ML20104A284

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept RDC(120(84)) Re Topaz Class 1E Inverters,Supplied by Ge.Final Rept Withdrawn Due to Delay in Evaluating Addl Info.Next Rept Will Be Issued by 840208
ML20104A284
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/11/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC(120(84)), NUDOCS 8502010196
Download: ML20104A284 (1)


Text

.....

T il E C L E V E L l l! B c L E C T R I C i L L U M i il llT i U G C O M P A ! Y P O box $000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG - 55 PUBLICSQUARE i

Serving The Best Location in the Nation i

January 11, 1985 rnicaIrr rscurisa MURRAY R. EDELMAN

, 3.,g.

VICE PitESIDENT

L

^

NUCLEAR

/

[][-

i Mr. James G. Keppler "h9 Regional Administrator, Region III Office of Inspection and Enforcement o#4 31 U.S. Nuclear Regulatory Commission M

799 Roosevelt Road Mrh Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Topaz Class 1E Inverters RDC [120(84)]

Dear Mr. Keppler:

The purpose of this letter is to withdraw our final report issued November 28, 1984, concerning Class 1E inverters manufactured by Topaz and utilized in various control panels supplied to Perry by General Electric. Following the issuance of the original report, additional information concerning the Tap,-

inverters became available. Implementation of the corrective action ident Mied in our November report has been delayed pending evaluation of the additioual information. The next report concerning the Topaz inverters will be issued by February 8, 1984 Please call if there are any additional questions.

Sincerely, urray R. Edelman Vice President Nuclear Group MRE:pab cc:

Mr. J. A. Grobe U.S. Nuclear Regulatory Commission USNRC, Site Office c/o Document Management Branch Washington, D.C.

20555 Mr. D. E. Keating USNRC, Site Office Records Center, SEE-IN Institute of Nuclear Power Operations Director 1100 circle 75 Parkway, Suite 1500 Office of Inspection and Enforcement Atlanta, Georgia 30339 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 0

8502010196 850111 JAN 141985 PDR ADOCK 05000440 S

PDR

_ _ _ _ _ _ _