Revised Monthly Operating Rept for Jul 1991 for Brunswick Units 1 & 2
ML20082T415
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/31/1991
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20082T291 List:
References
NUDOCS 9109180237
Download: ML20082T415 (2)


Text

.

~

CPAL CO PLANT PERFORMANCE DA1A SYSTEM PAGE i

. HUN DATE 09/04/91 UPERA11NG DATA REPORT RFD16-000 MUN TIME 13:19:25 DRUNSWICK UNIT i DOCKF1 NO. 050-0325 COMPLETED liY RUNALD RUMPLL OPERATING HTAluS 1ELEPHONE (91Y)457-275?

1.

IINIT NAME: DRUNSWICK UNIT 1 I NOT ES - There are 560 fuel i

2.

REPORTING PERIOD. JULY 91 lbundles in the Reactor Core. There 1 3.

LICENSED THERMAL. POWER (MWT) 2436 late 1090 nwn and 160 PWR spent l

4.

HAMEPLATC RATING (GROSS MWE) 067.O lfuel bundlen in the Fuel Pool.

I 5.

DESIGN ELECTRICAL RATING (NET MWE) 021,0 IThere are ro fuel bundles in the i

6.

MAX DEPENDA14LE CAPACITY (GROSS MWE) 791.0 Inew ruel storJige vault.

I 7.

MAX DEPENDADLE CAPACITY (NET MWE) 767.0 8.

iF CHANGEG OCCUR IN CAPACITY RATING 9 (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE kEASONS-Items 6 and 7 reflect new MDC values approved by CP&L Management as of August 15, 1991.

9 POWER LEVEL TO WHICH RESTRlCTED 1F ANY (NET MWE)

10. REASONS FOR RESTRILTTON IF ANY:

THIS YR 10 CUMUL MONTH DATE ATIVE 1i. HOURS IN REPORTING PERIOD 744.00 5087.00 125975.00

12. NUNDER OF HOURS REACTOR CRITICAL 590 75 2675.02 Hi977.98
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

14. HOURS GENERATOR ON LINE 562.42 2514.03 78370.07
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) i337545.24 5000073.i4 169085716.32
17. GROGG ELEC. ENERGY GEN. (MWH) 434050.00 1911040.00 55444515.00
10. NET ELEC. ENERGY GENERATED (MWH) 419347.00 1035002.00 53330274.00 19 UNIT SERVICE FACTOR 75.59 49.44 62.22
20. UNIT AVAILAltILITY FACTOR 75.59 49.44 62.22 21 UNIT CAP. FACTOR (USING MDC NET) 73.49 47.05 53.66
22. UNIT CAP. FACTOR (USING DER NET) 60.65 43.96 51.57
23. UNIT FORCED OUTAGE RAFE 24.41 32.39 15.73
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTH 5 (TYPE, DATE, AND DURA 110N OF EACH)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP
26. UNITS IN TEST STAlus (PRIOR TO COMMERCIAL OPERATION)

FORECAST ACHIEVED INITIAL CRITICALITY

- ~------

INITIAL ELECTRICITY COMMERCTAL OPERATION Revision 1, September 1991 9109190237 91093e

{DR ADOCK 05000524 1.16 - 9 IDR

d I

r,P6L UO-PLANT PERFORMANrt DATA SYSTEM PAGE 2

HUN DATE OV/04/91 OPERATING DATA REPOR1 DPD16-000 RUN TIME 13:19 25 DRUNSWICK UNIT ?

DOCKET NO. 050-0324 COMPLETED I4Y RONALD RUMI'lE OPERATTNG LTATUS IELEPHONE f9i9)457-?752 i NOIES - There are 560 f uol l

1.

UNIT NAME: DRUNSWICK UNIT

2. HifURTING FERIOD: JtlLY 91 lbundles in the Reactor Core. There 1 3.

LICENSED THERMAL POWER (MWT) 2436 late 1000 DWR and 144 PWR spent fuell 4.

NAMEPLAlt RATING (GHOSS MWE) 067.0 lbundles in the Puol Pool. There 1

5.

DESIGN ELECTRICAL RATING (NET MWE) 021.0 lare 40 fuel bundles in the new I

6.

MAX DEFENDAltLF. CAPACITY (GROSS MWE) 702.0 IPuol storage vault.

I 7.

liAX DEPENDAHLE CAPACITY (NET MWE) 754.0 d

O.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCF t.AST REPOHI, GIVE REASONS:

Items 6 and 7 reflect new MDC values approved by CPI.b Management as of August 15, 1991.

9.

POWER LEVEL TO WHICH RESTRICIED

1. F ANY (NET MWE)
10. REASONS FOR RESTRICTION IF ANY:

(

THIS YR 10 CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 744.00 50G~/.00 137999.00

12. NUMBER OF HOURS REACTOR CRITICAL 744.00 4029.94 00506.75
13. REACTOR RESERVE SHilTDOWN HRS

.00

.00

.00

14. HOURS GENERATOR ON LINE 744.00 3953.03 03946.09
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00 i6.

GROSS THERMAL ENERGY GEN. (MWHi 1770176.71 9427675.70 177550305.66 i 7.

GROSS ELEC. ENERGY GEN. (MWH) 559730.00 3044375.00 57431514.00 1U. NET ELEC. ENERGY r.ENERATED (MWH) 539620.00 2935200.00 55004506.00 i (?. UNIT SERVICE PACT 3R 100.00 77.72 60.03

20. UNIT AVAILAli1LITY F ACTOR 100.00 77.72 60.03
21. UNIT CAP. FACTOR (llSING MDC NET) 9 6. i '?

76.53 50.61

22. UNIT CAP. FACTOR (USING DER NET) 00.34 70.20 40.62
23. UNIT FORCED OUTAGE RATE

.00 22.27

-13.51

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START 'IP
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

FORECAS*

ACHIEVED INITIAL CRITICALITY


+

INITIAL ELECTRICITY COMMERCIAL OPERATION Revision 1, September 1991 i

1.16 - 9

)