4 j Mailing Address Alabsma Power Comptny -
' 600 North 18th Street
. Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 7834090
- R. P. Mcdonald :
Senior Vice President ~
Flintridge Bu!! ding Alabama Power Au' gust 30, 1984
. Docket Nos. 50-348 50-364' Director,' Nuclear Reactor Regulation U. S. -Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear P13nt - Units 1 and 2 Licensing Items Requiring NRC Approval Gentlemen:
- Attached for your infomation is an updated status of 1984
~ 1icensing items identified in Alabama Power Company's letter dated August-1, 1984.
The fomat of the attachment is tabulated chronologically by -
Alabama Power Company's requested NRC approval date. Alabama Power Company is ready to discuss a modification of this licensing status which would address all licensing issues.
If-you have any questions, please advise.
Yours. truly R. P. Mcdonald RPM /CJS:ddb-D16.
Attachment cc:- Mr. L. 8. Long Mr. J.' P. O'Reilly Mr. E. A. Reeves Mr. W. H..Bradford 8
P 00
'b
ATTACIMENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTilAL REQUESTED ACTUAL APCo APCo NRC NRC NRC StBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE i
REMARKS 1.
Emergency 10-25 01-06-84 COMPLETE Preparedness Program Audit Once Per 12 Months, FNP-1 and 2 2.
Administrative 04-06-83 01-09-84 COMPLETE Change to Footnote to T.S. Tabl e 3.3-3, FNP-1 and 2
- 3. _ Administrative 12-10-82 01-10-84 COMPLETE Change to T.S.
Table 3.7-4a, FNP-2 4.
Change for 10-08-82 01-27-84 COMPLETE Turbine Valve Testing, FNP-1 and 2 5.
Correct Fire 08-26-83 02-09-84 COMPLETE Protection Technical Specifications, FNP-1 and 2 6.
Administrative 05-27-84 02-29-84 COMPLETE Change to Table 3.7-4a, FNP-1 7.
Correct Snubber 05-27-83 02-29-84 COMPLETE Listing, FNP-1 (FNP-1)
(FNP-1) and 2 (T.S.
Table 3.7-4) 12-08-83 Deleted by (FNP-2)
APCo letter dated 07-06-84.
8.
10CFR50.49 02-22-84 04-16-84 COMPLETE Environmental Qualification Schedule Extension Submittal, FNP-1
~
ATTACMENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL r
PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC StBMITTAL SUBMITTAL APPROVAL-APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS 9.
License Condi-11-24-82 05-17-84 COMPLETE tion 2.C(17) 06-29-83 Containment 03-23-84 Mini-Purge, FNP-2 (T.S.
3.6.1.7) 10a. Mechanical 11-24-82 05-17-84 COMPLETE Snubber Listing, FNP-2 (T.S. Tabl e 3.7-48) 10b. Containment 11-24-82 05-17-84 COMPLETE Penetration Overcurrent Protection, FNP-2 (T.S.
Table 3.8-1)
- 11. Movable Control 03-04-83 06-06-84 COMPLETE Rod Action 06-03-83 Statement, 07-28-83 FNP-1 and 2 10-10-83 (T.S. 3/4.1.3) 02-17-84 05-03-84 12a. River Water 12-30-82 06-07-84 COMPLETE System 06-20-83 Deletion, FNP-1 03-02-84 and 2 (T.S.
03-27-84 3/4.7.5 and 3/4.7.6) 12b. Diesel 08-03-82 06-07-84 COMPLETE Generator 12-30-82 Overload Test, 06-03-83 FNP-1 and 2 01-31-84 (T.S.
03-02-84 4.8.1.1.2.c.5) 03-27-84
- 13. Charcoal Filter 03-04-83 06-22-84 COMPLETE Surveillance, 03-01-84 FNP-1 and 2 (T.S. 4.7.7, 4.7.8 and 4.9.14)
L-
ATTACMENT PAGE 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SIBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS
- 14. Respirator 01-13-84 02-12-84 53479 Iodine Filter 02-10-84 09-09-84 53469 Exemption 02-13-84 09-14-84 Request, FNP-1 03-05-84 and 2 05-08-84
- 15. Reactor Head 12-12-83 07-01-84 54531 Vent and Other 08-30-84 54532 0737 Items, 09-28-84 G.L. 83-37, FNP-1 and 2 (Proposed T.S.
3/4.4.12 and existing T.S.
Table 3.3-6, 3.3-11 and 3/4.6.4)
- 16. Meteorological 03-02-84 07-08-84 54450 Tower 08-31-84 54451 Instrument 09-28-84 Surveillance, FNP-1 and 2 (T.S. Tabl es 3.3-8 and 4.3-5) 17a. Change Monthly 03-01-84 09-01-84 54452 Channel 09-28-84 54453 Calibration of Excore Neutron Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Table 4.3-1) 17b. Correct 03-01-84 09-01-84 54452 Facility 09-28-84 54453 Organization Chart, FNP-1 and 2 (T.S.
Figure 6.2-2)
ATTACIMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SU8MITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS 17c. Correct Valve 03-01-84 09-01-84 54452 Numbers Listed 09-28-84 54453 in T.S., FNP-1 and 2 (T.S.
Table 3.6-1) 18.
Increase Fuel 03-30-84 10-01-84 54672 Enrichment 05-29-84 54673 Design Limit
'for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.
5.3.1 and 5.6.1.2) 05-03-83 11-03-83 51629
- 19. Safety Related Battery 06-29-83 05-01-84 51631 Surveillance, 07-29-83 06-01-84 FNP-1 and 2 08-26-83 08-15-84 (T. S.3 /4.8. 2. 3, 09-23-83 09-06-84 3/4.8.2.4 and 01-27-84 10-06-84 3/4.8.2.5) 09-27-84 48714 04-10-84 10-06-84
- 20. RCS Pressure Isolation Valve 48715
-Surveillance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3)
NEW ITEM
- 21. Administrative 08-17-84 10-10-84 Change to allow AFW Surveillance
.to be performed during operation, FNP 1
1-and 2 (T.S.
4.7.1.2.2.b.1) 54235 RAI from NRC
- 22. Generic Letter 09-21-84 02-03-84 09-01-84 83-43, 10-25-84 54236 issued Reporting 07-25-84.
Requirements of_
10CFR50.72 and 50.73, FNP-1 and 2 (T.S.
6.9.1.11,12.13)
_.. _ _.._. _ ~,.
r I
ATTACMENT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SLBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE
_ DATE REMARKS
- 23. Administrative 05-14-84 11-12-84 55029 Change to 55030 Reflect Senior Vice President Change, FNP-1 and 2 (T.S.
6.1, 6.2, 6.5, 6.6, 6.7 and
. Figure 6.2.1)
' 25. RWST and 06-01-84 12-01-84 55169 Accumulator IST 55170 Justification, FNP-1 and 2 (IST Program)
- 26. Administrative 06-25-84 12-01-84 55412 Change to 55413 Reflect 2 Assistant Plant Managers, FNP 1 and 2 (T.S.
Figure 6.2-2)
- 27. Administrative 07-06-84 01-07-85 55409 Change to 55410 Remove Snubber Tables and Other Minor Changes, FNP-1 and 2 (T.S.
Tables 3.7-4a and b)
- 28. Revised Heatup 04-20-84 03-01-85 54894 and Cooldown (FNP-1)
(FNP-1)
Curves Based on Reactor Vessel 02-10-84 02-10-85 54234 Material 06-18-84 (FNP-2)
Surveillance (FNP-2)
Program, FNP-1
ATTAC MENT PAGE 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED
~ ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS 03-01-85
- 29. Special Test 10-15-84 Exception to Eliminate l
Excessive Flux Happing During Startup After R.0., FNP-1 and 2 (T.S.
3/4.10.2)
- 31. Technical 30 days Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S.
of 3/4.3) generic changes 06-18-82 To be
- 32. Schedular Exemption to 07-27-82 deter-Appendix R 05-15-84 mined Al ternatiye 08-06-84 Shutdown Requirement, FNP-1 and 2 Placed on
- 33. Chlorine Detection hold by Systems, FNP-1 APCo.
and 2 (T.S.
3.3.3.6)
Placed on
- 34. RCP Breaker Position Trip hold by Deletion, FNP-1 APCo.
and 2 (T.S.
Table 3.3-1)