Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20086A618 + (ML20086A618)
- 05000498/LER-1991-022, :on 911014,licensed Operator Failed to Block Turbine Trip Signal,Resulting in Turbine & Reactor Trip. Caused by Personnel error.Site-wide Training Sessions Held for Appropriate Plant Personnel + (ML20086A622)
- ML20086A624 + (ML20086A624)
- ML20086A625 + (ML20086A625)
- ML20086A626 + (ML20086A626)
- ST-HL-AE-5111, Forwards Response to GL 95-03, Circumferential Cracking of SG Tubes + (ML20086A629)
- ST-HL-AE-3875, Defers Corrective Action for Human Engineering Deficiency Re Reduction of Glare in Unit 2 Control Room.Design Change Intended to Minimize Glare on Control Room Panels Implemented in Unit 1 During Last Refueling Outage + (ML20086A630)
- ML20086A631 + (ML20086A631)
- ML20086A633 + (ML20086A633)
- ML20086A634 + (ML20086A634)
- ML20086A635 + (ML20086A635)
- ML20086A639 + (ML20086A639)
- ML20086A640 + (ML20086A640)
- RBG-41640, Informs That Util Will Not Conduct Core Shroud Insp During Next Refueling outage,RF-6,scheduled to Begin on 960106,as Stated in Util 940824 Response to GL 94-03,based on Listed Info + (ML20086A641)
- ML20086A645 + (ML20086A645)
- ML20086A647 + (ML20086A647)
- ML20086A648 + (ML20086A648)
- ML20086A650 + (ML20086A650)
- ML20086A651 + (ML20086A651)
- ML20086A653 + (ML20086A653)
- 05000219/LER-1983-018-03, /03L Submittal Delayed Due to Need for Plant Operations Review Committee Investigation Into Cause & Corrective Actions.Ro Will Be Submitted by 831108 + (ML20086A655)
- ML20086A662 + (ML20086A662)
- ML20086A664 + (ML20086A664)
- ML20086A671 + (ML20086A671)
- W3P83-3596, Revises Outcome of 830813 Survey of Industries in Site Vicinity W/Toxic Chemical Inventories.Util Elected to Perform Complete New Survey to Provide More Consistent Baseline Against Which Future Resurveys Can Be Compared + (ML20086A685)
- W3P83-3143, Suppls 790615 Response to IE Bulletin 79-09 Re Failures of GE Type AK-2 Circuit Breakers.Review of IE Bulletin 83-04 & Generic Ltr 83-28 Continuing.Changes to ME-4-155 Re Reactor Trip Switchgear Adequate + (ML20086A687)
- ML20086A697 + (ML20086A697)
- ML20086A705 + (ML20086A705)
- ML20086A709 + (ML20086A709)
- ML20086A715 + (ML20086A715)
- ML20086A716 + (ML20086A716)
- RBG-16313, Forwards Responses to Open Items in Meteorological & Effluent Treatment Branch Draft SER & NRC .Changes Will Be Incorporated Into Next Amend to FSAR + (ML20086A718)
- ML20086A725 + (ML20086A725)
- 05000395/LER-1991-009, :on 911015,discovered That Chg/Safety Injection Pump Runoff Limit Outside Tech Spec Limit of 680 Gpm.Caused by Effect of Instrument Uncertainties & Suction Boost.Cold Leg Injection Alignment Rebalanced + (ML20086A728)
- ML20086A729 + (ML20086A729)
- ML20086A731 + (ML20086A731)
- 05000293/LER-1983-051-03, During steady-state Operations,Drywell Airborne Leak Detection Sys Found Inoperable.Caused by Low Flow Particulate Sys Traced to Water Clogged Filter & Leak in Sensing Line + (ML20086A738)
- ML20086A742 + (ML20086A742)
- ML20086A749 + (ML20086A749)
- 05000293/LER-1983-054-03, /03L-0:on 831014,during steady-state Operation, Downscale Monitor Alarm Observed for Offgas Monitor 1705-3A. Caused by Dirty Signal Connector.Signal Connector Cleaned. Monitor Successfully Tested + (ML20086A753)
- ML20086A756 + (ML20086A756)
- ML20086A760 + (ML20086A760)
- ML20086A768 + (ML20086A768)
- ML20086A772 + (ML20086A772)
- ML20086A778 + (ML20086A778)
- 05000413/LER-1991-025, :on 910730,hi-hi Auxiliary Feedwater turbine- Driven Pump Sump Level Annunicator Continuously Alarmed in Control Room.Caused by Design Deficiency.Throttle Valve in Discharge Header Opened + (ML20086A783)
- ML20086A784 + (ML20086A784)
- ML20086A786 + (ML20086A786)
- 05000397/LER-1989-001, :on 890112,discovered Four New Unanalyzed Failure Modes in Containment Nitrogen Inerting Sys.Caused by Inadequate Design Procedures.Design Change Initiated to Install low-temp Cutoff Device + (ML20086A789)
- RBG-16-332, Forwards Responses to Environ Rept - OL Stage,Review Questions E310.4 & E290.9 Re Mgt of Natural Resources Not Needed for Energy Production & Estimate of Average Workers Payroll.Mgt Guidelines Developed + (ML20086A792)
- 05000247/LER-1983-036-01, /01T-0:on 831013,during Cold Shutdown,Westinghouse Reported That Vendor Procured Barton Pressure Transmitters W/Previously Undefined Errors at Both Abnormal & Accident Temp Conditions + (ML20086A799)