ML20104A435
| ML20104A435 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/27/1984 |
| From: | Morgan R CAROLINA POWER & LIGHT CO. |
| To: | Gibson A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| RTR-NUREG-1021 RSEP-84-1260, NUDOCS 8502010304 | |
| Download: ML20104A435 (2) | |
Text
wd..
~ ~.. _
,yNR Carolina}o#ed 6%fompany
~
- ~, - - -
R0bNOEIONCLgPRf{CTDEPARTMENT POST OFaIDE EOX 790 HARTSVILLE, SOUTH CAROLINA 29550 DEC 271984 Robinson File No:
13510 Serial:
RSEP/84-1260 Mr. A. Gibson Chief, Operations Branch U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NC. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 RO/SRO EXAM - DECEMBER 17 - 21, 1984
Dear Mr. Gibson:
A Reactor Operator, Senior Reactor Operator (RO/SRO) examination was administered by Mr. Ed Cook during the week of December 17 The following suggestions and comments on this examination are provided per NUREG-1021.
1.
It is suggested that the point value of the exam be reviewed for consistency.
Example:
1 point for AOP immediate actions 1 point for knowing a number (RCS H2 concentration) 2.
The examination included questions on actions to take per the EOP I
network. The new E0P network was designed so the Operator would not have to memorize these actions. It was intended to remove the burden of memorization off the Operator. Therefore, questions requiring the memorization of actions in the E0Ps should not be included in the exam.
l 3
SRO Exam, Section 6, Question 2(b). Resin damage does not occur until the temperature increases beyond 145 F which is the setpoint for TCV-143 Please consider this point when grading this question.
4.
The length of time temporary procedures and special procedures are effective is not included in our RO training program and does not appear to be in 10CFR55. This has not been considered as required RO knowledge.
b 8502010304 841227 1
PDR ADOCK 05000261
, F V
PDR 1
pgp
I'
- i-...
.S'g*-
. 'Littir to Mr.lA. Gibson
~ '
S riml:L RSEP/84-1260 cc
.Page 2
' 5.-
When grading the exams, we suggest that you accept answers that are s
.true'even-if not listed on the answer key.
Example: There may be'many symptoms for primary to secondary leak other'than those listed in the answer key.
~
Should you have any questions, please contact Mr. Steve Allen at 803-303-4524 Extension 341.-
r Very truly yours, N
R. E. Md gan General Manager H. B. Robinson S.E. Plant LJCS/wp.
s
Attachment:
'oc::TG..P. Beatty, Jr.-
C. A. Bethea.
F. L. Lowery.
~
D.~ R.' Nelson D. C. Stadler A. C. Tollison.
S.-R. Zimmerman i
9-
~g 1
"4 4
w - - - - -