ML20104A345

From kanterella
Jump to navigation Jump to search
Forwards Cycle IV Irradiated Fuel Insp Following Cycle IV Operation Nov-Dec 1978
ML20104A345
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/01/1979
From: Short T
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20104A348 List:
References
NUDOCS 7903130358
Download: ML20104A345 (1)


Text

.d f

(

(

f,......,$.

g'D

.p'j u

J.-

Omaha Public Power District N'

1623 HARNEY a O M AN A. NESMASMA 68102 e TELEPHONE 536 4000 AREA CODE 402 March 1, 1979 Director of IE U. S. Nuclear Regulatory Co= mission Washington, D. C.20555

Reference:

Docket No. 50-285 Gentlemen:

In accordance with Technical Specification 5.a.1c of the Fort i

Calhoun Station Technical Specifications, please find enclosed ten (10) copies of a report entitled " Cycle IV Irradiated Fuel Inspection Following Cycle IV Operation, November-December 1978". The report

~

provides the results of the fuel inspection performed during the 1978 refueling outage.

~

Sincerely. -

}

f(b p T. E. [Short Assist; ant General Manager r

TES/KJM/BJH: jam Enclosures-

.h:. '

NRC Regional Office - (2) cc:

U. S.- Nuclear Regulatory Commission Arlington, Texas.76011 Director of MPA - (2)

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 LeBoeuf, La=b, Iaiby Ts MacRae 1757 "N" Street, N. W.

Washingten, D. C.

20036 T

b\\

7 y

7903130352 9

.