ML20080L074
| ML20080L074 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/23/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-27686-BSK, DER-83-14, NUDOCS 8309300059 | |
| Download: ML20080L074 (2) | |
Text
-
Arizona Public Service Company P o DOx N4
- PHOE N' X ARiZON A Sf>036 August 23, 1983 ANPP-27686-BSK/RQT CORRECTED COPY
- U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Time Extension for Report - DER 83-14 A 50.55(e) Potentially Reportable Deficiency Relating to Diesel Generator Protective Relays By Westinghouse Failed Due To Leaking Capacitors File:
83-019-026; D.4.33.2 Re fere nc e : (A)
Telephone Conversation between A. D'Angelo and R. Tucker on March 16, 1983 (B)
ANPP-23504, dated April 14, 1963 (Interim Report)
(C)
ANPP-24003, dated June 8, 1983 (Time Extension) i
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 31, 1983.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalired by November 18, 1983, a t which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours
{
8309300059 830823 APS Vice President, PDR ADOCK 05000528 Nuclear Projects Management S
PDR ANPP Project Director EEVBJr./RQT:sn ec: See Attached Page Two
- Date in second paragraph corrected from November 18, 1984 to November 18, 1983.
j$0Y
e U. S. Nuclear Regulatory Comnission DER 83-14 4
Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel j
i D. B. Fasnacht i
A. C. Rogers B. S. Kaplan W. E. Ide J. Vo ree s J. R. Bynum P. P. Klute/D. D. Green i
A. C. Gehr W. J. Stubblefield W. G. Bingham
]
R. L. Patterson R. W. Welcher R. M. Grant 4
D. R. Hawkinson L. E. Vorderbrueggen C. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 l
l
..