Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082T352 + (ML20082T352)
- ML20082T355 + (ML20082T355)
- ML20082T356 + (ML20082T356)
- ML20082T358 + (ML20082T358)
- ML20082T363 + (ML20082T363)
- ML20082T369 + (ML20082T369)
- ML20082T370 + (ML20082T370)
- ML20082T375 + (ML20082T375)
- ML20082T385 + (ML20082T385)
- ML20082T386 + (ML20082T386)
- ML20082T387 + (ML20082T387)
- ML20082T401 + (ML20082T401)
- ML20082T409 + (ML20082T409)
- ML20082T414 + (ML20082T414)
- ML20082T415 + (ML20082T415)
- ML20082T417 + (ML20082T417)
- 05000260/LER-1983-073-03, /03L-0:on 831128,percent Power/Core Max Limiting Power Density Ratio Found Less than Tech Spec Limit.Caused by Xenon Transient Due to Reactor Scram & Pulling of Rods to Prescram Pattern.Rods Inserted + (ML20082T420)
- ML20082T423 + (ML20082T423)
- ML20082T425 + (ML20082T425)
- ML20082T427 + (ML20082T427)
- 05000338/LER-1991-018, :on 910814,determined That EDG Time Response Testing Performed on 74% Undervoltage Instead of 72% as Required by Tech Specs.Caused by Personnel Error.Time Response Test Procedures Revised + (ML20082T430)
- ML20082T431 + (ML20082T431)
- ML20082T433 + (ML20082T433)
- ML20082T438 + (ML20082T438)
- ML20082T444 + (ML20082T444)
- ML20082T447 + (ML20082T447)
- ML20082T449 + (ML20082T449)
- ML20082T450 + (ML20082T450)
- ML20082T457 + (ML20082T457)
- ML20082T459 + (ML20082T459)
- ML20082T461 + (ML20082T461)
- 05000339/LER-1991-005-03, :on 910814,determined That Degraded Voltage Relay Time Delay Setpoint Outside Tech Spec Limit.Caused by Personnel Error.Relay Reset & Successfully Tested + (ML20082T463)
- ML20082T465 + (ML20082T465)
- ML20082T466 + (ML20082T466)
- ML20082T469 + (ML20082T469)
- ML20082T470 + (ML20082T470)
- ML20082T473 + (ML20082T473)
- ML20082T475 + (ML20082T475)
- ML20082T480 + (ML20082T480)
- ML20082T482 + (ML20082T482)
- ML20082T484 + (ML20082T484)
- ML20082T489 + (ML20082T489)
- ML20082T492 + (ML20082T492)
- ML20082T493 + (ML20082T493)
- ML20082T501 + (ML20082T501)
- ML20082T504 + (ML20082T504)
- ML20082T507 + (ML20082T507)
- BSEP-83-3557, Suppls Response to NRC Re Violations Noted in IE Insp Repts 50-324/82-45 & 50-325/82-45.Corrective Actions: Project Plan for Identifying & Scheduling Instrumentation Calibr Should Be Complete by 840229 + (ML20082T512)
- ML20082T518 + (ML20082T518)
- ML20082T522 + (ML20082T522)
- ML20082T529 + (ML20082T529)