ML20104A291
| ML20104A291 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/28/1985 |
| From: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| To: | John Miller Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8502010202 | |
| Download: ML20104A291 (2) | |
Text
p-J-
BALTI MORE GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ARTHust E LUNDVALL. JR.
vice PREsiDEta January 28,1985 s=
' U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation l
. Washington, D. C. 20555 ATTENTION: Mr. James R. Miller, Chief Operating Reactors Branch #3, Division of Licensing
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 318 Inservice Inspection Program; Pump and Valve Testing
REFERENCE:
(a)
Letter to Mr. R. A. Clark, from Mr. A. E. Lundvall, Jr., dated July 22,1982 (b)
Letter to Mr. J. R. Miller, from Mr. A. E. Lundvall, Jr., dated March 6,1984 Gentlemen:
LReferences (a) and (b) requested extension of the. Calvert Cliffs Unit 1 inspection interval from May 8,1985 to April 1,1987. It was BG&E's intent that the interval extension ~ would apply to all phases of the ASME Code Section XIInservice Inspection Program, including both Inservice Inspection (ISI) and Inservice Testing-(IST) of ~
pumps and valves.
During subsequent discussions with Mr. D. H. Jaffe, NRC Project-Manager, he indicated that a separate request would be required for extension of the interval for Inservice Inspection of pumps and valves. We are, therefore, herein requesting extension of the current Unit 1 IST program interval to April 1,1987. 'On April 1, 1987, all phases of the Inservice Inspection Program, both ISI and IST, for both Units 1 and 2, would then be updated to the approved Code as specified by 10 CFR 50.55a.
- As stated in references (a) and (b), the purpose for requesting an extension of the ISI program interval was to reduce procedure duplication and ' confusion of Code requirements between Calvert Cliffs Units-1 and 2 by updating both to the same edition and addenda' of ASME Code Section XI. Similarly, by updating both Units 1 -
and 2 IST programs to the same edition and addenda of the Code it will serve to.
eliminate confusion and procedure duplication for BG&E, the Authorized Nuclear Inspection Agency, and the 'USNRC. The Unit 1 testing of pumps and valves will
- continue to adhere to the current Code requirements and exis+ing exemptions until
' April 1,1987.
~
'esoaotozoas"ootge gg48 y
7^"
P m
=... -
r:
i U. S. Nuclear Regulatory Commission
=
January 28,1985 i
Page 2 We have determined that this request constitutes an amendment for Calvert Cliffs
. Unit No.1, pusuant to 10 CFR 170.22. Accordingly, Baltimore Gas & Electric Company Check No.B396448 in the amount of $150.00 is remitted herewith.
Should you have further questions regarding this matter, please do not hesitate to contact us.
Very truly yours,
['
c n
i AEL/JPL/ph Enclosure (Check) cc:
D. A. Brune, Esquire G. F. Trowbridge, Esquire
- D. H. Jaffe, NRC T. Foley, NRC
= -.. -.
D
- g
- ,
E