ML20086A725

From kanterella
Jump to navigation Jump to search
Forwards Updated Status of Tech Spec Change Requests Not Approved by NRC & Not Withdrawn by .Requests Review & Approval of Change Request Needed for Restart Be Processed First
ML20086A725
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/08/1983
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
5211-83-314, NUDOCS 8311160090
Download: ML20086A725 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ - - _

l

,~

e GPU Nuclear Corporation Nuclear

=eme:r8o o

s Middletown, Pennsylvania 17057-0191 717 944 7621 l

TELEX 84 2386 l

Writer's Direct Dial Number:

November 8, 1983 5211-83-314 l

Office of Nuclear Reactor Regulations Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Status of TMI-l Technical Specification Change Requests (TSCR)

Attached is a table which provides updated status of TSCRs for TMI-l which have not yet been approved by the NRC and were not withdrawn by our letter dated February 9, 1983 (5211-83-037). This table should facilitate a mutual understanding of the status of each pending TSCR.

It is requested that the priority for NRC review and approval be given first to process the TSCR needed for restart (TSCR 125) and then to those designated as "as soon as possible" (TSCR's 116, 126, and 134).

Also, please note that this letter modifies (withdraws) a portion of TSCR 126.

Finally, you will note that tl.c table contains a column indicating our requested implementation timer.

In order to assure an orderly implementation we request that you notify us by telephone of any amendment that is issued with an implementation dif ferent than requested. We believe that this will prevent any inadvertent non-compliances and preclude any misunderstandings.

Si erely, 0311160090 031108

/

PDR ADOCK 05000289 W

P PDR

\\

oI H

. Hukill Director, TMI-l HDH:CWS:vj f

/[

Attachment cc:

R. Conte J. Van Vliet GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

TSCRs Pending NRC Approval Date Submitted Public Notice implementation TS_CR #

Short Tit le/Subj ec t to NRC 1ssue Date Requested Status 38 Fuel llandling Building Fuel 9/21/76 not yet 30 days of GPUN Phase I response to Casic Drop receipt Ileavy I.oads, NRC affroval

_re_qu es t e d.

97 Fire Protection Rev. 0 1/26/81 60 days of Revision I to be forvarded Rev. 1 TBD not yet receipt to revise automatic to manual action for certain fire suppression systems per Appendix R review results.

NRC approval _

requested af ter Rev. I subm i_t t ed.

~

99 Administrative Changes 4/28/81 not yet immediately NRC apyrovat requested,.

r (various) 104 RV Material Surveillance Rev. 0 6/5/81 not yet immediately As a result of the llost (Capsule withdrawal Sequence)

Rev. 1 4/5/83 Rea c to r's schedule (CR-3)

Rev. 2 TBD this TSCR must be further revised.

NBC approval is re, quested after Rev. ? is s u bm i t,t e_d_.

105 Snubber Surveillance Program Rev. 0 6/8/81 yes 7/13/83 60 days of As a result of NRC review Rev. 1 TBD receipt comments received inform-ally GPUN intends to revise-this TSCR to be more con-sistent with recent STS.

NRC approval is req ue_s t e d after Rev. 1 is sul-mi t t ed.

Date Subnitted Public Notice Implementation TSCR f Short Titic/ Subject to NRC Issue Date Requested Status 110 Auxiliary Building !!VAC Rev. 0 4/6/83 not yet 60 days of Grim intends to revise flow rate Rev. 1 TBD receipt this TSCR to reflect new design basis flowrates as a result of damper replacements and other system changes.

NRC affroval is requested after Rev. 1 is submitted.

1130 Local Icak rate t.csting of 4/21/82 not yet ie=ediately NR_C J froval requested.

new Containment boundry valves 114 High Range Radiation Monitors 1/5/83 not yet 45 days of NRC approval requested.

receipt 116*

RB Purge Surveillance and Rev. 0 8/13/83 not yet 60 days of This TSCR will be revised Limiting Conditions Rev. 1 TBD receipt in response to NRC letter dated 7/8/83.

NRC approva_1 is requested as soo_n as possible af ter Rev. 1 is

.s ub n_i t_t e d.

123 OTSG Report Admin.

4/19/83 N/A N/A Withdrawn. See TSCR 125 124 Deletion of Snubbers for the 3/9/83 yes 7/13/83 30 days of NRC approval requested _.

Safety Valve Tailpipes receipt 125 OTSG Repair Admin. and 6/8/83 yes 8/25/83 immediately Partial NRC approval by Technical Repair approval Amendnent 86.

Further NRC apyroval required for Restart.

=.

s Date Submitted Public Notice Implementation ITSCR #

- Short Title / Subject -

to NRC Issue Date Requested Status 126 10SRG Qualifications and 7/11/83 not yet immediately GPUN requests that NRC

minimum staffing and

approve this request surveillance applicability.

except for the portion-related to IOSRG minimum staffing' levels which is hereby withdrawn.

NRC approval requested as soon as possible.

1340 -

Training Organization Change-10/21/83 not yet immediately NRC approval requested as soon as possible.

)

1

{:

u TSCR's 112, 115 and 129'through'133 not'yet' submitted.

( o___

.