- MaiHng Address At:bama Power Company 4
600 North 18th Street
- Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081
' F. L Clayton, Jr.
Senior Vice President Flintridge Building AlabamaPower thesouttwn electnc system March 27, 1984 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to NRC Staff Coments on River Water / Diesel Generator Testing Technical Specification Change Request Gentlemen:
By. letter. dated January 4,1984, the NRC Staff requested additional information in response to Alabama Power Company's request for a permanent change to the River Water and Diesel Generator Technical Specifications dated December 30, 1982. Alabama Power Company provided the requested information in letter dated March 2,1984 During telephone conversations on March 21 and 22,1984, the NRC Staff provided comments and requested. supplemental information related to the subject request. Alabama Power Company provides herein a response to the requests identified during these telephone conversations.
The original technical specification request identified the maximum load for diesel generator 1C to be 46 kw above the continuous rating. In subsequent submittals, Alabama Power Company proposed to realign certain electrical loads thereby reducing diesel generator 1C loads below the continuous rating. Since the diesel generator 1C maximum load is not significant conpared to the diesel capacity (only two percent above the 1 continuous rating), Alabama Power Company agrees with the NRC that realignment of electrical loads is not necessary and the electrical realignment proposed in the March 2,1984 letter will not be implemented.
Alabama Power Company's proposed technical specification change reduced l
the diesel generator 2C automatically sequenced loads to 214 kw. The NRC l
Staff requested that' diesel generator 2C be maintained'at approximately 50 percent of the continuous rating or greater. Alabama Pewer Company concurs with the NRC Staff and will either operate diesel generator 2C as recommended by the diesel manufacturer which requires operation above 50 percent of the continuous rating, or will shift the 214 kw to the other diesel generators'.
k b
I S404050297 840327 1
PDR ADOCK 05000348 1
P-PDR i..__
\\
Mr. S. A. Varga March 27, 1984 L-
. U. -S. Nuclear Regulatory Commission Page 2 i
'The NRC Staff stated that the request to reduce the diesel generator
- load following 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> testing and the proposal to perform the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> load test at the continuous rating will not be approved.
It is the position of Alabama. Power Company and the diesel generator manufacturer that the diesel generators should cooldown before the hot restart test is performed ano that
.the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> load test be performed at the continuous rating rather than the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating.
In order to resolve these last remaining issues, Alabama EPower Company requests a meeting with the NRC Staff be scheduled in the near
. future.
If_.there are-any questions, please advise.
Yours very AfuTy, Q$h H'I F. L. Clayton, Jr.
FLCJr/CJS:ddr-D32 cc: Mr. R. A. Thomas Mr.LJ. P. O'Reilly Mr. E. A. Reeves Mr. W..H. Bradford