Text
_ _. -
4 1-i l
}
OPERATINS DATA PIFORT
}
i DOCKET ND 50-413 DATE September 15. 1992 l
OPEFATING STATUS COMPLETED BY R.A. Williaes -
!1 TELEPHONE 704-382-5346 l
- 1. Unit Nase: Catasha 1 i
- 2. Reporting Perico: August 1, 1992-August 31, 1992 f
- 3. Licensed Thereal Power (MWt):
3411 i
- 4. Naseplate Rating (Bross MWe):
1305*
Notes *Naseplate Rating
- 5. Design Electrical Rating (het MWe):
1145 (Bross MWel calculated as
- 6. Muisus Dependable Capacity (Gross MWe):
1192 1450.000 MVA x.90 power
- 7. Marinus Deptndable Capacity (Net MWe):
1129 factor per Page lii, NUREG-0020.
O. If Changes Occur in Capacity Ratings (!!eas Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWe):
- 10. Reason For Restrictions. If any:
1 i
This Month Yr.-to-Date Cuaulative
- 11. Hours In Reporting Period 744.0 5955.0.
62904.0
- 12. Number Of Hours Raatter Was Critical 0.0 4605.0-46995.3-
- 13. Reactor Reserve Sa ldown Hours
- --0--
- 14. Hours Generator On-Line
. 0.0 4604.5-46000.4
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thersal Energy Generated (MWH) 0 15339142 148624447
- 17. Gross Electrical Energy Generated (MWH) 0 5433639 52303043
- 18. Net Electrical Energy Generated (MWil)
-6604 5140649 49074343
- 19. Unit Service Facter 0.0 78.6 -
73.1
- 20. Unit Availability Factor 0.0 78.6 73.1
- 21. Unit Capacity Factor (Using M?C Net)'
O.0 77.8-68.8
- 22. Unit Capacity Factor (Using IER Net) 0.0 76.7 69.1
- 23. Unit Forced Outage Rate 0.0 0.0 10.5
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Currently Refueling
- 25. If Shut D'M At End Of Report Period. Estiaated Date of Startup: September 25, 1992
- 26. Units in Test Status (Prier to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY
.I INITIAL ELECTRICITY CO M RCIAL OPERATION
-i k
l 9209180325-920931 pDR R
ADOCK.05000413 PDR r
i 4
s s
2 t-l' i:
0FERAllNS DATA REPORT i
t a
i f
i DOCKET NO:
50-413
{
UNii Catamba i DATE Sectember 15, 1992 l
l COMPLETED BY R.A. Williaes 1
1 TELEPHONE -704-382-5346 l-t 2.
j 904TH Auaust,1992 j
QAl AVERa6E LAILY POWER LEVEL
- [AY.
AVERAGE DAILY F0WER LEVEL 5
I (MWe Net)
(MWe-Net).
r.
I 1
0 17 0
1 i
2 0
12 0
4 i -
j 3
0 19
,0 t
l 4
0 20 0
4.I 1
5 0
21 0
1 l
6
._0 0 j>
1 7.
0 23
_0 z
i 8
l 8
i 24 0
9 0
25' 0
10 0
26 0-i i
11 C
27 0
4 1-12-0 28 -
0 4
l
.13 -
0 29 0
14 0
.30
'O
!i 15 -
0 31
-0'
~
1 j
' 16 0
i 4
i-1 1 --
4 t
.. - w...
... ~......-. -,-.. - -.. ~..... ~.. -,..
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CATAwun 1 DATE 09/1 b/ 9 2 REPORT MONTH August 1992 COMPLETED BY H.
C.
s1MMUNs TELEPHONE
(/04)-Ju2-3203 l(1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 1
92 1 S
744.00 C
1 RC FUELXX END-OF-CYCLE 6 REFUELING OUTAGE 1
(1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G Instructions A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data S Scheduled 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Autom-tic Scram Event Report-(LER) j D-Regulato n Restriction 4-Other (Explain)
File (NUREG-0161)
.E-Operator Training & License Examination F-Administrative (S)
G-Operator Error'(Explain)
Exhibit I - Same Source H-Other (Explain)
. h 1
i l
F a
s i
4 DOCKET NO:
50-413
?
UNIT:
Catawba 1.
DATE:
9/15/92 4
1-i NARRATIVE
SUMMARY
i
(
MONTH: August 1992 1
j
. Catawba Unit 1 began the month of August-end-of-cycle _ 6-refueling j
outage. The unit remainder in the outage for the entire month.
i Ii; i
4
(
i i
l 1
i' 1 --
4-d a
1-p-
J-i i
1 j.
i jl Prepared by: 'N.
C. Simmons-
]
Telephone:
704'-382-5263 d
3 A
4 4-4:
I H.
W
=
i..~..-r e-
..-5
.I v.
,,w.,
,,,,m,-wwy,n-,
,4w v..e, c e' y
j i
MONTHLY REFUELING INEQRMATION REOUEST i
}
1.
Facility name: Catawba.
Unit 1 1
1 2.
Scheduled next refueling shutdown: July 1992 l
3.
Scheduled restart following refueling: September 1992 i
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l 4.
Will refueling or resumption of. operation thereafter require a technical specification change or other license amendment?
?
j If yes, what will these be?
{
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety queFtions?
I
~
5.
Scheduled date(s) for submitting proposed licensing action and j
supporting information.
l 6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis methods, significant changes in design.or new operating-procedures).
?
7.
Number of Fuel assemblies (a) in the core: 121 j
(b) in the spent fuel pool: 428 8.
Present licensed fuel pool capacity: 1418 l
Size of requested or planned increase: -
1 II 9.
Projected date of last refueling which can be accommodated by j
present licensed capacity: September 2009
}
DUKE POWER COMPANY DATE:
Sectember 15, 1992 Name of
Contact:
R.
A.
Williams Phone:
704-382-5346 j
4 I
i i
l' l
4 i
l
1 i
I d
l e
{
OPERATING DATA REPORT DOCKET ND 50-414
- DATE Septesber' 15. 1992
!~
OPERATING STATUS COMPLETED BY P.A. Williaes IELEPHONE 704-382-5346 i
- 1. Unit Nase Catawba 2 l
- 2. Reporting feriod: August 1, 1912-August 31,1992 1
- 3. Licensed Thereal Power (MWt):
3411 l
- 4. Naseplate Rating (6ross MWel:
1305*
Notes. *Naseplate Rating i
- 5. Design Electrical Rating (Net MWe):
1145 (Gross MWel calculated as
- 6. Maxisue Dependable Capacity (Gross MWe):
!!92 1450.000 MVA x.90 power l
- 7. Maxinus Dependable Capacity (Net MWe):
1129 factor per Page lii,.
- 8. If Changes Occur in Capacity Ratings (! tees Nusber 3 Through 7) Since Last NUREG-0020.
4 l
Recort. Give Reasons -
l
- 9. Power Level To Which Restricted, if Any (Net MWe):
i 10, Reason For Restrictions, If any:
i 4
This Month Yr.-to-Date Cumulative 3
!!. Hours In Reporting Period 744.0 5855.0 52920.0
- 12. Number Of Hours Reactor Was Critical 744,0 5832.4 40130.0 l
- 13. Reactor R: serve Shutdewn Hours -
--0--
--0--
1
- 14. Hours Senerator Dn-Line 744.0 5801.9 39365.1
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
l; ~
- 16. Gross Thersal Er,ergy Benerated (NH) 2470833 19365165 124491342
- 17. Gross Electrical Energy Generated (MWH)-_
B75296 6871158-44047063 l-
- 18. Net Electrical Energy Generated (MWH) 829730 6518913 41372782
).
- 19. Unit Service Factor 100.0-
'.99.1 74.4 20, Unit Availability Fatter 100.0 99.1 74.4 j
- 21. Unit Capacity Factor (using MDC Net) 98.8
-98.6 69.0
- 22. Unit Capacity Factor (Using CER Net!
97.4 97.2 68.3
- 23. Unit Forced Cutage Rate 0.0 0.7 11.5
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
_Refueline- - January 30. 1993 - 65 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
j
- 26. Units In Test Status (Prior to Consercial Operation):
. Forecast Achieved-l INITIAL CRITICALITY INITIAL ELECTRICITY CCMERCIAL OPERATION l
Y d
w
=,
,t v vr
+-y 4< -
,s-,
,--,r-w- -- c y T -e-w,w r e, ry,enwn y s c__n,,,,w-vu
,re-,-.y-vy-w..r,w,,rev-,-rwy,%
- ,v,
..y, p-se.
.,-,m*w cwr*
-e--wm,,,
5 f- +
4 I
i 0FERAllh6 DATA REPORi i:
DOCKET NO 50-414 I
UNIT Catauba 2
{.-
DATE September 15. 1992 COMPLETED BY R.A. Williaes
)
TELEPHONE 704-382-5346 h
80 NTH
-Auwst. '992 ii.
iL E
D
- AVERAGE DAILY POWEk LEVEL DE AVERABE DAILY POWER LEVEL l'
(MWe-Net)
(MWe-Neti s
1
-1125 l
17 1125 i.
2 11P3 18 1123 i
i --
3 1121 19 -
!!23 t.
I 4
1120 20 1122 a
.i i
5 1162 21' 1124 a
i 6
1125 22 1114 i
-7
!!Es 23 899 3
?
9 1120 24 1105 1-9 1117
_ 25 -
1118 i
10
!!21 26-1116 11 1119 1116-1 I
12 1120 28 1115 I -
13 1123 '
29
-1126-1-
14
'1127 30 1125 I
15
-!!26 31
!!20 i.
~ 16 1126-e F
4-i.
i..
4
~,:.;.,,...,.,~..,,.......-.,,~,.,,,;.._,__,_,,4,.,.,.;;,,,....,-;....,-
,,__,,,_...._.._..,_,_w...
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME CATAwim z DATE uv/id/9z REPORT MONTH August 1992 COMPLETED BY H.
C.
s1MMuus TELEPHONE-t/041-Juz-azoa.
(1) 2)
(4)
(5)
E HOD T
A' OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE A
HB VALVEX CONTROL VALVE #3 REPAIR 13-P 92-8-23 F
A HB VALVEX CONTROL VALVE #3 REPAIR 14-P 92-8-23 F
(1 (2)
(3)
(4)
Forced Reason
- Method:
Exhibit G - Instructions 1-Manual for Preparation of, Data A-Equi ment FailureB-Main enance or test (Explain)
S Scheduled 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram Eyent Report -(LER)
D-Regulato n Restriction 4-Othe.r (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5 xhibit I - Same Source H-Other (Explain) (Explain)
G-Onerator Error
~
m_
1 11 i
i.
L' DOCKET NO:.50-414 t
i j
UNIT: Catawba-2.
i DATE: 9/15/92 NARRATIVE
SUMMARY
i-l f
i-MONTH: August 1992-l Catawba Unit 2 began the month of August operating at 100%.fu11 power.
l The unit operated at or'near 100% full power until 8/22 at 2000 when.
the unit started'a power _ decrease.
The unit held at 90% power from 2315 j
to 8/23 at 1020-for the main turbine control valve movement-test.
During testing, control valve #3 went closed and would not reopen, the i
unit started a power decrease to repair the_ valve at 1042. -The unit
}-
held at 68% power from 1314 to 1350'for control valve #3 repa*ra and at-
~
t 67% from 1410 to 1942 for control #3 repairs.
The unit started power 4
escalation and held at 88% power from 2330 to 8/24 at 0.100 for the-control valve movement test and reached 100% full power ac 0507-.
The j
unit operated at 100% full power for the remainder of the month.
I i
s i-I-
4 1-i bc i
4-i' i
n.
]
-Prepared by:
N. C. Simmons
(
' Telephone:
704-382-5263 j
.i 1
)
i 1
i
)
3
4 MONTHLY REFUELING INFORMATION REOUES_I i
l 1.
Facility name: Catpwba.
linit 2 l
2.
Scheduled next refueling shutdown: February 1993 L
3.
Scheduled restart following-refueling: April 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j.
ANY T.S.
CHANGE OR. LICENSE AMENDMENT.
THEREFORE, ' QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter.- require a i
technical specification change or other license amendment?
i l
If yes, what will these be?
}
If no, has reload design and core configuration been reviewed by i
Safety Review Committee regarding unreviewed safety questions?
I 5.
Scheduled date(s) for submitting proposed licensing action and j
supporting information.
h 6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis methods, j
significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 280 f.
8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
t 9.
Projected date of last refueling which can:be accommodated - by present licensed capacity: Sentember 2011 s
DUKE POWER COMPANY DATE:
September 15. 1992 Name of
Contact:
R.
A.
Williams Phone:
704-38i-5346 l
l.
l' i
i i
?
---