PENHI
=~
1671 Worcashr Road Framingham. Monachusetts 01701 Pubic Service of New Mcmpshire (617)- 872-8100 October 13, 1983 SBN-571 T.F. B4.2.7 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Attention:
Mr. Richard W. Starostecki, Director Division of Project and Resident Programs
References:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) USNRC Letter, dated September 12, 1983, " Combined Inspection Nos. 50-443/83-13 and 50-444/83-10" R. W. Starostecki to R. J. Harrison Subj ect:
Response to Combined Inspection Nos. 50-443/83-13 and 50-444/83-10
Dear Sir:
In response to the violation which was reported in the subject inspection, we offer the following:
NRC Notice of Violation (443/83-13-01):
10 CFR 50, Appendix B, Criterion V and Section 17.1.1.5 of the Seabrook Station FSAR require that activities affecting quality be controlled by and accomplished in accordance with the appropriate instructions, procedures, or drawings. United Engineers and Constructors (UE&C) Administrative Procedure (AP-15, Revision 17) specifies the program of controls for changes to design documents and requires that major generic Engineering Change Authorizations (ECA) be issued for implementation only af ter design concurrence is accomplished.
Contrary to the above, as of August 1,1983, a major generic ECA (19/1591A), a revision to the torque requirements for the cooling tower service water piping flange connections, was issued and implemented without design concurrence having been accomplished.
This is a Severity Level V Violation (Supplement II).
0311160096 831028
~'
PDR ADOCK 05000443 G
PDR 1000ElmSt. P.O. Box 330.Monchester NHO3105 Telephone (603)669-4000 TWX7102207595
United States Nuclear Regulatory Commission October 13, 1983 Attention:
Mr. Richard W. Starostecki, Director Page 2
Response
Corrective Action Taken and Results Achieved:
This ECA was written as a standard Major Generic ECA and was inadvertently released to the installation contractor (P-H) for implementation prior to UE&C Home Office concurrence. When it was determined that it should have been handled as a Specific ECA, the standard ECA was removed from the system (before formal issue) and replaced with an On-The-Spot ECA.
Because of the mix up in ECA processing, P-H issued NCR #4925. ECA 19/1591 was subsequently voided and the required technical information was transmitted via the Nonconformance Review Board Report for NCR #4925.
To preclude repetition of this isolated occurrence,' UE&C has taken the following steps:
1.
A management memo has been issued to UE&C Site Engineering staff l
reinforcing the requirement for concurrence of Major. Generic ECAs before issuance to contractors as required by Project Administrative Procedure 15.
f
?.
The issue of prematurely initiating work with the contractor prior to issuance of ac ECA has been discussed with the responsible engineer. Any l-previous misunderstandings have been clarified.
3.
The Design Change Program is -structured so that a Specific ECA supersedes a Generic ECA. Contractor programs are structured for compliance with a Generic ECA when it is applicable. YAEC has requested that P-H clarify their Procedure IX-6 stating that Specific ECAs supersede Generic ECAs and design guidelines.
Corrective action, including necessary procedure revisions will be completed by November 15, 1983.
.Very,truly yours,.
[
YANKEE ATOMIC LECTRIC COMPANY N
l John DeVincentis Project hhnager JDV/bal
~
cc: Atomic Safety.and Licensing Board. Service List l-
s 4 ' '
~ William S. Jordin, III, Esquire Brentwood Board of Selectmen Harmon & Weiss RED Dalton Road 1725.1 Street, N.W. Suite 506 Brentwood, New Hampshire 03833 Washington, DC 20006 j
Roy P. Lessy, Jr., Esquire i
Office of the Executive Legal Director Edward F. Meany U.S. Nuclear Regulatory Commission Designated Representative of Washington, DC 20555 the Town of Rye 155 Washington Road i
Robert A. Backus Esquire Rye, NH 03870 116 Lowell Street g
P.O. Box 516 Calvin A. Canney Mancehster, NH 03105 City Manager l
City Hall Philip Ahrens, Esquire 126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 Department of the Attorney General Augusta, ME 04333 Dana Bisbee, Esquire Assistant Attorney General Mr. John B. Tanzer Office of the Attorney General Designated Representative of 208 State House Annex the Town of Hampton Concord, NH 03842 5 Morningside Drive Hampton, NH 03842 Anne Verge, Chairperson Board of Selectmen i
Roberta C. Pevear Town Hall i
Designated Representative of South Hampton, NH 03842 the Town of Hampton Falls Drinkwater Road Patrick J. McKeon Hampton Falls, NH 03844 Selectmen's' Office 10 Central Road.
Mrs. Sandra Gavutis Rye, NH 03870 Designated Representative of the Town of Kensington David R. Lewis, Esquire RFD 1
. Atomic' Safety and Licensing Board East Kingston, NH 03827 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Jo Ann Shotwell, Esquire Assistant Attorney General Mr. Angie Machiros Environmental Protection Bureau Chairman'of the Board of Selectmen i
Department of the Attorney General Town of Newbury One Ashburton Place, 19th Floor-Newbu ry, - MA 01950 Boston,' MA 02108
'Maynard B. Pearson i
Senator Gordon J. Humphrey 40 Monroe Street U.S. Senate Amesbury, MA 01913 Washington, DC 20510 (Attn: Tom Burack)
Senator Gordon J.-Humphrey
~
1 Pillsbury Street-:
. Diana P. Randall Concord, NH 03301:
70 Collins Street
-(Attn: Herb Boynton)
SEabrook, NH 03874-l Richard E. Sullivan, Mayor Donald E. Chick City Hall
. Town, Manager Newburyport, MA 01950 1
Town of Exeter l
10 Front Street Exeter, NH 03833 l
l
~
..