ML20091K859
| ML20091K859 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 04/30/1984 |
| From: | Musolf D, Myrabo A NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8406070227 | |
| Download: ML20091K859 (5) | |
Text
g l'3 1 MAY 4 084 0
OPERATING DATA REPORT DOCKET NO.
50-263_____-
DATE 5-1-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING: STATUS INotes l
- 1. Unit Name : __________._ ____________Monticetto l
l
- 2. Rcporting period: ___________________ APRIL i
l
- 3. Licensed ~ Thermal Power (MWt):
____________1670 l
l 4., Nameplate Rating (Gross MWe):
__..__________569 l
l
- 5. Dasign Electrical Rating (Net MWe)
_____545.4 l
l
- 16. Max imum Dependab Le.Capac i ty (Gross MWe)-- __553 l
l
- 7. Maximum Dependable Capacity (Net MWe):
____525 l__________________________l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
__N/A_____________________________________________
--9.
Pcwer. Level To Which Restricted, If Any (Net NWe)
___N/A___________________
- 10. R;asons For Restrictions, If Any:
__N/A_____________________________________
This Month Yr.-to-Date Cumulative 11'. Hours In Reporting Period
_____719
_____2903
____i12512
- 12. Number Of Hours Reactor Was Critical 0.0
___ 810.5
__ 89915.4
- 13. Reactor' Reserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hours Generator On-Line 0.0
___ 808.8
__ 88003.0 115. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.0
- 16. Gross Thermal Energy Generated (MWH) 0 897898
_141233814
- 17. Gross Electrical Energy Generated-(MWH) 0
__ 296117
__45185053
- 18. Nat Electrical Energy Generate.d (MWH)
__ -1162
_ _ -2 7 6 6 6 9
__43188433
- 19. Unit Service Factor 0.0%
___ 27.9%
____ 78.2%
- 20.' Unit AvalLabiLity Factor 0.0%
___ 27.9%
____ 78.2%
21.-Unit Capacity Factor (Using MDC. Net)
__ -0.3%
___ 18.2%
____ 73.1%
22.: Unit Capacity Factor (Using DER Net)
__ -0.3%
___ 17.8%
____ 71.9%
.23. Unit Forced Outage Rate 0.0%
0.0%
5.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
__ February 3, 1984 - Refueling Outage - 264 days ________________________
.25.
If Shut Down At End Of Report Period, Estimated Date Of Startup:__iO-24-84__
- 26. Units In Test Status (Prior to Commercial Operation)- N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION B406070227 840430 Idy d PDR ADOCK 05000263
/
f R
y
-k..
- s -
t
-AVERAGE-DAILY UNIT-POWER LEVEL DOCKET NO.
50-263______
UNIT Mont i ce l lo__
DATE 5-1-84____
COMPLETED BY A.
L. Myrabo TELEPHONE 612/295-5151
. MONTH
-____' APRIL.
-DAY ~
AVERAGE DAILY POWER LEVEL' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
_a_
i7
_i-__
. ~
.n
_o 18
_n&____________
3
. - _ _ _ _ _ _. _ _ _o_
19
_o__
4
_o____
90
_o____________
5-
-?.____________
21
-i_______-____
g'
_i__-____ __ _
on
-o__
n2
_o_____________
-7
_o ___________
.8.
-9______
94
-9______
~
~
h~5
-i___- ______
9; n___
u 10
-2___
26
-9 ii
_1____
o7
_n
~
>1o
_o o8
_1
~9
_o ____-_-____
13-o
-14
_i ____
30
-9 15 31 16
-9__
~
INSTRUCTIONS On.this format, List the average daily unit power levet in MWe-Het for each day in the reporting month.
Cornp it t e to the nearest who le inegawa t t.
g.
r v'/ --
4.
1 NARRATIVE;
SUMMARY
OF OPERATING: EXPERIENCE
~ ' '
a.
-a DOCKET NO. 263______.
~
DATE 5 8 4____.
COMPLETED BY A.
L. Myrabo TELEPHONE 612/295-5151 MONTHL______ APRIL
-4_
g_g4
. 'to.
Continuatio'n:of 1984 refueling outage.
_4-30-84' u'
t 7
W I-
- s t
Notet Power operat ion defined as essent i a L Ly 100% of rated power-except for weekend Load drops for speci fied survel L Lance testing.
o
.u -
n J
'R
.s n
- UNIT SilCTDOWNS AND POWER REDUCTIONS DOCKET NO.-
50-263-
. ~ ~.
UNIT N AME. Monticello DATE 5-1-84 REPORT MONTit APRIL COMPLETED ilY A. L. Myrabo TELEPHONE 612/295-5151
=_
c.
'E f
5 p g4 Licensee
=,t, E%
Cause & Correctne 2:
E No.
Date
~E R
2i5 Esent s7 53 Action to
$E E
j 5. j Repors =
nU Prevent Recurrence
._E 2
2-3-84 S
719 C
1 N/A ZZZZ ZZZZZZ Continuation of 1984 Refueling outage I
2 3
4 F Fossed Reason.
Method:
Exhibit G. Instructicos S. Scheduleil A Equipment FailureIExplain) 14tanual for Preparation of Data Bataintenance or Test 2-Manual Seram.
Entr> Sheels for Licensee C-Refueling 3-Automatic Saam.
Event Report (LERIFile NUREG.
D Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & License Examination F-Adnunistrative
.i G-Operational Ee ror IExplain t Exhibit I - Same Source PH77) ll 0:her (E splain)
l
[>g l
Northem States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330 5500 May 4, 1984 Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report April, 1984 Attached are twelve copies of the Monthly Operating Report for April, 1984 for the Monticello Nuclear Generating Plant.
O M _o0 David Musolf Manager of Nuclear Sup rt Services DMM/ dab cc:
Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment gh,
((
app u'
l
,pa l
%d Y,
I
\\
\\
l
__