Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096C222 + (ML20096C222)
- ML20096C223 + (ML20096C223)
- ML20096C225 + (ML20096C225)
- ML20096C231 + (ML20096C231)
- ML20096C232 + (ML20096C232)
- ML20096C234 + (ML20096C234)
- ML20096C235 + (ML20096C235)
- ML20096C239 + (ML20096C239)
- ML20096C240 + (ML20096C240)
- ML20096C242 + (ML20096C242)
- ML20096C243 + (ML20096C243)
- 05000334/LER-1984-009, :on 840706,Smoke Detection Instrumentation Test Ost 1.33.16 Found Only Partially Completed,Since Containment Smoke Detectors Not Tested.Caused by Inadequate Procedure Review.Administrative Procedures Revised + (ML20096C247)
- ML20096C248 + (ML20096C248)
- ML20096C250 + (ML20096C250)
- 05000293/LER-1992-005, :on 920403,actuation of CSCS Logic Circuitry Occurred While Shut Down.Caused by Procedure Deficiency. Procedure Tp 92-020,Rev 0 Retired & Replaced by Procedure Tp 92-022,Rev 0 + (ML20096C253)
- 05000296/LER-1984-008-03, :on 840727,during Core Spray Logic Functional Test Surveillance Instruction,All Eight Diesel Generators Started.Caused by Improper Interpretation & Use of Procedure Instructions.Generators Reset to Standby + (ML20096C254)
- ML20096C255 + (ML20096C255)
- ML20096C256 + (ML20096C256)
- 05000364/LER-1984-007-01, :on 840801,continuous Fire Watch Not Maintained.Caused by Personnel Error.Fire Watch Immediately Posted.Personnel Counseled, + (ML20096C260)
- 05000271/LER-1984-016, :on 840728,during Shutdown for Maint,Reactor Scrammed When Recirculation Motor Generator a Started.Caused by Voltage Dip on 480-volt Bus Tripping Alternate Supply Breaker + (ML20096C261)
- ML20096C263 + (ML20096C263)
- RBG-18724, Interim Deficiency Rept DR-230 Re Air Start Valves in Standby Diesel Generator Supplied by Tdi.Interim or Final Status Rept Will Be Provided by 841030 + (ML20096C266)
- ML20096C267 + (ML20096C267)
- 05000305/LER-1984-015, :on 840728,refueling Water Storage Tank Level Discovered 1-1/2% Below Min,Contrary to Tech Specs.Caused by Valve Misalignment.Tank Filled & Plant Returned to Full Power.Incident Discussed W/Operating Personnel + (ML20096C268)
- ML20096C269 + (ML20096C269)
- ML20096C270 + (ML20096C270)
- BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station + (ML20096C273)
- NRC-96-0011, Monthly Operating Rept for Dec 1995 for Fermi 2, Per Reg Guide 1.16 + (ML20096C274)
- ML20096C276 + (ML20096C276)
- 0CAN019601, Forwards Rev 35 to Industrial Security Plan.Encl Withheld + (ML20096C277)
- ML20096C278 + (ML20096C278)
- ML20096C281 + (ML20096C281)
- ML20096C283 + (ML20096C283)
- ML20096C284 + (ML20096C284)
- RBG-18727, Interim Deficiency Rept DR-231 Re Cylinder Liners for Standby Diesel Generators Supplied by Tdi.Interim or Final Status Rept Will Be Provided by 841108 + (ML20096C286)
- ML20096C287 + (ML20096C287)
- ML20096C288 + (ML20096C288)
- ML20096C289 + (ML20096C289)
- ML20096C292 + (ML20096C292)
- 05000259/LER-1984-031-01, :on 840727,RHR Svc Water Pump D2 Not Demonstrated Operable Immediately When Pump D1 Removed from Svc.Caused by Personnel Error.Equipment Proven Operable. Associated Personnel Reinstructed + (ML20096C294)
- 3F0492-14, Annual Radiological Environ Operating Rept for 1991 + (ML20096C298)
- HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant + (ML20096C300)
- ML20096C303 + (ML20096C303)
- ML20096C304 + (ML20096C304)
- ML20096C305 + (ML20096C305)
- ML20096C309 + (ML20096C309)
- ML20096C310 + (ML20096C310)
- RBG-18721, Interim Deficiency Rept DR-191 Re Buchanan Terminal Blocks Supplied by Gould Brown-Boveri.Next Rept Will Be Submitted by 840914 + (ML20096C318)
- ML20096C321 + (ML20096C321)
- ML20096C333 + (ML20096C333)
- TXX-4288, Submits Info Re Emergency Planning Zone to Facilitate NRC Review of Emergency Planning.Diagram of Outdoor Warning Sys Siren Locations Encl + (ML20096C335)