor Operated Valve Motors W/Higher Stall Torques than Required by Specs.Initially Reported on 841221.Complete SMB2-40 Actuators Will Be Used as Replacements + (ML20105B221)
- ML20105B222 + (ML20105B222)
- 05000333/LER-2020-002, Unanalyzed Condition Due to Unprotected Control Circuits Running Through Multiple Fire Areas + (ML20105B225)
- ML20105B230 + (ML20105B230)
- ML20105B235 + (ML20105B235)
- ML20105B246 + (ML20105B246)
- ML20105B247 + (ML20105B247)
- 05000352/LER-1985-042, :on 841231,during Startup,Drywell Radiation Monitoring Sys Supply & Return Isolation Valves SV-026-190A & SV-026-190C Failed to Close Automatically.Caused by Incorrect Wiring.Control Logic Rewired + (ML20105B254)
- 05000454/LER-1985-001-02, :on 850103,auxiliary Bldg Vent Stack Monitor Tripped Due to Filter Loading.Caused by Personnel Error. Particulate Filter Collected from Monitor But Not Analyzed as Required to Meet Tech Specs + (ML20105B256)
- ML20105B260 + (ML20105B260)
- TXX-2003, Response to Request for Additional Information Regarding Exigent License Amendment 20-003 Revision to Technical Specification 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program + (ML20105B268)
- 05000278/LER-1985-001-02, :on 850101,w/plant at 85% Power,Inverter Supplying Power to HPCI Instrumentation Failed.Caused by Three Failed Microfared Capacitors.Hpci Declared Inoperable Until Failed Inverter Replaced + (ML20105B274)
- RBG-19958, Interim Deficiency Rept DR-229 Re Defective in-core Guide Tube Stabilizers Supplied by Ge.Interim or Final Status Rept Will Be Provided by 850306 + (ML20105B287)
- 05000237/LER-1985-002-02, :850103,interlock Doors Simultaneously Opened. Caused by Doors Closing Too Quickly & Bouncing Back.Closure Arms for Interlock Doors Adjusted to Allow Slower Closing + (ML20105B289)
- ML20105B298 + (ML20105B298)
- ML20105B301 + (ML20105B301)
- 05000237/LER-1985-001-03, :on 850104,4-kV Breaker 2329 Failed to Trip Open During Breaker Differential Relay Testing.Caused by Cut Wires in Tripping Logic.Wires Reconnected + (ML20105B309)
- ML20105B332 + (ML20105B332)
- 05000333/LER-1985-001, :on 850104,HPCI Steam Supply Isolation Valve Breaker Alarm Relay Failed.Necessary Repairs Resulted in HPCI Sys Being Declared Inoperable for 2 1/2 H.Caused by Faulty Dc Coil + (ML20105B343)
- ML20105B356 + (ML20105B356)
- RBG-19959, Interim Deficiency Rept DR-215 Re Uninterruptible Power Supply Inverters Supplied by Elgar Corp.Interim or Final Status Rept Will Be Provided by 850207 + (ML20105B360)
- ML20105B365 + (ML20105B365)
- ML20105B375 + (ML20105B375)
- PY-CEI-NRR-1545, Monthly Operating Rept for Aug 1992 for Perry Nuclear Power Plant Unit 1 + (ML20105B382)
- ML20105B387 + (ML20105B387)
- RBG-37490, Monthly Operating Rept for Aug 1992 for River Bend Station, Unit 1 + (ML20105B388)
- HL-2914, Monthly Operating Repts for Aug 1992 for Ei Hatch Nuclear Plant,Units 1 & 2 + (ML20105B395)
- 05000328/LER-1984-021-02, :on 841229,reactor Trip Occurred on Loop 4 lo-lo Steam Generator Water Level.Caused by Operator Error. Post-trip Evaluations Performed.No Abnormalities Noted + (ML20105B398)
- 1CAN099204, Monthly Operating Rept for Aug 1992 for Arkansas Nuclear One Unit 1 + (ML20105B402)