Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087N812 + (ML20087N812)
- 05000325/LER-1981-055-03, Drywell Equipment Drain Flow Integrator 1-G16-FQ-K603 Continuously Indicated Dwed Sump Flow W/No Pumps Running.Caused by Water Being Introduced Into Pneumatic Calibrator + (ML20087N813)
- ML20087N814 + (ML20087N814)
- ML20087N815 + (ML20087N815)
- ML20087N816 + (ML20087N816)
- 05000325/LER-1981-053-03, During Reactor Startup, Reactor Recirculation Pump 1B Tripped.Caused by Spurious Trip Signal from ATWS Low Water Level Instrument B21-LTM- NO24B-2.Instrument Replaced + (ML20087N817)
- ML20087N821 + (ML20087N821)
- ML20087N832 + (ML20087N832)
- ML20087N833 + (ML20087N833)
- ML20087N837 + (ML20087N837)
- ML20087N845 + (ML20087N845)
- ML20087N848 + (ML20087N848)
- ML20087N853 + (ML20087N853)
- 05000278/LER-1984-001, :on 840106,HPCI Turbine Exhaust Rupture Diaphragm Alarm Annunciated Following Startup.Caused by Inner Rupture Disk PSD3-23-6 Ruptured.Inner Rupture Disc Replaced + (ML20087N855)
- ML20087N857 + (ML20087N857)
- ML20087N860 + (ML20087N860)
- ML20087N864 + (ML20087N864)
- ML20087N869 + (ML20087N869)
- ML20087N871 + (ML20087N871)
- ML20087N874 + (ML20087N874)
- ML20087N876 + (ML20087N876)
- ML20087N879 + (ML20087N879)
- ML20087N881 + (ML20087N881)
- 05000317/LER-1981-058-03, Emergency Diesel Generator 12 to 4 Kv Bus 21 out-of-svc.Caused by Stuck Auxiliary Contact in Emergency Diesel Generator 12 Output Breaker to 4 Kv Bus 14.Switch Replaced + (ML20087N883)
- ML20087N910 + (ML20087N910)
- ML20087N914 + (ML20087N914)
- ML20087N916 + (ML20087N916)
- 05000272/LER-1984-009, :on 840229,technical Discrepancy Confirmed by Bechtel in Design Elevation Calculations for Svc Water Intake Structure.Caused by Design Error.Design Change Will Be Made to Raise Level of Air Intake Louvers + (ML20087N922)
- 05000285/LER-1984-002, :on 840303,during Scheduled Refueling Shutdown, Five Main Steam Safety Valves Failed to Lift within +/- 1% of Tech Specs.Caused by Normal Drift of Valve Setting.Test Revised + (ML20087N924)
- ML20087N925 + (ML20087N925)
- ML20087N926 + (ML20087N926)
- ML20087N928 + (ML20087N928)
- ML20087N932 + (ML20087N932)
- A03654, Forwards Amend 2 to Probabilistic Safety Study + (ML20087N933)
- ML20087N938 + (ML20087N938)
- B11094, Forwards marked-up Page to Draft SER Chapter 18.0, Human Factors Engineering, Correcting Errors Re Response Ltr & Commitment Dates + (ML20087N942)
- ML20087N956 + (ML20087N956)
- ML20087N973 + (ML20087N973)
- ML20087N980 + (ML20087N980)
- NRC-84-0053, Forwards Justification for Interim Operation for Seismic Qualification of Model 581A Differential Pressure Indicating Switch Not Included in NSSS Qualification Program.Final Resolution of Issues Expected by June 1984 + (ML20087N982)
- ML20087N983 + (ML20087N983)
- ML20087N984 + (ML20087N984)
- ML20087N988 + (ML20087N988)
- ML20087N993 + (ML20087N993)
- ML20087N994 + (ML20087N994)
- ML20087N995 + (ML20087N995)
- ML20087N996 + (ML20087N996)
- ML20087N997 + (ML20087N997)
- ML20087N999 + (ML20087N999)
- DCL-84-067, Forwards Response to NRC Request to Identify & Provide Basis for Acceptance of Welded ASTM A-325 Bolting in Pipe Support Design,Per 840119 Site Visit + (ML20087P001)
- ML20087P002 + (ML20087P002)