Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000374/LER-1984-060, :on 840828,during Functional Test of Reactor Protection Sys Relays K101A & K101D,time Delay Found to Be in Excess of 10 S.Caused by Testing Method & Relay Inactivity.Relay Returned to Proper Time Delay + (ML20098G889)
- ML20098G890 + (ML20098G890)
- ML20098G891 + (ML20098G891)
- 05000374/LER-1984-056, :on 840827,inboard Isolation Valve 2G33-F001 Closed & Reactor Water Cleanup Pumps Tripped.Caused by Spurious High Differential Temp Reading from Riley Leak Detection Isolation Sys + (ML20098G893)
- 05000413/LER-1984-008-02, :840822,various ESF Valves Repositioned to Safety Positions.Caused by Inadvertent Actuation of Relay K603 of Train a Solid State Protection Sys + (ML20098G912)
- ML20098G918 + (ML20098G918)
- ML20098G937 + (ML20098G937)
- ML20098G965 + (ML20098G965)
- PLA-2320, Responds to NRC Re Violations Noted in Insp Repts 50-387/84-31 & 50-388/84-37.Corrective Actions:Bracing Failure Incident Included in Radwaste Worker Training to Enhance Importance of Bracing in Radwaste Shipments + (ML20098G973)
- FVY-84-118, Forwards Procedure AP 0154, Post-Trip Review, Inadvertently Omitted from 840925 Submittal + (ML20098G987)
- ML20098G992 + (ML20098G992)
- ML20098G994 + (ML20098G994)
- PY-CEI-NRR-0144, Responds to 840319 Request for Addl Info on NRC Question 210.15 Re Use of Stiff Piping Clamps in ASME Piping Sys. Listing of Stiff Pipe Clamp Applications & Evaluation of Effects Encl + (ML20098G998)
- W3P84-2840, Forwards Executed DOE Contract Re Disposal of Spent Fuel &/Or High Level Waste + (ML20098H004)
- ML20098H009 + (ML20098H009)
- ML20098H011 + (ML20098H011)
- LD-84-055, Advises That Requested Addl Info Re SER Confirmatory Issue 4 Listed in Suppl 2 to NUREG-0852 Concerning Inadequate Core Cooling Instrumentation Will Be Submitted by Dec 1984 + (ML20098H012)
- ML20098H013 + (ML20098H013)
- PY-CEI-NRR-0133, Forwards Info Clarifying SER Outstanding Issue 4 Re Environ Qualification Program at Facility.Info Relates to Topics Reviewed During Jan Audit & 840507 Response to NRC on Rev 1 to GE Rept NEDE-24326 + (ML20098H015)
- ML20098H016 + (ML20098H016)
- NLS8400021, Forwards Response to Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability, Per 10CFR50.54(f) + (ML20098H020)
- ML20098H021 + (ML20098H021)
- ML20098H023 + (ML20098H023)
- ML20098H026 + (ML20098H026)
- ML20098H027 + (ML20098H027)
- ML20098H031 + (ML20098H031)
- ML20098H034 + (ML20098H034)
- ML20098H037 + (ML20098H037)
- ML20098H039 + (ML20098H039)
- ML20098H040 + (ML20098H040)
- ML20098H041 + (ML20098H041)
- ML20098H043 + (ML20098H043)
- ML20098H045 + (ML20098H045)
- W3P84-2724, Forwards Detailed Control Room Design Review Program Plan, in Response to Suppl 1 to NUREG-0737.Program Plan Discusses Work Completed to Date.W/O Encl + (ML20098H046)
- ML20098H047 + (ML20098H047)
- ML20098H048 + (ML20098H048)
- ML20098H055 + (ML20098H055)
- ML20098H069 + (ML20098H069)
- ML20098H073 + (ML20098H073)
- ML20098H080 + (ML20098H080)
- ML20098H085 + (ML20098H085)
- ML20098H104 + (ML20098H104)
- ML20098H116 + (ML20098H116)
- ML20098H121 + (ML20098H121)
- ML20098H122 + (ML20098H122)
- ML20098H123 + (ML20098H123)
- ML20098H124 + (ML20098H124)
- ML20098H125 + (ML20098H125)
- ML20098H129 + (ML20098H129)
- NRC-84-0113, Responds to 840612 Request for Addl Info on Steam Generator Tube Rupture (Sgtr).In Order to Coordinate Activities W/Other Industry SGTR Event Evaluation Efforts,Response Will Be Submitted by 841130 + (ML20098H164)
- ML20098H172 + (ML20098H172)