Text
q
.s i
CPAL CD-PLANT PERFORMANCE De
SYSTEM PAGE 1
'i AUN,DATE' 09/04/91 OPERATING DATA REPORT-RPD36-000
- cRUN TIME 13:49:16-BRUNSWICK-UNIT 1 DOCKET NO. 050-0325 COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752
- 1. UNIT.NAME' BRUNSWICK UNIT i i NOTES - There are 560 fuel i
- 2. REPORTING PERIOD:-APRIL
- 9.1 l bundles in the Reactor Core. Therel
- 4. NAMEPLATE ~ RATING (GROSS MWE) 867.0
- fuel bundles in the Puel Pool.
1
-5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 l There are no fuel bundles in the 1
6.-MAX. DEPENDABLE CAPACITY-(GROSS MWE); 791.0 l new Fuel Storage Vault.
-l
- 7. MAX DEPENDABLE CAPACITY (NET MWE) 767.0
~~~--------------------
8.
IF-CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,
-GIVE REASONS
. Items 6 and 7 reflect new MDC values approved by CP&L Management as of August 15, 1991 9.-POWER LEVEL 1TO WHICH RESTRICTED IF ANY (NET MWE).
10._ REASONS-FOR RESTRICTION IF ANY:
THIS YR TO CUMUL 9
MONTH DATE ATIVE ii~.-HOURS-IN-REPORTING PERIOD 719.00 2879.00 123767.00 12.--; NUMBER.0F HOURS REACTOR CRITICAL
.00 747.39 80049.55 13.-REACTOR RESERVE SHUTDOWN. HRS
.00
.00 1647.10
-14.?-HOURS GENERATOR ON LINE -
.00 433.74 76496.98-
- 15. UNIT RESERVE SHUTDOWN HOURS-
.00
.00
.00-
' 16. GROSS-THERMAL ENERGY GEN. (MWH)
.00 1371553.75 164569196.93
- 17. GROSS ELEC.. ENERGY. GEN. (MWH)
. 00 -
448040.00 53901515.00 18.= NET ELEC. ENERGY GENERATED (MWH)
~6996.00 418081.00 51920475.00 19./ UNIT' SERVICE FACTOR.
.00 22.01 61.01 20.-UNITLAVAILABILITY FACTOR
-1.27-18.93 53.14
_.00 22.01 61.81
- 22. UNIT CAP.zrACTOR (USING DER NET)
-1.19 17.69 51.10
- 23. UNIT: FORCED OUTAGE RATE i00.00 58.07.
15.75
~
-24.
SHUTDOWNS SCHED. OVER NEXT-6 MONTHS (TYPE, DATE, AND DURATION OF-EACH)-
- 25.-IF SHUTDOWN AT END'0F' REPORT' PERIOD, ESTIMATED DATE OF START UP-
~
- 26. UNITS'IN TF.ST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORECAST ACHIEVED INITIAL CRITICALITY
~~-'------
_ INITIAL ELECTRICITY
--~~~-~~
COMMERCIAL.0PERATION Revision 1, September 1991 9109180222 910912 PDR -ADOCK 05000324 1.16 - 9 R-PDR
_A CPAL CO
. PLANT PERFORMANCE DATA SYSTEM PAGE 2
- RUM-DATE- 09/04/91 OPERATING DATA REPORT RPD36-000
- Rur4 TIME 13:i9:16 DRUNSWICK' UNIT 2 DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE
_ OPER ATING ST ATliS TELEPHONE (919)457-2752 i--
Ji. UNIT.NAME: BRUNSWICK UNIT 2 i NOIES - There are 560 f uel i
12._ REPORTING-PERIOD: APRIL 91 l bundles in the Reactor Core. Thorel-
- 3. LICENSED THERMAL POWER (MWT) 2436 l are 1072 BWR and 144 FWR st'ent i
4.-NAMEPLATE RATING (GROSS MWE) 867.0 l fuel bundles in the Fuel Pool.
l.
- 5. DESIGN ELECTRICAL RATING (NEl MWE)-
821.0 l There are no fuel bundles in the l
'6.
HAX DEPENDADLE CAPACITY (GROSS MWE) 702.0 l new Fuel Storage Vault.
-l
.7.. MAX DEPENDABLE CAPACITY (NET MWE) 754.0 0.-IF CHANGES OCCUR'IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- Items 6 and _7 reflect new MD(..alues approved by CP&L Management as of August 15, 1991.
9.1 POWER LEVEL TO WHICH RESTRICTED IF ANY-(NET MWE):
10 REASONS FOR RESTRICTION IF ANY:
-THIS YR TO CUM llL MONTH DATE ATIVE
'i1.--HOURS IN REFORTING. PERIOD 759.00 2079.00 135791.00
- 12. NUNDER 0F HOURS REACTOR CRITICAL
.00 1963.32 06440.13 s
- 13. REACTOR RESERVE' SHUTDOWN HRS
.00
.00
.00
-14., HOURS. GENERATOR ON.LINE
.00 1941.00 01933.26
-.15.-UNIT RESERVE: SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS 1HERMAL. ENERGY GEN. (MWH)
.00 4626610.00 172749368.76
--i7..
GROSS _ELEC.-ENERGY GEN.-(MWH) _
.00 1512275.00 55099414.00
-10.' NET ELEC.-ENERGY-GENERATED-(MWH)
-6741.00 1457729.00 53607035.00 19.-UNIT SERVICE FACTOR
.00-67.42
-60.34 120.-UNIT =AVAILADILITY FACTOR
.00 67.42
-60.34 21.: UNIT: CAP. FACTOR.(USING MDC NET)
-1.24 67.15 50.02
- 22. UNIT CAP. FACTOR (USING DER NET)
-- i.1 4 -
61.47-
-40.00
-23.-UNIT FORCED OUTAGE RATE 100.00 32.50 13.62 24.: SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 25.--IF SHUTDOWN _AT END OF. REPORT PERIOD, ESTIMATED DATE OF START UP:
26.: UNITS IN TEST-STATUS (PRIOR TO COMMERC7AL OPERATION)+ F0ttECAST ACHIEVED INITIAL' CRITICALITY INITIAL-ELECTRICITY-COMMERCIAL OPERATION Revision 1, Sept 9mber 1991 1.16 - 9
..