Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101B753 + (ML20101B753)
- ML20101B755 + (ML20101B755)
- 05000331/LER-1984-041, :on 841111,reactor Water Conductivity Increased Above Tech Spec Limit.Caused by Resin or Air Intrusion. Operating Procedures Improved to Minimize Sys Disturbances + (ML20101B757)
- ML20101B759 + (ML20101B759)
- BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station + (ML20101B765)
- ML20101B766 + (ML20101B766)
- ML20101B768 + (ML20101B768)
- ML20101B770 + (ML20101B770)
- ML20101B777 + (ML20101B777)
- ML20101B781 + (ML20101B781)
- ML20101B784 + (ML20101B784)
- ML20101B787 + (ML20101B787)
- ML20101B789 + (ML20101B789)
- 05000370/LER-1991-012, :on 911108,automatic Reactor Trip Initiated Due to Control Rod Failure.Caused by Equipment Failure. Iae Personnel Downloaded Traces of Electronic Circuit Performance + (ML20101B790)
- ML20101B791 + (ML20101B791)
- ML20101B795 + (ML20101B795)
- U-601991, Ro:On 920522,discovered That External Vessel Surface Was Hot & Chart Recorder Indicated Absorber Bed Temp Greater than 300F.Fire Brigade Was Activated.Sampling Process Established to Monitor Purge Exhaust Composition + (ML20101B798)
- ML20101B801 + (ML20101B801)
- ML20101B806 + (ML20101B806)
- JAFP-96-0110, Forwards Corrected Page of GL 95-07 180-day Response + (ML20101B809)
- ML20101B817 + (ML20101B817)
- ML20101B818 + (ML20101B818)
- ML20101B827 + (ML20101B827)
- ML20101B828 + (ML20101B828)
- ML20101B830 + (ML20101B830)
- ML20101B832 + (ML20101B832)
- PLA-4431, Responds to NRC Re Violations Noted in NOV & Proposed Imposition of Civil Penalty in Amount of $100,000. C/As:Independent Assessment of Security & Nuclear Safety Concerns Program Completed + (ML20101B841)
- ML20101B850 + (ML20101B850)
- ML20101B854 + (ML20101B854)
- ML20101B855 + (ML20101B855)
- ML20101B859 + (ML20101B859)
- ML20101B863 + (ML20101B863)
- ML20101B868 + (ML20101B868)
- ML20101B873 + (ML20101B873)
- ML20101B874 + (ML20101B874)
- ML20101B900 + (ML20101B900)
- ML20101B906 + (ML20101B906)
- ML20101B912 + (ML20101B912)
- ML20101B913 + (ML20101B913)
- 05000354/LER-1995-037, Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00 + (ML20101B914)
- ML20101B915 + (ML20101B915)
- 1CAN039602, Forwards Rev 1 to 94R-1009-03,pages 13 & 14 of 20, ANO-1 Cycle 13 Colr + (ML20101B935)
- ML20101B940 + (ML20101B940)
- ML20101B947 + (ML20101B947)
- IR 05000338/1992012 + (ML20101B951)
- ML20101B957 + (ML20101B957)
- ML20101B974 + (ML20101B974)
- ML20101B985 + (ML20101B985)
- ML20101B987 + (ML20101B987)
- ML20101B993 + (ML20101B993)
- 05000280/LER-1984-023, :on 841113,spurious Safety Injection Received While Technicians Performing Calibr Procedure CAL-63.Caused by Electrical Transient in Instrument Loops + (ML20101B995)