Revised Monthly Operating Rept for Mar 1991 for Brunswick Units 1 & 2
ML20082T363
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/31/1991
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20082T291 List:
References
NUDOCS 9109180219
Download: ML20082T363 (2)


Text

_. _ _

._____..y y

+.

LCP&LtCD' PLANT PERFORMANCE DATA SYSTEM PAGE 1

1RUN DATE 09/04/91 OPERATING DATA REPORT RPD36-000 RUNETIME Li3;19ii4-BRUNSWICK -. UNIT : i DOCKET NO. 050-0325 COMPLETED DY RONALD RUMPLE OPERATING STATUS TELEPHONE (91'7)457-2752

1. UNIT NAME: DRUNSWICK UNIT i i NOTES - There are 560 fuel l
2. REPORTING PERIOD: MARCH Vi l bundles in the 11eactor core. Thorel 3.: LICENSED THERMAL-POWER-(MWT); 2436 I are 1090 BWR and 160 PWR spent l

~i -4.

NAMEPLATE-RATING (GRO9S MWE): 867. O~

l fuel bundlea in the Fuel Pool.

l

'5.

DESIGN = ELECTRICAL RAT 4NG (NET MWE); 821.0 i There are no fuel bundles in the l

'6'.

MAX DEPENDABLE CAPACITY (GROSS MWE) 191.0 1.new Fuel Storage Vault.

l 3

7. MAX DEPENDADLE CAPACITY (NET MWE)' 767.0

'8.

iF_ CHANGES OCCUR-.IN.CHPACITY-RATINGS-(ITEMS 3 THRU-7) SINCE LAST REPORT, GIVE REASONS:

Items 6 and 7 reflect new MDC values approved by CP&L management as of August 15, 1991.

"9..-POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE).

-10.

REASONS FOR_ RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE

-ATIVE

11. HOURS:IN HEPORTING PERIOD 744.00 2160.00 123048.00
12. NUMBER OF HOURS REACTOR CRITICAL 602.77 74~/.39 80049.55
13. REACTOR RESERVE SHUTDOWN-HRS.

.00

.00 1647.10 Li4L HOURS:. GENERATOR ON LINE 505.19 633.74 76496.98-i5.-UNIT RESERVE' SHUTDOWN: HOURS

.00

-.00

. 00 -

16.-GROSS THERMAL ENERGY. GEN. (MWH)

' i332400.41 1371553.75 16456'P 196. 93

-17.-GROSS ELEC;; ENERGY GEN._(MWH)-

437205.00; 440040.00

-53981515.00

18.-NET ELEC. ENERGY GENERATED-'(MWH) 422651.00-425077.00 51927471.00-

-19.-UNIT-SERVICE FACTOR 78.65 29.34 62.17

$0. UNIT AVAILnDILITY FACTOR:

70.65.-

29.34 62.17

=21. UNIT CAP.. FACTOR -(USING MDC NET)

-74.07-25.66 53.45 122.: UNIT CAP.' FACTOR..(USING DER NET) 69.19 23.97 51.40 L23.-UNIT _ FORCED 00TAGELRATE 21.35 20.04 15.00-12 4. SHUTDOWNS!SCHED. OVER NEXT 6 MON 1HS--(TYPE,-JDATE,.AND DURATION OF EACH)

25. IF SHUTDOWN AT END OF REPORT-PERIOD, ESTIMATED DATE OF-3 TART UP.

26.JUNITS IN TEST: STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED-INITIAL CRITICALITY-INITIAL ELECTRICITY-COMMERCIAL OPERATION lL Revision 1, September 1991 91091S02)9 910912 i.i6 - 9 e

[R ADOCK 0500o324-PDR

4 -,. -

(

CPAL to.

PLANT-' PERFORMANCE DATA SYSTEM PAGE 2

[ rut (DATE= 09/04/91-OPERATING DATA REPORT hPD36-000

'RUN TIME-13: 19:14 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED DY RONALD RUMPLE OPERATING STA*US TELEPHONE (9i9)457-2752 i.-UNIT NAME: URUNSWICK UNIf 2 i NOTES - There are 560 fuoi i

2i-REPORTING PERIOD:-HARCH 91 I bundlos in the Reactor Core. Therel

3. LICENSED THERMAL POWER (MWT). 2436 I are 1072 BWR and 144 PWR spent fuel
4. NAMEPLATE RATING (GPOSS tiWE )

867.0 l bundles in the Fuel Pool. There I

.5..-DESIGN ELECTRICAL RATING (NET MWE) 821.0 l are no fuel bundles in the new I

6.

riAX DEPENDABLE CAPACITY (GROSS MWE) 782.0 l Fuel Storage Vault.

I 7.-MAX DEPENDABLE CAPACITY (NET MWE)< 754.0

- B.

IF-CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

-Items 6 and 7 reflect new MDC values approved by CP&L Management as of August 15, 1991.

9., POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)i E10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE 1I. HOURS IN REPORTING PERIOD 744.00 2160.00 135072.00

' ' 12.: NUMBER 0F HOURS REArTOR CRITICAL 682.62 1963.32 86440.13 i3. REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00

.1441 HOURS GENERATOR ON LINE 678.42 1941.00 81933.26

- 15.? UNIT RESERVE SHUTDOWN' HOURS

.00

-. 00

.00-

--16.

GROSS THERMAL ENERGY GEN.-(MWH) 1636921.04 4626618.00 172749360.76 171 GROSS'ELEC. ENERGY GEN. (MWH) 535190.00 1512275.00 55899414.00-

18. NET ELEC. ENERGY GENERATED (MWH) 510112.00 1464470.00 53613776.00

! -19.oVNIT-SERVICE' FACTOR 91.19 89.06 60.66-

20. UNIT AVAILABILITY FACTOR 91.19 89.86 60.66

, ;21,, UNIT CAP.-FACTOR: (USING MDC NET) 92.36 89.92 50.28

.22.' UNIT' CAP. FACTOR-(USING DER NET) 84.82 02.50 48.35 23.-UNIT FORCED OUTAGE RATE 0.01 10.14 12.96 P 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH);

g 25.-IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

l (26'. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST - -ACHIEVED

.u-------

INITIAL CRITICAL-ITY l

L INITIAL ELECTRICITY COMMERCIAL OPERATION Revision 1, September 1991 1.16 - 9

.