Monthly Operating Rept for Aug 1992 for Callaway Plant, Unit 1
ML20105B387
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/1992
From: Blosser J, Knaup J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2697, NUDOCS 9209180339
Download: ML20105B387 (6)


Text

_ _ _ _ _ _ _ _ _ _

, eBp i

e UNION E.ECTRIC COMPANY soptember 9, 1992 Cotiaucy Nant Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-269 7

Dear Sir:

DOC 1.ET nut 4BER 50 483 CAIAAWAY PIANT UNIT 1 FACILITY OPERATING LICENSE NPF-:0 M0'4THLY OPERATING REPORT AUGUST 1992 The enclosed Monthly Operating Report for August, 1992 is submitt )

pursuant to section 6.9.1.8 ot' the Callaway Unit 1 Technical Specifications, J.G vY J', D. Blosser r

' Manager, Callaway Plant JDB/ dei /J/el/ AM K/ crc Enclosure cc:

Distribution attached

?l I

6

<O F 9209180339 920031

/_ [g(f PDR :ADOCK 05000483 I

R pga f

~

Malung Adctress, PO. Box tWU Futton, MO 65251

1 m..

1 cc distribution-for ULNRC-2697-with enclosures e

Mr. Richard Hague, Chief i;-

Proj ec-Section 1A l'

U.: S. Nuclear Regulatory Commis'sion Region III 799 Roosevelt Road Clen Ellyn, IL.- 60137

~

Mr. L. B. Vnarton (2 copias)

L (ffice C. Nuclear Reactor Eegulation-U. S. Nuclear Rt latory Commission

--I White Flint,. North, Mail Stop 13E21 11555' Rocbrille, MD 20852 NRC Resident Inspector-.

p-'

/ Manager,' Electric Department

- Missouri Public Service Commission P.O. Box-360 l.

Jefferson City, MO -65102 1:

l p:-

i' l'

l' it i_

r 1

R

$n.

1 l

. j t

l f

T E

  • v*T W

y w

.e y

m.c-

-wJ-r-e.r'w

'+"ed v-

= -.

,. -. ~. -.... -

^

r f-~

+

-i~

n-

^

DOCKET NO.

50-483

~

UNIT NAME CALIAWAY UNIT 1 DATE-09-09-92 COMPLETED BY:

J.

W.,

Knaup TELEPHONE _

314/676-8485 PART a OPERATIONS

SUMMARY

The plant operated 'at approximately 100% power for the entire month with the_following exception.

~

30n_8/7/92, load was reduced to approximately 70% for repair of low

. pressure feedwater heater tubes. Full power operation resumed'on 8/9/92.

PART B - PORV AND SAFETY VALVE StliMARY None.

z, Page 1 of_4

! -t i

I:.

r/ >

p x..

L..;

PART C AVERAGE DAILY UNIT POWER LEVEL y..

DOCKET NO 50 483 UNIT Callaway Unit 1 DATE 09-09-92

. COMPLETED BY J. W. Knaup-TELEPHONE 314/676-8485 MONTil: AUGUST 1992

-AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL

~ r DAY-(MWo Net)

DAX (MWo) l' 1148 17 1145 2

1143 18 1192 3-1142-19

'142 4

1147 20 1146 5

1145 21 1144-1143-22 1139 17

-1058 23 1134

.8.

715 24 1133 9-1017 25 1129

j.-

10-

'112?

26

_jl37

- 11~-

-1140 27 1149 12 1144' 28 1153 T13 1145 29 1143'

14' 1149-

-30 1149

~ 15 -~

1152-31 1153 16 --

1150' 5

Page 2 of 4

~

.,n.

-~, _~

o i

Parc D OPERATING DATA _ REPORT.

T :s u; NO 50 483-

"C

  • NAME CALLAWAY UNIT 1~

DATE 09-09-92 COMPLETED BY J. W. Knaup TELEPHONE 314/676-8485

' OPERATING STATUS (YO CUM) 1.

REPORTING PERIOD: AUGUST 1992 GROSS HOURS IN ' REPORTING PERIOD: 744 5855 67,476.5 2.

CURRENTLY ALTH;RIZE0 POWER LEVEL (Wt): 3565 KAX. OEPEND CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (We-Net): 1171 3,. POVER LEVEL TO WHICH RESTRICTED (IF ANY)LWe-Net):

4.

REASON 3FORRESTRICTION(IFANY):

THJS MONTH YR TO DATF CUMULATIVE 5.

NUMBER OF HOURS REAliOR WAS CRITICAL....

744.0 4379.7 58.468.2 6.

REACTOR RESERVE $ HUT 00VN HOUR $.........

0 0

0 7.

HOURS GENERATOR ON l.INE.

744.0 4306.5 57,155.9 8.

UNIT RE5fRVE SHUTOOWN HCURS...

0-0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH)...

2,598.660 14,626,451 190,889,314

10. GROSS ELECTRICAL ENERGY GENERATED (WH)..

875,433 5

.,471 65,070.635

11. NET ELECTRICAL ENERGY GENERATED (Wh)..

835,175 4,761.340 61,840,888 L

12.. REACTOR SERVICE FACTOR.

100.0 74.8 86.6

13. REACTOR AVAILABILITY FACTOR.-

100.0 74.8 86.6 14,. UNIT SERVICE FACTOR,...

100.0 73.6 84.7-

15. _ UNIT AVAILABILITY FACTOR..

100.0 73.6 84.7

16. UNIT CAPACITY FACTOR (Using MDC)..

99.8 72.3 81.5

17. UNIT CAPACITY FACTOR (Using Design MWe).

95.9 69.4 78.3

18. UNIT FORCED OUTAGE RATE.

0.0 ~

2.6 2.9

'19.

SHUT 00VN$ SCHEDULED DVER NEXI 6 L;0NTHS (TYPE

(%T'*, AND DURATION OF EA;H):

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIETED DATE OF STARTUP:

l Page 3 of 4

i *.'

'PART E UNIT SHUTDOWNS AND POWER REDUCTIONS ~

DOCKET NO.-

50-483 UNIT MAME CALLAWAY UNIT 1 DATE 09-09-92 COMPLETED BY-J. W. Knaup TELEPHONE 314/676-8485 REPORT MONTH: AUGUST 1992 METHOD OF TYPE SHUTTING DOWN F: FORCEO

. DURATION THE REACTOR OR No.

DATE 5: SCHEDULED.

(HOURS)

REASON REDUCIhG F0WER CORRECTIVE ACTIONS /CO*NENTS

.10 08/07/92 S

40.1

.B

.I Oc 8/7/92, load was reduced to approximately 70% for repair of low pressu e feedwater heater tubes. Full power cperation.

resumed on 8/9/92.

SUMMARY

. REASON

'4ETHOD EQUIPMENT FAILURE (EXPLAIN)

I: MAMUAL B: MAINT. OR TEST 2: MANUAL SCRAM C. REFUELING 3:. AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: JTHER (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATICN F: ADMINISTRATIVE.

G: OPERATIONAL ERROR (EAFLAIN)

H: OTHER (EXPLAIN)

..