- HL-1920, Forwards Design Summary & 10CFR50.59 Evaluation for Planned Addition of Pressure Sensor Actuation for Main Steam Srv,Per 910723 Meeting + (ML20091K819)
- ML20091K820 + (ML20091K820)
- NL-19-1125, Independent Spent Fuel Storage Installation - Decommissioning Funding Plan Triennial Update + (ML20091K821)
- ML20091K822 + (ML20091K822)
- ML20091K826 + (ML20091K826)
- ML20091K831 + (ML20091K831)
- ML20091K844 + (ML20091K844)
- ML20091K852 + (ML20091K852)
- 1CAN058401, Monthly Operating Rept for Apr 1984 + (ML20091K855)
- ML20091K859 + (ML20091K859)
- ELV-03330, Advises That Util Provided W/Salp Rept for Oct 1990 to Sept 1991 Via NRC .Rept Discussed W/Nrc During 911204 Meeting.Util Has No Further Comments on Rept + (ML20091K863)
- NRC-84-0088, Requests Exemption from Provisions Authorizing Utilization of Alternative Pipe Break Criteria Employed in Resolution of Generic Issue A-2, Asymmetric Blowdown Loads on PWR Primary Sys + (ML20091K870)
- ML20091K871 + (ML20091K871)
- ML20091K873 + (ML20091K873)
- ML20091K876 + (ML20091K876)
- ML20091K884 + (ML20091K884)
- ML20091K886 + (ML20091K886)
- ML20091K887 + (ML20091K887)
- ML20091K891 + (ML20091K891)
- ML20091K892 + (ML20091K892)
- ML20091K894 + (ML20091K894)
- ML20091K895 + (ML20091K895)
- ML20091K899 + (ML20091K899)
- ML20091K902 + (ML20091K902)
- ML20091K903 + (ML20091K903)
- ML20091K910 + (ML20091K910)
- ML20091K913 + (ML20091K913)
- ML20091K916 + (ML20091K916)
- ML20091K919 + (ML20091K919)
- ML20091K928 + (ML20091K928)
- ML20091K932 + (ML20091K932)
- 05000305/LER-1984-008, :on 840505,intermediate Range Hi Flux Reactor Trip Received on Channel N35.Caused by Faulty Detector. Engineering Study in Progress + (ML20091K933)
- ML20091K934 + (ML20091K934)
- ML20091K937 + (ML20091K937)
- ML20091K941 + (ML20091K941)
- ML20091K944 + (ML20091K944)
- TXX-4191, Forwards Description & Summary Evaluation of Deferred Preoperational Testing of Turbine Driven Auxiliary Feedwater Pump Steam Supply Line Check & Drain Pot Level Control Valves & Reactor Coolant Pump Seal Performance + (ML20091K945)
- HL-2000, Forwards Rev 2 to SIR-91-077, IGSCC Flaw Evaluations & Weld Overlay Activities During Ei Hatch Unit 1 Fall 1991 Outage. Rept Addresses Six Areas Noted in NRC Re Weld Overlay Designs,Per Generic Ltr 88-01 & NUREG-0313,Rev 2 + (ML20091K947)
- ML20091K950 + (ML20091K950)
- 05000416/LER-1984-027, :on 840503,offsite Power Supply to ESF Transformer 12 from 115 Kv Line Lost During Electrical Storm,Resulting in Deenergization of Div 1 & Div 3 ESF Buses.Caused by Lightning Strike + (ML20091K952)
- ML20091K953 + (ML20091K953)
- AECM-84-0299, Forwards Supplemental Info on Tech Spec Review Problem Sheets 100,305 & 336 + (ML20091K955)
- ML20091K956 + (ML20091K956)
- ML20091K957 + (ML20091K957)
- ML20091K960 + (ML20091K960)
- ML20091K965 + (ML20091K965)
- LIC-95-0159, Forwards Response to NRC Re Violations Noted in Insp Rept 50-285/95-09 on 950521-0701.Corrective Actions: Counseled Individual Conducting Assessment + (ML20091K968)
- ML20091K970 + (ML20091K970)
- ML20091K975 + (ML20091K975)
- 05000373/LER-1995-013-01, :on 950726,discovered That DG 1B Low Lube Oil Pressure Shutdown Switch (PS-1E22-N515) Not Calibr Per Procedure LIP-DG-505 Due to Personnel Error.Dg 1B Low Lube Oil Pressure Shutdown Switch Calibr + (ML20091K976)
- ML20091K977 + (ML20091K977)