Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080P775 + (ML20080P775)
- ML20080P778 + (ML20080P778)
- ML20080P783 + (ML20080P783)
- ML20080P784 + (ML20080P784)
- NRC-95-4410, Forwards Y-12 Technical Data Sheet 2.2.10, U-2 Molybdenum Alloy, in Response to RAI 210.121 of NRC + (ML20080P788)
- ML20080P789 + (ML20080P789)
- ML20080P793 + (ML20080P793)
- GO2-95-037, Forwards Summary Description of Proposed Vehicle Control Measures as Required by 10CFR73.55(c)(7) & Results of Vehicle Bomb Comparison as Required by 10CFR73.55(c)(8). Encl Withheld + (ML20080P794)
- ML20080P795 + (ML20080P795)
- ML20080P797 + (ML20080P797)
- ML20080P808 + (ML20080P808)
- ML20080P816 + (ML20080P816)
- ML20080P817 + (ML20080P817)
- ML20080P822 + (ML20080P822)
- ML20080P827 + (ML20080P827)
- ML20080P828 + (ML20080P828)
- ML20080P829 + (ML20080P829)
- ML20080P831 + (ML20080P831)
- ML20080P834 + (ML20080P834)
- BECO-84-029, Forwards Rev 1 to GE BWR Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6. Rev Corrects Error Noted on Page 13 Re Plant Response to MSIV Closure + (ML20080P838)
- ML20080P841 + (ML20080P841)
- ML20080P842 + (ML20080P842)
- 05000361/LER-1983-120-03, /03L-0:on 830829 & 31,flow Control Valve 2FV-0318 for Iodine Removal Sys Failed to Open & Declared Inoperable.Caused by Cracked O-ring Allowing High Pressure Oil to Leak to Low Pressure Side + (ML20080P844)
- 05000361/LER-1984-004, :on 840116,train a Containment Purge Isolation Sys Spuriously Actuated.Caused by Subgroup Relay Actuation Voltage Transient on ESF Bus.No Corrective Action Planned as Minor Transients Expected in Test + (ML20080P845)
- ML20080P847 + (ML20080P847)
- ML20080P848 + (ML20080P848)
- 05000361/LER-1983-075-03, /03L-0:on 830828,regulating Control Element Assembly Group 6 Exceeded Time Allowed for long-term steady-state Insertion Limit.Caused by Use of Assemblies to Control Axial Shape Index Oscillations + (ML20080P850)
- RA-95-0037, Forwards Summary of Description of Proposed Vehicle Control Measures & Vehicle Bomb Comparison.Encl Withheld + (ML20080P851)
- 05000443/LER-1994-019, :on 940124,voluntary LER for Electrical Relay Failures Occurred.Caused by Damaged Roller Bearings on Relay Coil Assembly.Replaced All Installed GE Hea Relays W/Electroswitch LOR-1 + (ML20080P852)
- 05000362/LER-1983-106-01, /01L-0:on 830907,surveillance Testing Resulted in Unsatisfactory Float Voltage for Pilot Cells 11 & 13 & Unsatisfactory Total Battery Terminal Voltage.Caused by Personnel Error + (ML20080P853)
- ML20080P855 + (ML20080P855)
- ML20080P858 + (ML20080P858)
- 0CAN098310, Forwards Updated Radiological Effluent Tech Specs & Offsite Dose Calculation Manual,Per 830510 Request.Implementation Date of 850101 Established + (ML20080P859)
- ML20080P864 + (ML20080P864)
- BECO-LTR-95-026, Submits FFD Program Performance Data for Period of 940701- 1231 + (ML20080P865)
- ML20080P869 + (ML20080P869)
- ML20080P871 + (ML20080P871)
- ML20080P872 + (ML20080P872)
- ML20080P874 + (ML20080P874)
- 05000334/LER-1995-002, :on 950130,SR 480 Volt Bus Found Seismically Unqualified.Caused by Improper Installation of Rear Mounting Anchor of MCC-E7 During Initial Const.Installed Seismically Qualified Tie Straps + (ML20080P876)
- ML20080P882 + (ML20080P882)
- ML20080P887 + (ML20080P887)
- ML20080P888 + (ML20080P888)
- ML20080P889 + (ML20080P889)
- ML20080P894 + (ML20080P894)
- ML20080P897 + (ML20080P897)
- ML20080P900 + (ML20080P900)
- ML20080P907 + (ML20080P907)
- ML20080P909 + (ML20080P909)
- ML20080P913 + (ML20080P913)
- ST-HL-AE-4999, Forwards Summary Description of Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.Encl Withheld + (ML20080P914)