Revised Monthly Operating Repts for Feb 1991 for Brunswick Units 1 & 2
ML20082T352
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/28/1991
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20082T291 List:
References
NUDOCS 9109180216
Download: ML20082T352 (2)


Text

_ _.. _ _ _ _ _ _. _ _ _ _ _ _ _. _ _ _. _. _ _ -

4 m.:

lCPALCh PLANT PERFORMANCE-DATA SYSTEM PAGE-1

-RUN DATE 09/04/91 OPERATING DATA REPORT RPD36-000 RUN TIME- :13:19:12

-DRUNSWICK UNIT i D00KET NO. 050-0325 COMPLETED DY RONALD RUMPLE OPERATING STATUS IELEPHONE (919)457-2792 l'.

llNIT NAMEt DRUNSWICK UNIT i l NOTES - There are 560 fuel l

'2.

REPORTING ~ PERIOD: FEBRUARY 91

_l bundles in the Reactor Core. Thorel

'3.- LICENSED THERMAL POWER (MWT) 2436 l are 1090 11WR and 160 PWR spent l

4.'NAMEPLA1E RATING'(CROSS MWE). 067.0

_ l fuel bundles in the Puol Pool.

l

-:5s DESIGN ELECTRICAL = RATING (NET MWE). 821.0 1 There are no fuel bundles in the l'

-6.

MAX DEPENDADLE CAPACITY-(GROSS MWE)- 791.0 l now Puel Storage Vault.

l 7.

MAX DEPENDADLE CAPACITY-(NET MWE); 767.0-H.

IF. CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE'RFASONSi Items 6 and=7 reflect new MDC: values approved.by CP&L management an of August 15, 1991.

-9.

POWER 'Lf; VEL TO WHICH RESTRICTED IF ANY (NET MWE);

11 0.

REASONS f'OR RESTRICTION IF ANY:

THIS-YR TO

~

COMUL MUNTH DATE ATIVE li i.1 HOURS-- IN REPORTING lt'ERIOD 672.00 i416.00 122304.00

~

12. NUMBER OF HOURS REACTOR CRITICAL 144.62-144.62 79446.78
i3.-REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10-

-14.: HOURS-GENERATOR-ON LINE 48.55

-48.55-7591i.79

-15.

UNIT RESERVE' SHUTDOWN HOURS

.00

.00

.00 116'.cGROSS THERMAL. ENERGY, GEN. (MWH) 39153.34 39153.34 163236796.52--

"T170'GROSSLELEC. ENERGY-GEN. (MWH) 10755.00-10755.00 53544230.00-

18.. NET:ELEC. ENERGY GENERATED (MWH) 4H39.00 2426.00' 51504020.00

.1 9.. UNIT ~ SERVICE FACTOR

_.7.22 3.43

-62.07 j720;-LUNIT AVAILABILITY FACTOR 7.22 3.43 62.07 i= 21.-UNIT CAP. FACTOR-(USING MDC NET)

.94

.22 53.32-22.-UNITLCAP. FACTOR (USING DER NET)

.00

.21 51.29

[-23.-UNIT FORCED OUTAGE ~ RATE

. 00 -

.00

'15.03

24. SHUTDOWNS-SCHED. OVER NEXT_6 MONTHS -(TYPE, DATE, _AND DURATION OF-EACH) l!

1

)

'E25;LIF SHUTDOWN AT.END OF-REPORT PERIOD, ESTIMATED DATE OF. START UPJ 226. UNITS IN. TEST-STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST. ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICIT_Y COMMERCIAL OPERATTON Revision 1, September 1991 9109180216 910912

_POR ADOCK 05000324

1. i 6 - 9 R --

PDR

-~

.. - - ~. -

i j

bP&L'Cb PLANT PERFORMANCE _ DATA SYSTEM PAGE 2

RUN ' D A.TE : -' 09/04 /91 -

OPERATING-DATA-REPORT-RPD36-000

_RUNgTIMEJ 13 L19 : 12--

-BRUNSWICK UNIT 2 DOCKET NO.-050-0324 COMPLETED BY RONALD RUMPLE OPERATING' STATUS TELEPHONE (919)457-2752

_i._ UNIT NAME: BRUNSWICK UNIT 2 l NOTES - There are 560 fuel l

2._ REPORTING PERIOD: FEDRUARY 91 l bundles in the Reactor Core. Therel 3.LLICENSED THERMAL POWER (MWT). 2436 l are 1072 DWR and 144 PWR spent fuel 4.

NAMEPLATE PATING (GROSS MWE). 867.0 l bundles in the Fuel Pool. There 1

5.

DESIGN ELECTRICAL RATING (NET MWE) 821.0 l are no fuel bundles in the new l.

6. MAX DEPENDABLE CAPACITY (GROSS MWE). 782.0 l ruel storage-vault.

l 7.

MAX DEPENDABLE CAPACITY (NET MWE) 754.0 8.: IF CHANGES OCCUR :IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCF LAST REPORT, GIVE REASONS:

Items 6 and 7 reflect new MDC values approved by CP&L management as of August 15, 1991.

9-POWER 1 LEVEL' TO WHICH RESTRICTED IF ANY (NET MWE).

_-10.

REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

-11.

HOURS:IN. REPORTING PERIOD 672.00 1416.00 134328.00 12.~ NUMBER 0F HOURS REACTOR CRITICAL 672.00 1280.70 85757.51

'13.-REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00

14. HOURS. GENERATOR ON LINE_

672.00 1262.58 81254.84 115. UNIT RESERVE SHUTDOWN HOURS.

.00

.00

.00

.16.. GROSS THERMAL-ENERGY GEN.-(MWH) 160'/537.84 2989696;96 171i12446.92 11'7. GROSS ELEC. ENERGY-GEN.-(MWH) 526640.00-977085.00-55364224.00

'10,-NET ELEC. ENERGY GENERATED _(MWH) 511_164.00 946350.00 53095664.00 19.-UNIT SERVICE FACTOR 100.00 89.17 60.49 20.. UNIT AVAILABILIT_Y. FACTOR 100.00.

89.17

.60.49 21.UUNITfCAP. FACTOR (USING MDC NET) 100.88 88.64 50.06

22. UNIT-CAP.~ FACTOR-(USING DER NET) 92.65 81.40 48.14 23.-UNIT FORCED OUTAGE RATE

.00-10.83 12.99

24. SHUTDOWNS;SCHED.-0VER NEXT-6' MONTHS _(TYPE,_DATE,..AND DURATION OF EACH)-

l l'

25. IF SHUTDOWN AT END 0F' REPORT PERIOD, ESTIMATED DATE OF START UP L)26.lVNITS"IN-. TEST-STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL. ELECTRICITY COMMERCIAL OPERATION Revision 1, September 1991 1.16 - 9

__