Revised Monthly Operating Rept for Apr 1991 for Brunswick Units 1 & 2
ML20082T369
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/30/1991
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20082T291 List:
References
NUDOCS 9109180222
Download: ML20082T369 (2)


Text

.s q i

CPAL CD- PLANT PERFORMANCE De SYSTEM PAGE 1 'i

'I AUN,DATE' 09/04/91 OPERATING DATA REPORT- RPD36-000

cRUN TIME 13:49:16- BRUNSWICK-UNIT 1 ,

DOCKET NO. 050-0325 COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752

1. UNIT.NAME' BRUNSWICK UNIT i i NOTES - There are 560 fuel i
2. REPORTING PERIOD:-APRIL - 9.1 l bundles in the Reactor Core. Therel ,
3. LICENSED THERMAL POWER (MWT) 2436 l are 1090 BWR and 160 PWR spent l
4. NAMEPLATE ~ RATING (GROSS MWE) 867.0  ; fuel bundles in the Puel Pool. 1

-5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l There are no fuel bundles in the 1 6.-MAX. DEPENDABLE CAPACITY-(GROSS MWE); 791.0 l new Fuel Storage Vault. -l

7. MAX DEPENDABLE CAPACITY (NET MWE) 767.0 --------~~~--------------------
8. IF-CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,

-GIVE REASONS

. Items 6 and 7 reflect new MDC values approved by CP&L Management as of August 15, 1991 9.-POWER LEVEL 1TO WHICH RESTRICTED IF ANY (NET MWE).

10._ REASONS-FOR RESTRICTION IF ANY:

THIS YR TO CUMUL 9 MONTH DATE ATIVE ii~.-HOURS-IN-REPORTING PERIOD 719.00 2879.00 123767.00 12.--; NUMBER.0F HOURS REACTOR CRITICAL .00 747.39 80049.55 13.-REACTOR RESERVE SHUTDOWN. HRS .00 .00 1647.10

-14.?-HOURS GENERATOR ON LINE - .00 433.74 76496.98-

15. UNIT RESERVE SHUTDOWN HOURS- .00 .00 .00-

' 16. GROSS-THERMAL ENERGY GEN. (MWH)

.00 1371553.75 164569196.93

17. GROSS ELEC.. ENERGY. GEN. (MWH) . 00 - 448040.00 53901515.00 18.= NET ELEC. ENERGY GENERATED (MWH) ~6996.00 418081.00 51920475.00 19./ UNIT' SERVICE FACTOR . .00 22.01 61.01 20.-UNITLAVAILABILITY FACTOR _ _

_ .00 22.01 61.81

21. UNIT CAP.. FACTOR (USING MDC NET) -1.27- 18.93 53.14
22. UNIT CAP.zrACTOR (USING DER NET)

~

-1.19 17.69 51.10

23. UNIT: FORCED OUTAGE RATE i00.00 58.07. 15.75

-24. SHUTDOWNS SCHED. OVER NEXT-6 MONTHS (TYPE, DATE, AND DURATION OF-EACH)-

25.-IF SHUTDOWN AT END'0F' REPORT' PERIOD, ESTIMATED DATE OF START UP-

~

26. UNITS'IN TF.ST STATUS (PRIOR TO COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY -------- ~~-'------

_ INITIAL ELECTRICITY -------- --~~~-~~

COMMERCIAL.0PERATION -------- - - - - - - - - -

Revision 1, September 1991 9109180222 910912 1.16 - 9 PDR -ADOCK 05000324 R- PDR

, _A CPAL CO . _

. PLANT PERFORMANCE DATA SYSTEM PAGE 2

RUM-DATE- 09/04/91 OPERATING DATA REPORT RPD36-000
Rur4 TIME 13:i9:16 DRUNSWICK' UNIT 2 DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE i--

_ OPER ATING ST ATliS TELEPHONE (919)457-2752 Ji. UNIT.NAME: BRUNSWICK UNIT 2 i NOIES - There are 560 f uel i 12._ REPORTING-PERIOD: APRIL 91 l bundles in the Reactor Core. Thorel-

3. LICENSED THERMAL POWER (MWT) 2436 l are 1072 BWR and 144 FWR st'ent i 4.-NAMEPLATE RATING (GROSS MWE) 867.0 l fuel bundles in the Fuel Pool. l.
5. DESIGN ELECTRICAL RATING (NEl MWE)- 821.0 l There are no fuel bundles in the l

'6. HAX DEPENDADLE CAPACITY (GROSS MWE) 702.0 l new Fuel Storage Vault. -l

.7.. MAX DEPENDABLE CAPACITY (NET MWE) 754.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

0.-IF CHANGES OCCUR'IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: '

- Items 6 and _7 reflect new MD(. .alues approved by CP&L Management as of August 15, 1991.

9.1 POWER LEVEL TO WHICH RESTRICTED IF ANY-(NET MWE):

10 REASONS FOR RESTRICTION IF ANY:

-THIS YR TO CUM llL MONTH DATE ATIVE

'i1.--HOURS IN REFORTING. PERIOD 759.00 2079.00 135791.00

12. NUNDER 0F HOURS REACTOR CRITICAL .00 1963.32 06440.13 s  : 13. REACTOR RESERVE' SHUTDOWN HRS .00 .00 .00

-14., HOURS. GENERATOR ON.LINE .00 1941.00 01933.26

-.15.-UNIT RESERVE: SHUTDOWN HOURS .00 .00 .00

16. GROSS 1HERMAL. ENERGY GEN. (MWH) .00 4626610.00 172749368.76 *

--i7.. GROSS _ELEC.-ENERGY GEN.-(MWH) _

.00 1512275.00 55099414.00

-10.' NET ELEC.-ENERGY-GENERATED-(MWH) -6741.00 1457729.00 53607035.00 19.-UNIT SERVICE FACTOR .00- 67.42 -60.34

, 120.-UNIT =AVAILADILITY FACTOR .00 67.42 .

-60.34 21.: UNIT: CAP. FACTOR.(USING MDC NET) -1.24 67.15 50.02

22. UNIT CAP. FACTOR (USING DER NET) -- i .1 4 - 61.47- -40.00

-23.-UNIT FORCED OUTAGE RATE 100.00 32.50 13.62 24.: SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)

25.--IF SHUTDOWN _AT END OF. REPORT PERIOD, ESTIMATED DATE OF START UP:

26.: UNITS IN TEST-STATUS (PRIOR TO COMMERC7AL OPERATION)+ F0ttECAST ACHIEVED

, INITIAL' CRITICALITY --- --- - - - - - - - - - -

INITIAL-ELECTRICITY- - ------ - - - - - - - -

COMMERCIAL OPERATION -------- ----- --

Revision 1, Sept 9mber 1991 1.16 - 9