Responds to Violations Noted in Insp Rept 50-528/84-15. Corrective Actions:Insp of Thread Engagement of 250 Q Valves Completed & Listed Procedure Change Notices Issued to Incorporate Revised Thread Engagement Criteria
ML20098H023
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/25/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30641-EEVB, NUDOCS 8410090263
Download: ML20098H023 (2)


Text

-. _ _. -

~

r Arizona Public Service Company September 25, 1984 ANPP-30641-EEVBJr/TJB U.S. Vuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T.W. Bishop Division of Reactor Safety and Projects

Subject:

NRC Inspection During the Period of April 9-20, 1984 Violation 50-528/84-15-12 File: 84-019-026; D.4.33.2

Reference:

(1) Letter f rom E.E. Van Brunt to T.W. Bishop, dated July 10, 1984 One of the action items identified by the referenced letter as part of the subject Notice of Violation was to check the thread engagement of two hundred fif ty (250)

"Q" valves supplied by various vendors.

This inspection was not completed prior to the commitment date because the specifications were further revised to more definitively state the requirements for thread engagement.

(Refer to FCR 82, 404-P to 13-PH-204, FCR 82,405-P to 13-FM-205, and FCR 82,402-M to 13-MM-510 for the revised criteria).

This action item was com-pleted prior to August 27, 1984.

Additionally, because of the revisions to the specifications, the following action items were identified:

1) Sessions with the previously selected BPC Field Eng maers and Quality Control Engineers were conducted to ensure that the revised definition of thread engagement conforms to the past practices as discussed in the initial sessions. This action was completed by August 24, 1984.
2) An additional BPC Quality Talk session will be initiated to explain the revised thread engagement criteria.

The session is scheduled in l

September, 1984.

3) The following Procedure Change Notices have been issued to incorpora[q the revised thread engagement criteria:
3 n

PCN 15 to WPP/QCI 151.0 9

cf "k PCN 3 to WPP/QCI 156.0 5

0 PCN 104 to WPP/QCI 201.0 2

C 3

PCN 152 to WPP/QCI 201.1 T

PCN 169 to WPP/QCI 202.0 0

PCN 24 to WPP/QCI 207.0 PCN 20 to WPP/QCI 350.0 8410090263 840925 PDR ADOCK 05000528 G

pop 9W l0

m:

' yI :

F

,t=

s.

- Mr. T.W. ~ Bishop

!ANPP-30641 Page Two k-L JIf - ' there - are any-further questions, please contact Todd Bloom at (602) 943-7200, extension 6159.

'Very truly yours,

\\

m-RCL.

%t E. E. : Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVBJr/TJB/ dim cc::See Page Three.

\\

/