ML20105B387
| ML20105B387 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/31/1992 |
| From: | Blosser J, Knaup J UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-2697, NUDOCS 9209180339 | |
| Download: ML20105B387 (6) | |
Text
_ _ _ _ _ _ _ _ _ _
, eBp i
e UNION E.ECTRIC COMPANY soptember 9, 1992 Cotiaucy Nant Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-269 7
Dear Sir:
DOC 1.ET nut 4BER 50 483 CAIAAWAY PIANT UNIT 1 FACILITY OPERATING LICENSE NPF-:0 M0'4THLY OPERATING REPORT AUGUST 1992 The enclosed Monthly Operating Report for August, 1992 is submitt )
pursuant to section 6.9.1.8 ot' the Callaway Unit 1 Technical Specifications, J.G vY J', D. Blosser r
' Manager, Callaway Plant JDB/ dei /J/el/ AM K/ crc Enclosure cc:
Distribution attached
?l I
6
<O F 9209180339 920031
/_ [g(f PDR :ADOCK 05000483 I
R pga f
~
Malung Adctress, PO. Box tWU Futton, MO 65251
1 m..
1 cc distribution-for ULNRC-2697-with enclosures e
Mr. Richard Hague, Chief i;-
Proj ec-Section 1A l'
U.: S. Nuclear Regulatory Commis'sion Region III 799 Roosevelt Road Clen Ellyn, IL.- 60137
~
Mr. L. B. Vnarton (2 copias)
L (ffice C. Nuclear Reactor Eegulation-U. S. Nuclear Rt latory Commission
--I White Flint,. North, Mail Stop 13E21 11555' Rocbrille, MD 20852 NRC Resident Inspector-.
p-'
/ Manager,' Electric Department
- Missouri Public Service Commission P.O. Box-360 l.
Jefferson City, MO -65102 1:
l p:-
i' l'
l' it i_
r 1
R
$n.
1 l
. j t
l f
T E
- v*T W
y w
.e y
m.c-
-wJ-r-e.r'w
'+"ed v-
= -.
,. -. ~. -.... -
^
r f-~
+
-i~
- n-
^
DOCKET NO.
50-483
~
UNIT NAME CALIAWAY UNIT 1 DATE-09-09-92 COMPLETED BY:
J.
W.,
Knaup TELEPHONE _
314/676-8485 PART a OPERATIONS
SUMMARY
The plant operated 'at approximately 100% power for the entire month with the_following exception.
~
30n_8/7/92, load was reduced to approximately 70% for repair of low
. pressure feedwater heater tubes. Full power operation resumed'on 8/9/92.
PART B - PORV AND SAFETY VALVE StliMARY None.
z, Page 1 of_4
! -t i
I:.
r/ >
p x..
L..;
PART C AVERAGE DAILY UNIT POWER LEVEL y..
DOCKET NO 50 483 UNIT Callaway Unit 1 DATE 09-09-92
. COMPLETED BY J. W. Knaup-TELEPHONE 314/676-8485 MONTil: AUGUST 1992
-AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL
~ r DAY-(MWo Net)
DAX (MWo) l' 1148 17 1145 2
1143 18 1192 3-1142-19
'142 4
1147 20 1146 5
1145 21 1144-1143-22 1139 17
-1058 23 1134
.8.
715 24 1133 9-1017 25 1129
- j.-
10-
'112?
26
_jl37
- 11~-
-1140 27 1149 12 1144' 28 1153 T13 1145 29 1143'
- 14' 1149-
-30 1149
~ 15 -~
1152-31 1153 16 --
1150' 5
Page 2 of 4
~
.,n.
-~, _~
o i
Parc D OPERATING DATA _ REPORT.
T :s u; NO 50 483-
"C
- NAME CALLAWAY UNIT 1~
DATE 09-09-92 COMPLETED BY J. W. Knaup TELEPHONE 314/676-8485
' OPERATING STATUS (YO CUM) 1.
REPORTING PERIOD: AUGUST 1992 GROSS HOURS IN ' REPORTING PERIOD: 744 5855 67,476.5 2.
CURRENTLY ALTH;RIZE0 POWER LEVEL (Wt): 3565 KAX. OEPEND CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (We-Net): 1171 3,. POVER LEVEL TO WHICH RESTRICTED (IF ANY)LWe-Net):
4.
REASON 3FORRESTRICTION(IFANY):
THJS MONTH YR TO DATF CUMULATIVE 5.
NUMBER OF HOURS REAliOR WAS CRITICAL....
744.0 4379.7 58.468.2 6.
REACTOR RESERVE $ HUT 00VN HOUR $.........
0 0
0 7.
HOURS GENERATOR ON l.INE.
744.0 4306.5 57,155.9 8.
UNIT RE5fRVE SHUTOOWN HCURS...
0-0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH)...
2,598.660 14,626,451 190,889,314
- 10. GROSS ELECTRICAL ENERGY GENERATED (WH)..
875,433 5
.,471 65,070.635
- 11. NET ELECTRICAL ENERGY GENERATED (Wh)..
835,175 4,761.340 61,840,888 L
- 12.. REACTOR SERVICE FACTOR.
100.0 74.8 86.6
- 13. REACTOR AVAILABILITY FACTOR.-
100.0 74.8 86.6 14,. UNIT SERVICE FACTOR,...
100.0 73.6 84.7-
- 15. _ UNIT AVAILABILITY FACTOR..
100.0 73.6 84.7
- 16. UNIT CAPACITY FACTOR (Using MDC)..
99.8 72.3 81.5
- 17. UNIT CAPACITY FACTOR (Using Design MWe).
95.9 69.4 78.3
- 18. UNIT FORCED OUTAGE RATE.
0.0 ~
2.6 2.9
'19.
SHUT 00VN$ SCHEDULED DVER NEXI 6 L;0NTHS (TYPE
(%T'*, AND DURATION OF EA;H):
- 20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIETED DATE OF STARTUP:
l Page 3 of 4
- i *.'
'PART E UNIT SHUTDOWNS AND POWER REDUCTIONS ~
DOCKET NO.-
50-483 UNIT MAME CALLAWAY UNIT 1 DATE 09-09-92 COMPLETED BY-J. W. Knaup TELEPHONE 314/676-8485 REPORT MONTH: AUGUST 1992 METHOD OF TYPE SHUTTING DOWN F: FORCEO
. DURATION THE REACTOR OR No.
DATE 5: SCHEDULED.
(HOURS)
REASON REDUCIhG F0WER CORRECTIVE ACTIONS /CO*NENTS
.10 08/07/92 S
40.1
.B
.I Oc 8/7/92, load was reduced to approximately 70% for repair of low pressu e feedwater heater tubes. Full power cperation.
resumed on 8/9/92.
SUMMARY
. REASON
'4ETHOD EQUIPMENT FAILURE (EXPLAIN)
I: MAMUAL B: MAINT. OR TEST 2: MANUAL SCRAM C. REFUELING 3:. AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: JTHER (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATICN F: ADMINISTRATIVE.
G: OPERATIONAL ERROR (EAFLAIN)
H: OTHER (EXPLAIN)
..