Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080L040 + (ML20080L040)
- ML20080L042 + (ML20080L042)
- ML20080L045 + (ML20080L045)
- U-602412, Provides Info Updating Risks of Flammable & Toxic Hazards Associated W/Railroad Transportation Past Plant + (ML20080L047)
- 05000373/LER-1995-003-01, :on 950127,potential Traversing in-core Probe Containment Isolation Design Concern Noted.Interim Administrative Controls Put in Place to Ensure That Containment Isolation Function Not Compromised + (ML20080L057)
- ML20080L060 + (ML20080L060)
- BSEP-95-0110, Forwards Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld + (ML20080L063)
- ML20080L064 + (ML20080L064)
- ML20080L065 + (ML20080L065)
- ML20080L066 + (ML20080L066)
- ML20080L070 + (ML20080L070)
- RC-95-0048, Forwards Rev 1 to Cycle 9 Core Operating Limts Rept + (ML20080L073)
- ML20080L074 + (ML20080L074)
- GO2-83-859, Final Deficiency Rept,Condition 240 Re Loss of ESF Loads on Undervoltage Trip.Initially Reported on 830228.Sealed-in Circuit for Second Level Undervoltage Relays Deleted & Blocking Circuit Provided + (ML20080L080)
- 0CAN029506, Forwards Summary Description of Proposed Vehicle Control Measures as Required by 10CFR73.55(c)(7) & Results of Bomb Comparison as Required by 10CFR73.55(c)(8).Encl Withheld + (ML20080L081)
- ML20080L083 + (ML20080L083)
- ML20080L086 + (ML20080L086)
- ML20080L087 + (ML20080L087)
- AECM-83-0617, Requests Withdrawal of Item 31 Re safety-related Mechanical Snubbers Contained in Forwarding Proposed Changes to Tech Specs.Item Considered to Be Administrative Error + (ML20080L089)
- 05000339/LER-1983-067-03, /03L-0:on 830824,stub Bus Breaker H Failed to Open from Simulated Undervoltage Signal During Surveillance Testing.Caused by Incorrectly Wired Relay.New Relay Terminated Correctly + (ML20080L091)
- ML20080L092 + (ML20080L092)
- ML20080L095 + (ML20080L095)
- 05000339/LER-1983-068-03, /03L-0:on 830913,MOV-RS-200B Failed to Open During Stroke Time Test.Normally Closed Torque Switch Contacts in Valve Operator Found Open.Contacts Cleaned & Adjusted.W/ + (ML20080L098)
- ML20080L104 + (ML20080L104)
- LIC-95-0053, Annual Occupational Exposure Rept for 1994 + (ML20080L107)
- ML20080L108 + (ML20080L108)
- ML20080L113 + (ML20080L113)
- ML20080L120 + (ML20080L120)
- ML20080L121 + (ML20080L121)
- ML20080L125 + (ML20080L125)
- ML20080L126 + (ML20080L126)
- ML20080L129 + (ML20080L129)
- ML20080L130 + (ML20080L130)
- TXX-9500, Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified + (ML20080L139)
- 05000261/LER-1983-023-01, /01T-0:on 830905,primary to Secondary Leak in Steam Generator a Progressed Beyond Specs.Caused by Two Leaking Tubes & Contractor Error.Tubes Mechanically Plugged. Contractor Procedures Under Review + (ML20080L140)
- ML20080L146 + (ML20080L146)
- 05000370/LER-1983-042-03, /03L-0:on 830823,fire Barrier Penetration Between Turbine Bldg 739-ft Elevation & Auxiliary Bldg Switchgear Room Found open.Six-inch Pipe Used to Seal Penetration Missing.Cause Unknown + (ML20080L150)
- 05000324/LER-1983-083, Updated LER 83-083/01T-1:on 830905,supply Valve 2-FP-V39 to Deluge Sys of Both Standby Gas Treatment Sys Discovered Shut.Caused by Operator Error.Valves Tagged for Identification.Auxiliary Operator Disciplined + (ML20080L152)
- ML20080L156 + (ML20080L156)
- ML20080L158 + (ML20080L158)
- 05000395/LER-1983-101-03, /03L-0:on 830902,component Cooling Sys Snubber CCH-082 Exceeded Alignment Limit by 6 Degrees.Caused by Loose Clamp.Clamp Realigned + (ML20080L165)
- ML20080L166 + (ML20080L166)
- 05000272/LER-1983-037-03, /03L-0:on 830821,mechanical Repairman Inadvertently Loosened Flanges on Outlet Valve 11 of Boric Acid Storage Tank.Flanges Retightened.Leakage Stopped + (ML20080L168)
- ML20080L180 + (ML20080L180)
- ML20080L192 + (ML20080L192)
- ML20080L195 + (ML20080L195)
- ML20080L197 + (ML20080L197)
- 05000254/LER-1995-003-02, :on 950125,determined That TIP Sys Pci Ball Valves on Units 1 & 2 Outside Design Basis Due to Incomplete Review of Sys Circuitry.Mod to Unit 2 TIP Sys Will Be Installed During Next Unit 2 Refueling Outage + (ML20080L202)
- ML20080L204 + (ML20080L204)
- ML20080L205 + (ML20080L205)
- RBG-15-982, Interim Deficiency Rept DR-92.Investigation Incomplete.Next Rept Will Be Provided by 831208 + (ML20080L209)