ML20096C255

From kanterella
Jump to navigation Jump to search
Provides Correction to Submittal Concerning Applicability of Spec 3.0.4 to one-time 30-day Extension Clause
ML20096C255
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/05/1996
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096C262 List:
References
NUDOCS 9601170194
Download: ML20096C255 (2)


Text

_ . _ . . - - . . . . - . _.. - . _ . - . . _ -

South 2rn Nuctsar Optrating Company Post Office Box 1295 Birmingham, Alabama 35201

. Tajtphone (205) 868-5131 i *

  • m i o.ve uorey Southern Nudear Operating Company i Vice President I b8dkggyng_$9_34g P UM So the southw e!ectnc systm 50-364 l t

U. S. Nuclear Regulatory Commission

ATTN.: Document Control Desk Washington, D.C. 20555 I

i) Joseph M. Farley Nuclear Plant i Correction of Submittal-4 Request to Revise Technical SWFWns Control Room Emernency Ventilation System j Ladies and Gentlemen:

i On December 19,1995, Southern Nuclear Operating Company (SNC) submitted a request to i revise " Technical Specifications Control Room Emergency Ventilation System." The purpose

of this letter is to correct our submittal concerning the applicability of Specification 3.0.4 to the 4

one-time 30-day extension clause. The existing 10 CFR 50.92 significant hazards evaluation previously submitted by SNC provides a satisfactory basis for stating that Specification 3.0.4

requirements are not applicable during the 30-day extension period. Therefore, this change l has no effect on the 10CFR50.92 significant hazards evaluation previously submitted.
The revised typed pages of the proposed technical specifications, including page change j instructions, are included in Enclosure 1. The marked pages are provided in Enclosure 2.

j If there are any questions, please advise.

Respectfully submitted, j dh 3km

Dave Morey 1 Sworn to andsubscrib before me s b dayof WtALL 1996 WlarfXcc le chr- l/ C/

Notary Public My Commission Expires: /, / 99 7 EFB/ cit:crements. doc Enclosures

1. Page Change Instructions and Revised Pages
2. Hand-Marked Pages cc: Mr. B. L. Siegel, NRR Senior Project Manager l Mr. S. D. Ebneter, Region II Administrator /

Mr. T. M. Ross, Plant Senior Resident Inspector L OO(

1 Bn n pr. D. E. williamson, State of Alabama 1(g 9601170194 960105 \

PDR ADOCK 05000349 P PDR

ENCLOSURE 1 Joseph M. Farley Nuclear Plant Correction of Submittal-Request to Revise Technical Specifications Control Room Emergency Ventilation System Changed Pages Unit 1 Remove Pane Insert Pane Page 3/4 7-16 Replace Page 3/4 7-17b Replace Unit 2 Remove Page Insert Page Page 3/4 7-16 Replace Page 3/4 7-17b Replace El-1

_ , .