Monthly Operating Repts for August 1992 for Catawba Nuclear Units 1 & 2
ML20105B365
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/1992
From: Simmons N, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20105B368 List:
References
NUDOCS 9209180325
Download: ML20105B365 (10)


Text

_ _. -

4 1-i l

}

OPERATINS DATA PIFORT

}

i DOCKET ND 50-413 DATE September 15. 1992 l

OPEFATING STATUS COMPLETED BY R.A. Williaes -

!1 TELEPHONE 704-382-5346 l

1. Unit Nase: Catasha 1 i
2. Reporting Perico: August 1, 1992-August 31, 1992 f
3. Licensed Thereal Power (MWt):

3411 i

4. Naseplate Rating (Bross MWe):

1305*

Notes *Naseplate Rating

5. Design Electrical Rating (het MWe):

1145 (Bross MWel calculated as

6. Muisus Dependable Capacity (Gross MWe):

1192 1450.000 MVA x.90 power

7. Marinus Deptndable Capacity (Net MWe):

1129 factor per Page lii, NUREG-0020.

O. If Changes Occur in Capacity Ratings (!!eas Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To Which Restricted, if Any (Net MWe):
10. Reason For Restrictions. If any:

1 i

This Month Yr.-to-Date Cuaulative

11. Hours In Reporting Period 744.0 5955.0.

62904.0

12. Number Of Hours Raatter Was Critical 0.0 4605.0-46995.3-
13. Reactor Reserve Sa ldown Hours

- --0--

- 14. Hours Generator On-Line

. 0.0 4604.5-46000.4

15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. Gross Thersal Energy Generated (MWH) 0 15339142 148624447
17. Gross Electrical Energy Generated (MWH) 0 5433639 52303043
18. Net Electrical Energy Generated (MWil)

-6604 5140649 49074343

19. Unit Service Facter 0.0 78.6 -

73.1

20. Unit Availability Factor 0.0 78.6 73.1
21. Unit Capacity Factor (Using M?C Net)'

O.0 77.8-68.8

22. Unit Capacity Factor (Using IER Net) 0.0 76.7 69.1
23. Unit Forced Outage Rate 0.0 0.0 10.5
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Currently Refueling

25. If Shut D'M At End Of Report Period. Estiaated Date of Startup: September 25, 1992
26. Units in Test Status (Prier to Coseercial Operation):

Forecast Achieved INITIAL CRITICALITY

.I INITIAL ELECTRICITY CO M RCIAL OPERATION

-i k

l 9209180325-920931 pDR R

ADOCK.05000413 PDR r

i 4

s s

2 t-l' i:

0FERAllNS DATA REPORT i

t a

i f

i DOCKET NO:

50-413

{

UNii Catamba i DATE Sectember 15, 1992 l

l COMPLETED BY R.A. Williaes 1

1 TELEPHONE -704-382-5346 l-t 2.

j 904TH Auaust,1992 j

QAl AVERa6E LAILY POWER LEVEL

- [AY.

AVERAGE DAILY F0WER LEVEL 5

I (MWe Net)

(MWe-Net).

r.

I 1

0 17 0

1 i

2 0

12 0

4 i -

j 3

0 19

,0 t

l 4

0 20 0

4.I 1

5 0

21 0

1 l

6

._0 0 j>

1 7.

0 23

_0 z

i 8

l 8

i 24 0

9 0

25' 0

10 0

26 0-i i

11 C

27 0

4 1-12-0 28 -

0 4

l

.13 -

0 29 0

14 0

.30

'O

!i 15 -

0 31

-0'

~

1 j

' 16 0

i 4

i-1 1 --

4 t

.. - w...

... ~......-. -,-.. - -.. ~..... ~.. -,..

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413 UNIT NAME CATAwun 1 DATE 09/1 b/ 9 2 REPORT MONTH August 1992 COMPLETED BY H.

C.

s1MMUNs TELEPHONE

(/04)-Ju2-3203 l(1) 2)

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 1

92 1 S

744.00 C

1 RC FUELXX END-OF-CYCLE 6 REFUELING OUTAGE 1

(1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit G Instructions A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data S Scheduled 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Autom-tic Scram Event Report-(LER) j D-Regulato n Restriction 4-Other (Explain)

File (NUREG-0161)

.E-Operator Training & License Examination F-Administrative (S)

G-Operator Error'(Explain)

Exhibit I - Same Source H-Other (Explain)

. h 1

i l

F a

s i

4 DOCKET NO:

50-413

?

UNIT:

Catawba 1.

DATE:

9/15/92 4

1-i NARRATIVE

SUMMARY

i

(

MONTH: August 1992 1

j

. Catawba Unit 1 began the month of August-end-of-cycle _ 6-refueling j

outage. The unit remainder in the outage for the entire month.

i Ii; i

4

(

i i

l 1

i' 1 --

4-d a

1-p-

J-i i

1 j.

i jl Prepared by: 'N.

C. Simmons-

]

Telephone:

704'-382-5263 d

3 A

4 4-4:

I H.

W

=

i..~..-r e-

..-5

.I v.

,,w.,

,,,,m,-wwy,n-,

,4w v..e, c e' y

j i

MONTHLY REFUELING INEQRMATION REOUEST i

}

1.

Facility name: Catawba.

Unit 1 1

1 2.

Scheduled next refueling shutdown: July 1992 l

3.

Scheduled restart following refueling: September 1992 i

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT.

THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l 4.

Will refueling or resumption of. operation thereafter require a technical specification change or other license amendment?

?

j If yes, what will these be?

{

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety queFtions?

I

~

5.

Scheduled date(s) for submitting proposed licensing action and j

supporting information.

l 6.

Important licensing considerations (new or different design or

supplier, unreviewed design or performance analysis methods, significant changes in design.or new operating-procedures).

?

7.

Number of Fuel assemblies (a) in the core: 121 j

(b) in the spent fuel pool: 428 8.

Present licensed fuel pool capacity: 1418 l

Size of requested or planned increase: -

1 II 9.

Projected date of last refueling which can be accommodated by j

present licensed capacity: September 2009

}

DUKE POWER COMPANY DATE:

Sectember 15, 1992 Name of

Contact:

R.

A.

Williams Phone:

704-382-5346 j

4 I

i i

l' l

4 i

l

1 i

I d

l e

{

OPERATING DATA REPORT DOCKET ND 50-414

- DATE Septesber' 15. 1992

!~

OPERATING STATUS COMPLETED BY P.A. Williaes IELEPHONE 704-382-5346 i

1. Unit Nase Catawba 2 l
2. Reporting feriod: August 1, 1912-August 31,1992 1
3. Licensed Thereal Power (MWt):

3411 l

4. Naseplate Rating (6ross MWel:

1305*

Notes. *Naseplate Rating i

5. Design Electrical Rating (Net MWe):

1145 (Gross MWel calculated as

6. Maxisue Dependable Capacity (Gross MWe):

!!92 1450.000 MVA x.90 power l

7. Maxinus Dependable Capacity (Net MWe):

1129 factor per Page lii,.

8. If Changes Occur in Capacity Ratings (! tees Nusber 3 Through 7) Since Last NUREG-0020.

4 l

Recort. Give Reasons -

l

9. Power Level To Which Restricted, if Any (Net MWe):

i 10, Reason For Restrictions, If any:

i 4

This Month Yr.-to-Date Cumulative 3

!!. Hours In Reporting Period 744.0 5855.0 52920.0

12. Number Of Hours Reactor Was Critical 744,0 5832.4 40130.0 l
13. Reactor R: serve Shutdewn Hours -

--0--

--0--

1

14. Hours Senerator Dn-Line 744.0 5801.9 39365.1
15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

l; ~

16. Gross Thersal Er,ergy Benerated (NH) 2470833 19365165 124491342
17. Gross Electrical Energy Generated (MWH)-_

B75296 6871158-44047063 l-

18. Net Electrical Energy Generated (MWH) 829730 6518913 41372782

).

19. Unit Service Factor 100.0-

'.99.1 74.4 20, Unit Availability Fatter 100.0 99.1 74.4 j

21. Unit Capacity Factor (using MDC Net) 98.8

-98.6 69.0

22. Unit Capacity Factor (Using CER Net!

97.4 97.2 68.3

23. Unit Forced Cutage Rate 0.0 0.7 11.5
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

_Refueline- - January 30. 1993 - 65 days

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

j

26. Units In Test Status (Prior to Consercial Operation):

. Forecast Achieved-l INITIAL CRITICALITY INITIAL ELECTRICITY CCMERCIAL OPERATION l

Y d

w

=,

,t v vr

+-y 4< -

,s-,

,--,r-w- -- c y T -e-w,w r e, ry,enwn y s c__n,,,,w-vu

,re-,-.y-vy-w..r,w,,rev-,-rwy,%

  • ,v,

..y, p-se.

.,-,m*w cwr*

-e--wm,,,

5 f- +

4 I

i 0FERAllh6 DATA REPORi i:

DOCKET NO 50-414 I

UNIT Catauba 2

{.-

DATE September 15. 1992 COMPLETED BY R.A. Williaes

)

TELEPHONE 704-382-5346 h

80 NTH

-Auwst. '992 ii.

iL E

D

- AVERAGE DAILY POWEk LEVEL DE AVERABE DAILY POWER LEVEL l'

(MWe-Net)

(MWe-Neti s

1

-1125 l

17 1125 i.

2 11P3 18 1123 i

i --

3 1121 19 -

!!23 t.

I 4

1120 20 1122 a

.i i

5 1162 21' 1124 a

i 6

1125 22 1114 i

-7

!!Es 23 899 3

?

9 1120 24 1105 1-9 1117

_ 25 -

1118 i

10

!!21 26-1116 11 1119 1116-1 I

12 1120 28 1115 I -

13 1123 '

29

-1126-1-

14

'1127 30 1125 I

15

-!!26 31

!!20 i.

~ 16 1126-e F

4-i.

i..

4

~,:.;.,,...,.,~..,,.......-.,,~,.,,,;.._,__,_,,4,.,.,.;;,,,....,-;....,-

,,__,,,_...._.._..,_,_w...

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 UNIT NAME CATAwim z DATE uv/id/9z REPORT MONTH August 1992 COMPLETED BY H.

C.

s1MMuus TELEPHONE-t/041-Juz-azoa.

(1) 2)

(4)

(5)

E HOD T

A' OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE A

HB VALVEX CONTROL VALVE #3 REPAIR 13-P 92-8-23 F

A HB VALVEX CONTROL VALVE #3 REPAIR 14-P 92-8-23 F

(1 (2)

(3)

(4)

Forced Reason

  • Method:

Exhibit G - Instructions 1-Manual for Preparation of, Data A-Equi ment FailureB-Main enance or test (Explain)

S Scheduled 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram Eyent Report -(LER)

D-Regulato n Restriction 4-Othe.r (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5 xhibit I - Same Source H-Other (Explain) (Explain)

G-Onerator Error

~

m_

1 11 i

i.

L' DOCKET NO:.50-414 t

i j

UNIT: Catawba-2.

i DATE: 9/15/92 NARRATIVE

SUMMARY

i-l f

i-MONTH: August 1992-l Catawba Unit 2 began the month of August operating at 100%.fu11 power.

l The unit operated at or'near 100% full power until 8/22 at 2000 when.

the unit started'a power _ decrease.

The unit held at 90% power from 2315 j

to 8/23 at 1020-for the main turbine control valve movement-test.

During testing, control valve #3 went closed and would not reopen, the i

unit started a power decrease to repair the_ valve at 1042. -The unit

}-

held at 68% power from 1314 to 1350'for control valve #3 repa*ra and at-

~

t 67% from 1410 to 1942 for control #3 repairs.

The unit started power 4

escalation and held at 88% power from 2330 to 8/24 at 0.100 for the-control valve movement test and reached 100% full power ac 0507-.

The j

unit operated at 100% full power for the remainder of the month.

I i

s i-I-

4 1-i bc i

4-i' i

n.

]

-Prepared by:

N. C. Simmons

(

' Telephone:

704-382-5263 j

.i 1

)

i 1

i

)

3

4 MONTHLY REFUELING INFORMATION REOUES_I i

l 1.

Facility name: Catpwba.

linit 2 l

2.

Scheduled next refueling shutdown: February 1993 L

3.

Scheduled restart following-refueling: April 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j.

ANY T.S.

CHANGE OR. LICENSE AMENDMENT.

THEREFORE, ' QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter.- require a i

technical specification change or other license amendment?

i l

If yes, what will these be?

}

If no, has reload design and core configuration been reviewed by i

Safety Review Committee regarding unreviewed safety questions?

I 5.

Scheduled date(s) for submitting proposed licensing action and j

supporting information.

h 6.

Important licensing considerations (new or different design or

supplier, unreviewed design or performance analysis methods, j

significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 280 f.

8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -

t 9.

Projected date of last refueling which can:be accommodated - by present licensed capacity: Sentember 2011 s

DUKE POWER COMPANY DATE:

September 15. 1992 Name of

Contact:

R.

A.

Williams Phone:

704-38i-5346 l

l.

l' i