ML20087N910
| ML20087N910 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/26/1984 |
| From: | Sorrell E GEORGIA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| DCS-84-10, PROC-840126, NUDOCS 8404050186 | |
| Download: ML20087N910 (6) | |
Text
,
I
..s GEORGIA POWER COPFANY HATCH NUCLEAR PLANT PROCEDURE Determination of Specific Activity of Spent Resin and Curie Content of liner (Stggi or High Ip,t.12rity Coptginer)
PROCEDURE TITLE HNP-gQ]1 PROCEDURE NUMBER Lab RESPONSIBLE SECTION SAFETY RELATED ( X )
NON-SAFETY RELATED (
)
APPROVED APPROVED REV.
DESCRIPTION DEPT.
GEbERAL DATE MANAGER MANAGER l
.a______.
2 DELETED - REPLACED
/
/,g(Q t g Q',Q
/
BY HNP-8016
(.
f t
i 1
I i
1 W
~.
840126 HNP-9 h,
OWh
GEGtGIA POWER COPPANY s
HATCH M.JCLEAR PLANT
.i PROCEDURE Barnwell Site Disposal Criteria PROCEDURE TITLE HM'-8401 PROCEDURE NUPEER Lab RESPONSIBLE SECTION ie i
SAFETY RELATED ( X )
NON-SAFETY RELATED (
)
APPROVED APPROVED REV.
DESCRIPTION DEPT.
GENERAL DATE MANAGER MANAGER
._-_-___-__y_--_.
O DELETED - REPLACED h-
._-_%n_ - _ %_ - _ _ j,[
/
BY HNP-8016
\\..-
/
't t
.---_---_----___-.-----_7-----_8--------
u%-S
.,..-%w a-e GEORGIA PObER COlPANY D
HATCH NUCLEAR PLANT PROCEDURE Handlina and Loadina of Chgm-Nuclear Casks 14-195H and 21-300 PRDCEDURE TITLE HNP-8420 PROCEDURE NUPEER lab RESPONSIBLE SECTION SAFETY RELATED ( X )
NON-SAFETY RELATED (
)
APPROVED APPROVED REV.
DESCRIPTION DEPT.
GENERAL DATE MANAGER MANAGER i
/
4 DELETED - REPLACED dQg _ h
-- g-.
BY HNP-sol 6
- ______3_,
~
t 9
m
+--___---------_-----.
. i.
6---_-----_----__---_
y--_-__------_---_---.
u _---_---- ----_------------------_--.. - - - - -. _ -. _ - - - - - - - -.._------.
~+
massalsetHNP-9 e-w-
--i---W p
s.
Poet Office Box 430 flanley, Georgia 31513
' Telephone 912 367-7781 912 537-9444 m
Georgia Power Edwin 1. Hatch NucNer Plant January 26, 1984
, DCS-84-10 PLANT E. I. HATCH Emergency implementing Procedures Docket Nos. 50-321/50-366 United States Nuclear Regulatory Comission l'irector of Nuclear Reactor Regulation Washington, DC 20555 Gentlemen:
Pursuant to Appendix E.Section V of 10 CFR 50, please find enclosed ten (1C) cop.ies of Transmittal and Title Pages of deleted procedures' of Plant' E. I. Hatch Emergency Procedures. Three (3) copies of these transmittals and Title Pages are also being forwarded to the Region II office in Atlanta, Georgia.
E. C. Sorrell Document Control Supervisor ECS/ car xc:
U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 file (o
w""^ g-
)(g)()$
-a 1
i
'o,,
UNITED STATES l'
NUCLE AR REGULATORY COMMISSION o
f
.. I WASHINGTON, D. C. 20555
%,,.....,o/
March 22, 1984 50-321/366 Itatch MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM:
Director, Divison of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The submitter of the attached document has expressed no desire to withhold any information contained therein. Therefore, this material may now be made publicly available.
., fan J. M. Felton, Director Division of Rules and Rec ds Office of Administratio
Attachment:
As stated
.): w.. are.. m x
~
...fNi-WA DOCUPENT TRANSMITTM.
,.~.
[-gs;.C.
TRANSMITTAL. NO: O c_ o _ S-V 6 s-Mii I
DATE:
/- 2ddI sm.
.f' / 's
~
~J'
./ -
/ Z.
/-~
TRANSMITT.E.D TO:
r
.-s s
- c. ' VE N DESCRIPTION OF DOctA'1ENT(S') TRANSMITTED:
m.;
n.
f
,r?,
V lbn e W
L h,-
9 %l
.i..'
[j T\\ f.- 9 0'$ f C.
'L.
Id n l-~ S<A 0 I L.O J..
a
.}
M r4/', P 97. d 4, t/
j
~T
.s.
yr
$..,_.s 2
- @..ac:
O, TJ -
- t. _';.! ', oi
~
6
.o c
a.
j RECEIVED BY DATE:
s y, n 1.
e jf-J,I
]
RETURN THIS TRANSMITTAL. AND ANY DOCUMENTS REGUIRED TO BE a
RETURNED, TO TFE DOCUMENT CONTROL DEPARTMENT.
.{
),./,;. < ;,
l' DESCRIPTION OF DOCUMENT (S) TO BE RETURNED:
}
\\
L) n P- [(*03 /
tt, L.
LIh l'- PYO /
40
.y,;
t4n69YcO d.V 1
O.
DATE RETURN REGUIRED
/
C.uCL L lad 3
DOCUMENT CONTROL $UPERVISOR f.
4.
HNP-0-ADM-OOO10 R13 e
N e.,
j
.=w wg
- 4..
':J:,4%
,n
.,,,.