Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20104A238 + (ML20104A238)
- ML20104A245 + (ML20104A245)
- ML20104A246 + (ML20104A246)
- ML20104A249 + (ML20104A249)
- ML20104A254 + (ML20104A254)
- ML20104A256 + (ML20104A256)
- 0CAN099203, Advises That Comprehensive Program Initiated to Implement Requirements of GL 89-10 Re safety-related motor-operated Valve Testing & Surveillance,Per Insp Repts 50-313/92-18 & 50-368/92-18.Program Screening Criteria Listed in Encl + (ML20104A259)
- ML20104A264 + (ML20104A264)
- ML20104A265 + (ML20104A265)
- ML20104A273 + (ML20104A273)
- ML20104A276 + (ML20104A276)
- ET-NRC-92-3742, Requests That Proprietary Ltr NSD-TAP-2092 Re Addl Technical Support for Catawba Unit 1 Steam Generator Tube Interim Plugging Criteria,Be Withheld (Ref 10CFR2.790) + (ML20104A277)
- ML20104A282 + (ML20104A282)
- ML20104A284 + (ML20104A284)
- ML20104A285 + (ML20104A285)
- ML20104A287 + (ML20104A287)
- ML20104A291 + (ML20104A291)
- HL-2364, Forwards Rev 1 to Ei Hatch Nuclear Plant - Unit 2 COLR for Operating Cycle 10. Rev Imposes MAPLHGR Penalty While Operating Above 63% Rated Thermal Power + (ML20104A292)
- ML20104A298 + (ML20104A298)
- ML20104A299 + (ML20104A299)
- ML20104A303 + (ML20104A303)
- ML20104A305 + (ML20104A305)
- ML20104A307 + (ML20104A307)
- ML20104A308 + (ML20104A308)
- ML20104A312 + (ML20104A312)
- ML20104A313 + (ML20104A313)
- 3F0185-19, Submits Certifications for Environ Qualification of Electrical Equipment,Per Generic Ltr 84-24 Request.Insp of Target Rock Valves Scheduled During Refuel V + (ML20104A314)
- ML20104A315 + (ML20104A315)
- ML20104A318 + (ML20104A318)
- ML20104A319 + (ML20104A319)
- ML20104A331 + (ML20104A331)
- ML20104A343 + (ML20104A343)
- ML20104A345 + (ML20104A345)
- ML20104A354 + (ML20104A354)
- BECO-LTR-92-106, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-293/92-14.Correctve Actions:Procedure Will Be Revised Per Generic Ltr 90-05, Guidance for Performing Temporary Non-code Repair of ASME Code Class 1,2 & 3 Piping + (ML20104A363)
- ML20104A365 + (ML20104A365)
- ML20104A367 + (ML20104A367)
- ML20104A371 + (ML20104A371)
- ML20104A383 + (ML20104A383)
- RA-19-0039, License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes + (ML20104A384)
- ML20104A387 + (ML20104A387)
- ML20104A388 + (ML20104A388)
- 05000346/LER-1979-022, Forwards LER 79-022/03L-0 + (ML20104A391)
- 05000346/LER-1979-022-03, /03L-0 on 790208:diesel Fire Pump Battery Electrolyte Level in Four Cells Was Below Top of Cell Plates.Caused by Procedural Error.Levels Restored,Pump Declared Operable & Unit Removed from Action Statement + (ML20104A398)
- ML20104A402 + (ML20104A402)
- ML20104A404 + (ML20104A404)
- ML20104A410 + (ML20104A410)
- ML20104A426 + (ML20104A426)
- ML20104A434 + (ML20104A434)
- ML20104A435 + (ML20104A435)
- ML20104A439 + (ML20104A439)