ML20082T475

From kanterella
Jump to navigation Jump to search
Forwards Prairie Island Nuclear Generating Plant Unit 1 Reactor Containment Bldg Integrated Leak Rate Test,June 1991. Test Conducted at Conclusion of Last Refueling Outage
ML20082T475
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 09/10/1991
From: Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082T478 List:
References
NUDOCS 9109190003
Download: ML20082T475 (1)


Text

.

4 Mf Nortisem States Power Company M4 Nicollet Mall Minneapohs, Minnesota 55401 1927 Telephone (612) 330 5500 September 10, 1991 10 CFR Part 50 Appendix J -

U S Nuclear Regulatory Commission Attn: Doewnent Control Desk r Washington, DC 20555 '

PRAIRIE ISTAND NUCLEAR GENERATING PLANT Docket Nos. 50 282 License Nos, DPR-42 50-306 DPR-60 Reactor Containment Bu11 ding Inte mpted Leak Rate Test Report Attached, for the information of the NRC Staff, is a sunanary technical report describing the integrated containment leakage test conducted on Prairio Island Nuclear Generating Plant Unit 1 at the conclusion of the last refueling outage.

This report is being submitted to meet the requirements of Appendix J to 10 CFR Part 50.

Please contact us if you have any questions related to the attached report.

D t w/ ,

Thomas M Parker Manager Nuclear Support Services c: Regional Administrator - Region III, NRC Senior Resident inspector, NRC NRR Project Manager, iiRC MFCA Attn: J V Ferman J E Silberg Attachment.

i 9109190003 910910 i POR ADOCK 0500028:2 -

- P PDR l*