Text
.
~
CPAL CO PLANT PERFORMANCE DA1A SYSTEM PAGE i
. HUN DATE 09/04/91 UPERA11NG DATA REPORT RFD16-000 MUN TIME 13:19:25 DRUNSWICK UNIT i DOCKF1 NO. 050-0325 COMPLETED liY RUNALD RUMPLL OPERATING HTAluS 1ELEPHONE (91Y)457-275?
1.
IINIT NAME: DRUNSWICK UNIT 1 I NOT ES - There are 560 fuel i
2.
REPORTING PERIOD. JULY 91 lbundles in the Reactor Core. There 1 3.
LICENSED THERMAL. POWER (MWT) 2436 late 1090 nwn and 160 PWR spent l
4.
HAMEPLATC RATING (GROSS MWE) 067.O lfuel bundlen in the Fuel Pool.
I 5.
DESIGN ELECTRICAL RATING (NET MWE) 021,0 IThere are ro fuel bundles in the i
6.
MAX DEPENDA14LE CAPACITY (GROSS MWE) 791.0 Inew ruel storJige vault.
I 7.
MAX DEPENDADLE CAPACITY (NET MWE) 767.0 8.
iF CHANGEG OCCUR IN CAPACITY RATING 9 (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE kEASONS-Items 6 and 7 reflect new MDC values approved by CP&L Management as of August 15, 1991.
9 POWER LEVEL TO WHICH RESTRlCTED 1F ANY (NET MWE)
- 10. REASONS FOR RESTRILTTON IF ANY:
THIS YR 10 CUMUL MONTH DATE ATIVE 1i. HOURS IN REPORTING PERIOD 744.00 5087.00 125975.00
- 12. NUNDER OF HOURS REACTOR CRITICAL 590 75 2675.02 Hi977.98
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE 562.42 2514.03 78370.07
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) i337545.24 5000073.i4 169085716.32
- 17. GROGG ELEC. ENERGY GEN. (MWH) 434050.00 1911040.00 55444515.00
- 10. NET ELEC. ENERGY GENERATED (MWH) 419347.00 1035002.00 53330274.00 19 UNIT SERVICE FACTOR 75.59 49.44 62.22
- 20. UNIT AVAILAltILITY FACTOR 75.59 49.44 62.22 21 UNIT CAP. FACTOR (USING MDC NET) 73.49 47.05 53.66
- 22. UNIT CAP. FACTOR (USING DER NET) 60.65 43.96 51.57
- 23. UNIT FORCED OUTAGE RAFE 24.41 32.39 15.73
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTH 5 (TYPE, DATE, AND DURA 110N OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP
- 26. UNITS IN TEST STAlus (PRIOR TO COMMERCIAL OPERATION)
FORECAST ACHIEVED INITIAL CRITICALITY
- ~------
INITIAL ELECTRICITY COMMERCTAL OPERATION Revision 1, September 1991 9109190237 91093e
{DR ADOCK 05000524 1.16 - 9 IDR
d I
r,P6L UO-PLANT PERFORMANrt DATA SYSTEM PAGE 2
HUN DATE OV/04/91 OPERATING DATA REPOR1 DPD16-000 RUN TIME 13:19 25 DRUNSWICK UNIT ?
DOCKET NO. 050-0324 COMPLETED I4Y RONALD RUMI'lE OPERATTNG LTATUS IELEPHONE f9i9)457-?752 i NOIES - There are 560 f uol l
1.
UNIT NAME: DRUNSWICK UNIT
- 2. HifURTING FERIOD: JtlLY 91 lbundles in the Reactor Core. There 1 3.
LICENSED THERMAL POWER (MWT) 2436 late 1000 DWR and 144 PWR spent fuell 4.
NAMEPLAlt RATING (GHOSS MWE) 067.0 lbundles in the Puol Pool. There 1
5.
DESIGN ELECTRICAL RATING (NET MWE) 021.0 lare 40 fuel bundles in the new I
6.
MAX DEFENDAltLF. CAPACITY (GROSS MWE) 702.0 IPuol storage vault.
I 7.
liAX DEPENDAHLE CAPACITY (NET MWE) 754.0 d
O.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCF t.AST REPOHI, GIVE REASONS:
Items 6 and 7 reflect new MDC values approved by CPI.b Management as of August 15, 1991.
9.
POWER LEVEL TO WHICH RESTRICIED
- 1. F ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
(
THIS YR 10 CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 744.00 50G~/.00 137999.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.00 4029.94 00506.75
- 13. REACTOR RESERVE SHilTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 744.00 3953.03 03946.09
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00 i6.
GROSS THERMAL ENERGY GEN. (MWHi 1770176.71 9427675.70 177550305.66 i 7.
GROSS ELEC. ENERGY GEN. (MWH) 559730.00 3044375.00 57431514.00 1U. NET ELEC. ENERGY r.ENERATED (MWH) 539620.00 2935200.00 55004506.00 i (?. UNIT SERVICE PACT 3R 100.00 77.72 60.03
- 20. UNIT AVAILAli1LITY F ACTOR 100.00 77.72 60.03
76.53 50.61
- 22. UNIT CAP. FACTOR (USING DER NET) 00.34 70.20 40.62
- 23. UNIT FORCED OUTAGE RATE
.00 22.27
-13.51
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START 'IP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORECAS*
ACHIEVED INITIAL CRITICALITY
+
INITIAL ELECTRICITY COMMERCIAL OPERATION Revision 1, September 1991 i
1.16 - 9
)