Text
-
... ~ -
(.>
\\
l CPed. ! CO.
PLANT PERFORMANCE DATA SYSTEM PAGE 1
.ERON DATE =09/04/91-OPERATING DATA REPORT RPD36-000
' HUN-TIME 13:19:19 BRUNSWICK UNIT i DOCKET NO.- 050-0325 COMPLETED BY RONALD RUMPLE OPF9ATING STATUS-TELEPHONE (9i9)457-2752
- 1. UNIT NAME: BRUNSWICK UNIT i l NOTES - There are 560 fuel 1
2... REPORTING PERIOD: MAY 91 l bundles in the Reactor Core. Therel
'3.. LICENSED THERMAL POWER (HWT)- 2436 l are 1090 BWR and 160 PWR spent l
~
- 4. NAMEPLATE RATING (GROSS MWE). 867.0 l fuel bundles in the Fuel Pool.
l 5.: DESIGN-ELECTRICAL RATING (NET MWE): 821.0 I There are no fuel bundles in the 1
4.-MAX DEPENDABLE CAPACITY (GROSS MWE) 791.0 l new Fuel Storage Vault.
I s7. MAX. DEPENDABLE CAPACITY (NET MWE)- 767.0 8.-J1F CHANGES OCCUR IN CAPACITY PATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
Items 6 ar.c 7 reflect new HDC values aporoved by CP&L Management as of August 15, 1991.
Vi POWER LEVEL-TO-WHICH RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE.
Lii. HOURS-IN REPORTING PERIOD 744.00 3623.00 12451i.00 L12.. NUMBER OF HOURS. REACTOR CRITICAL 617.68 1365.07 80667.23
'313. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
-:14. HOURS GENERATOR ON LINE 598.67 1232.41 77095.65
- 15. UNIT-RESERVE SHUTDOWN HOURS
.00
.00
.00 1"6. GROSS THERMAL ENERGY GEN. (MWH) 1441798.24 2813351.99 166010995.17
.17C GROSS ELEC. ENERGY GEN. (MWH) 467830.00 915870.00 54449345.00 19J NETLELEC. ENERGYEGENERATED (MWH)
-452639.00 870720.00 52373114.00
- 19. UNIT' SERVICE FACTOR 80.47.
34.02-61.92 20'. UNIT AVAILABILITY FACTOR.
80.47 34.02 61.92
- 21. UNIT-CAP'.~ FACTOR (USING-MDC NET) 79.32.
31.33 53.29
- 22. UNIT CAP. FACTOR (USING DER NET) 74.10 29.27 51.23 J3.-UNIT FORCED OUTAGE RATE 19.53 45.36:
15.78.
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS.(TYPF, DATE, AND DURATION OF EACH).
- 25.?IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE 0F START UP:
- 26. UNITS IN TEST STATUS (PRIOR-TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL. CRITICALITY INITIAL-ELECTRICITY COMMERCIAL OPERATION 9109180229 910912
-PDR ADOCK-05000324 i.16 - 9 R
a v
I CPAL CO r'LANT PERFORMANCE DATA SYSTEM PAGE 2
RUN DATE 09/04/91 OPERATING DATA REPORT RPD36-000 RUN TIME 13: 19:19 BRUNSWICK UNIT ?
DOCKET NO. 050-0324 COMPLETED DY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752
~~----- ----..-----
- i. UNIT NAME: BRUNSWICK UNIT 2 I NOTES - There are 560 f uel l
2.
REPORTING PERIOD: MAY 91 l bundles in the Reactor core. Therei 3.
LICENSED THERMAL POWER (MWT) 2436 l are 1072 BWR and 144 PWR spent fue) 4.
NAMEPLATE RATING (GROSS MWE) 067.0 1 bundles in the Fuel Pool. There l
5.
DESIGN ELECTRICAL RATING (NET MWE) 821.0 t are no fuel bundles in the new l
6.
MAX DEPENDADLE CAPACITY (GROSS MWE) 782.0 l Fuel Storage Vault.
l 7.
MAX DEPENDABLE CAPACITY (NET MWE) 754.0 O.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
Items 6 and 7 reflect new MDC values approved by CP&L Management as of August 15, 1991.
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO COMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 3623.00 136535.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 602.62 2565.94 87042.75
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 555.33 2496.33 82488.59
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
,00 i6. GROSS THERMAL ENERGY GEN. (MWH) 1319661.10 5946279.90 174069029.86
- 17. GROSS ELEC. ENERGY GEN. (MWH) 426565.00 1930840.00 56325979.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 410475.00 1868204.00 54017510.00 19 UNIT SERVICE FACTOR 74.64 68.90 60.42
- 20. UNIT AVAILABILITY FACTOR 74.64 68.90 60.42
- 22. UNIT CAP. FACTOR (USING DER NET) 67.20 62.81 48.19
- 23. UNIT FORCED OUTAGE RATE 25.36 31.10 13.71
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Revision 1, September 1991 1.16 - 9
-_