MONTHYEARML20217M3801999-10-21021 October 1999 Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam ML20210H0861999-07-28028 July 1999 Forwards Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted.Licensee Conduct at Monticello Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML18107A7051999-07-20020 July 1999 Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML20212H3191999-07-16016 July 1999 Forwards Aug 1999 Monticello RO Exam Package,Including Revised Outlines.All Changes Are in Blue Font ML20209G5621999-07-14014 July 1999 Forwards Insp Rept 50-263/99-11 on 990621-24.No Violations Noted.Objective of Insp,To Determine Whether Monticello Nuclear Generating Station Emergency Plan Adequate & If Station Personnel Properly Implemented Emergency Plan ML20196J5351999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950515 & NSP Responses & 980917 for Monticello Npp.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209B6151999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Y2K Readiness Disclosure Attached ML20196H2291999-06-24024 June 1999 Responds to Administrative Ltr 99-02,dtd 990603,requesting Licensee to Provide Estimate of Licensing Action Submittals Anticipated.Four New Submittals Per Year Are Anticipated ML20207D5851999-05-25025 May 1999 Submits Info Re Partial Fulfillment of License Conditions Placed on Amend 101,which Approved Use of Ten Exceptions for 24 Months Subject to Listed App C Conditions.Util Will Submit Second Rept to Obtain Approval for Continued Use ML20206S0911999-05-17017 May 1999 Forwards Response to NRC 990324 RAI Re Proposed Amend to pressure-temp Limits & Surveillance Capsule Withdrawal Schedule, .Supporting Calculations Also Encl ML20206N5601999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Monticello Npp.Organization Chart Encl ML20206G2181999-05-0505 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Dtd 960110,for Plant ML20206G4901999-05-0404 May 1999 Forwards Staff Review of Licensee 960508 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Sf,Over Fuel in Rc or Over Safety-Related Equipment, .Overall, Responses Acceptable.Tac M95610 Closed ML20206G7741999-05-0303 May 1999 Forwards Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206D1651999-04-27027 April 1999 Forwards Radiation Environ Monitoring Program for MNGP for Jan-Dec 1998, Per Plant TS 6.7.C.1.Ltr Contains No New NRC Commitments or Modifies Any Prior Commitments ML20205N0821999-04-12012 April 1999 Forwards SE of NSP Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Licensee Adequately Addressed Actions Requested in GL ML20205N4811999-04-0909 April 1999 Forwards Licensing Requalification Insp Rept 50-263/99-10 on 990308-12.No Violations Noted.However,Inspectors Through Observation of Simulator Scenario Exams Noted Difficulties in Ability of SM to Simultaneously Implement Duties of SM ML20205N5301999-04-0909 April 1999 Discusses Arrangements Made on 990406 for Administration of Licensing Exams at Monticello Nuclear Generating Station During Wk of 990823.Requests That Exam Outlines Be Submitted by 990128 & Supporting Ref Matls by 990719 ML20196K7831999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) ML20205H5731999-03-29029 March 1999 Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20205C4851999-03-26026 March 1999 Informs That on 990203,NRC Staff Completed PPR of Nuclear Plant.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205C6561999-03-26026 March 1999 Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS ML20205A5881999-03-24024 March 1999 Forwards Request for Addl Info Re Submittal Requesting Rev of pressure-temperature Limits & Surveillance Capsule Withdrawal Schedule ML20204H4711999-03-18018 March 1999 Forwards SER Concluding That Util Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello & Adequately Addressed Actions Requested in GL 96-05 ML20207H5161999-03-11011 March 1999 Forwards Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted ML20207F4091999-02-28028 February 1999 Forwards Fitness for Duty Program Performance Data for Six Month Period from 980701-981231,IAW 10CFR26.71 ML20207F6741999-02-24024 February 1999 Forwards Summary of Nuclear Property Insurance Maintained at Monticello & Prairie Island Nuclear Generating Plants ML20207F6901999-02-23023 February 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 980701-981231, Off-Site Radiation Dose Assessment for 980101-981231 & Revised Effluent & Waste Disposal Semi- Annual Rept for 980101-980630, for Monticello ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML18107A7051999-07-20020 July 1999 Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML20212H3191999-07-16016 July 1999 Forwards Aug 1999 Monticello RO Exam Package,Including Revised Outlines.All Changes Are in Blue Font ML20209B6151999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Y2K Readiness Disclosure Attached ML20196H2291999-06-24024 June 1999 Responds to Administrative Ltr 99-02,dtd 990603,requesting Licensee to Provide Estimate of Licensing Action Submittals Anticipated.Four New Submittals Per Year Are Anticipated ML20207D5851999-05-25025 May 1999 Submits Info Re Partial Fulfillment of License Conditions Placed on Amend 101,which Approved Use of Ten Exceptions for 24 Months Subject to Listed App C Conditions.Util Will Submit Second Rept to Obtain Approval for Continued Use ML20206S0911999-05-17017 May 1999 Forwards Response to NRC 990324 RAI Re Proposed Amend to pressure-temp Limits & Surveillance Capsule Withdrawal Schedule, .Supporting Calculations Also Encl ML20206D1651999-04-27027 April 1999 Forwards Radiation Environ Monitoring Program for MNGP for Jan-Dec 1998, Per Plant TS 6.7.C.1.Ltr Contains No New NRC Commitments or Modifies Any Prior Commitments ML20196K7831999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) ML20205H5731999-03-29029 March 1999 Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20205C6561999-03-26026 March 1999 Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS ML20207F4091999-02-28028 February 1999 Forwards Fitness for Duty Program Performance Data for Six Month Period from 980701-981231,IAW 10CFR26.71 ML20207F6741999-02-24024 February 1999 Forwards Summary of Nuclear Property Insurance Maintained at Monticello & Prairie Island Nuclear Generating Plants ML20207F6901999-02-23023 February 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 980701-981231, Off-Site Radiation Dose Assessment for 980101-981231 & Revised Effluent & Waste Disposal Semi- Annual Rept for 980101-980630, for Monticello ML20203A3081999-01-28028 January 1999 Forwards TS Page 60d,as Supplement 3 to 971125 LAR Re CST Low Level Hpci/Rcic Suction Transfer.Page Includes NRC Approved Amend 103 Changes for Use by NRC in Issuing SER ML20202F7821999-01-27027 January 1999 Forwards 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(vi).Ltr Contains No New Commitments or Modifies Any Prior Commitments ML20206S0331999-01-20020 January 1999 Submits Annual Rept of Safety & Relief Valves Failure & Challenges ML20206P1221998-12-31031 December 1998 Forwards LAR for License DPR-22,revising TS pressure-temp Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4, Deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR ML20198M3271998-12-28028 December 1998 Submits Change to Commitment for Submittal of ITS Application.Util Plans to Provide ITS Conversion Package Submittal to NRC in Dec of 2000 ML20198J7511998-12-22022 December 1998 Informs of Completion of Listed Commitment Made in Re Severe Accident Mgt. Severe Accident Mgt Guidelines Have Been Assessed,Plant Procedures Have Been Modified & Training of Affected Plant Staff Has Been Completed ML20198J4311998-12-21021 December 1998 Forwards Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv. Under Separate Cover,Licensee Is Providing LAR to Revise Curves ML20198J7711998-12-14014 December 1998 Documents 981214 Discussion with NRC Staff Re Deviation from Emergency Procedure Guidelines ML20195C8781998-11-11011 November 1998 Forwards Supplement to 971125 License Amend Request Re Condensate Storage Tank Low Level Suction Transfer Setpoints for HPCI Sys & Reactor Core Isolation Cooling Sys ML20195C9631998-11-11011 November 1998 Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment ML20195E2261998-11-10010 November 1998 Submits Suppl 1 to Util Response to NRC Request for Addl Info Re 981118 Request for Deviation from Emergency Procedure Guidelines ML20155H6591998-11-0404 November 1998 Forwards Response to 980910 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20155F9091998-10-27027 October 1998 Forwards Master Table of Contents to Rev 16 of Usar.Info Was Inadvertantly Omitted at Time of 981023 Submittal 05000263/LER-1998-005, Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed1998-10-21021 October 1998 Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed ML20154L9321998-10-12012 October 1998 Forwards Suppl 2 to LAR & Suppl 980319,which Proposed Changes to Ts,App a of Operating License DPR-22 for Mngp.Number of Addl Typos & One Title Change on Pages Associated with Amend Request Have Been Identified 05000263/LER-1998-004, Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment1998-10-0909 October 1998 Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment ML20154L8671998-10-0909 October 1998 Forwards Suppl 1 to LAR for License DPR-22, Replacing Exhibits B & C of Original Submittal to Reflect Item 2 & Subsequent Changes.Request for APRM Flow Converter Calibr Interval Extension,Withdrawn ML20154J6201998-10-0505 October 1998 Forwards Rev 49 to Monticello Security Plan.Encl Withheld, Per 10CFR73.21 ML20153F5351998-09-25025 September 1998 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Improved TS ML20153F0051998-09-25025 September 1998 Forwards Suppl 1 to 971031 Application for Amend to License DPR-22,replacing Exhibit C Which Contains TS Pages Incorporating Proposed Changes Described in Original 971031 Request ML20153D8561998-09-17017 September 1998 Forwards Rev 17 to EPIP A.2-414, Large Vol Liquid Sample &/ or Dissolved Gas Sample Obtained at Post Accident Sampling Sys. Superseded Procedures Should Be Destroyed.Ltr Contains No New NRC Commitments,Nor Does It Modify Prior Commitments ML20153D1441998-09-17017 September 1998 Informs NRC That Listed Commitments 1 & 3 Were Completed by End of 1998 Refueling Outage.Commitments Involved Final Disposition of Remaining Outlier Components Re All Known Outstanding Work Associated with GL 87-02,Suppl 1,USI A-46 ML20153E0331998-09-17017 September 1998 Forwards Response to NRC 980629 RAI Re RPV Weld Chemistry Values Previously Submitted as Part of Plant Licensing Basis.Next Monticello RPV Sample Capsule Scheduled to Be Removed During 1999/2000 Refueling Outage ML20153E9011998-09-0909 September 1998 Forwards Rev 1 to MNGP Colr,Cycle 19, Incorporating Changes to power-flow Maps in Figures 6 & 7.Changes Made to Correct Errors in Stability Exclusion Region & Stability Buffer Region Shown on Rev 0 ML20151S7401998-08-28028 August 1998 Responds to NRC Re Violations Noted in Insp Rept 50-263/98-09.Corrective Actions:Procedure 4 AWI-04.04.03 Will Be Revised to Eliminate Term Urgent from Section 4.3.1.D ML20238E8201998-08-26026 August 1998 Forwards Effluent & Waste Disposal Semi-Annual Rept for Jan-June 1998 & Revised Effluent & Waste Disposal Semi- Annual for Jul-Dec 1997. Ltr Contains No New NRC Commitments,Nor Does It Modify Any Prior Commitments ML20237E9741998-08-26026 August 1998 Forwards Rev 4 to EWI-09.04.01, Inservice Testing Program. Rev of Inservice Testing Program Reflects Valves Added as Result of Component Mods Recently Performed ML20237E6821998-08-25025 August 1998 Forwards fitness-for-duty Program Performance Data for Six Months Period Ending 980630 1999-09-09
[Table view] |
Text
. I y ___ _
Montcello Nuclear Generating Plant 2807 West Hwy 75 1
j Monticello, Minnesota 55362-9637 l
i SAFEGUARDS INFORMATION I February 23, 1995 .10 CFR Part 73.55(c)
- Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission
- Attn Document Control Desk i Washington, DC 20555 i MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22
. Submittal of Vehicle Barrier Svetem Summary Description 4 i Effective August 31, 1994 the NRC amended its physical protection regulations !
i for operating nuclear power reactors. The amendments modify the design basis l threat of radiological sabotage to include the use of a land vehicle by adversaries for transporting personnel and their hand-carried equipment to the proximity of vital areas and to include a land vehicle bomb. The amendments also
- require the installation of vehicle control measures, including vehicle barrier systems, to protect against the malevolent use of a land vehicle.
The purpose of this letter is to transmit the enclosed summary description of 4
the Monticello vehicle barrier system (VBS) as required by 10CFR73.55(c)(9)(1).
Additionally, this letter confirms that the Monticello VBS design will fully meet the requirements of 10CFR73.55(c)(7) and (c)(8)(1) and that the VBS will be installed by February 29, 1996 as required by 10CFR73.55(c)(9)(ii).
The enclosure contains safeguards information which should not be placed in the i Public Document RoJm. If you have any questions or comments please call Hel Opstad on 612-295-1653.
When Separated from Enclosure Attachments 1&2. i j, f g,, Handle This Document as Decontrolled Roger O Anderscr.
, Director
- Licensing and Management Issues g Enclosure - Summary Description Monticello Vehicle Barrier System
- 40
14NQ NOL
- 88 nn SAFEGUARDS INFORMATION O' O DM N c (with Safeguards Attachment)
Security Superintendent, Monticello O ) .$
ti c: (without Safeguards Attachtaent) N /
o att Manager Corporate Security Regional Administrator - NRC, III
.A <
l NRR Project Manager, NRC Sr Resident Inspector, NRC se. c . _ _ .. ammeusemes_ sus.mn p*
i l
- t. 1 j
i i I ENCLOSURE
! February 23, 1995 !
! Page 1 of 5 l l SAFEGUARDS INFORMATION i
l l
j
SUMMARY
DESCRIPTION l
MONTICELLO l 1
i VEHICLE BARRIER SYSTEM l
l l
1 i
i _
l When Separated from Enclosure Attachments 1&2, Handle This Document as Decontrolled i
! SAFEGUARDS INFORMATION l
i
l i
b l
ENCLOSURE February 24, 1995 Page 2 of 5 SAFEGUARDS INFORMATION EXECUTIVE SUDMARY The vehicle barrier system (VBS) design for the Monticello Nuclear Generating j Plant will fully meet the requirements of 10CFR73.55(c)(7) and (c)(8)(1). The i VBS is comprised of active and passive barriers. The Mississippi river and j existing buildings serve as portions of the passive barrier.
PASSIVE BARRIERS The passive barrier system will use a combination of the following ,
\
l
- 1. Jersey Barriers installed to meet the design requirements of NUREG/CR-6190 Volume 2, Revision 1 or Super Barriers to meet the requirements of CPU Nuclear drawing 3E-SK-S-107 as approved by the NRC letter to NEI dated February 16, 1995. (NSP is aware the NRC is currently re-evaluating the Jersey Barrier design described in Revision 1 due to questions concerning the ability of the barrier to stop the design basis vehicle at approach angles greater than 25 degrees.)
i 2. Bollard / Cable barriers installed to meet the requirements of the j l alternate cable design as submitted by Sargent and Lundy G ,
Southern Company Services and approved by the NRC letter to NEI l dated 1-25-95. The Bollard / Cable barriers will be installed at I locations outside the calculated (safe) stand-off distances to allow for vehicle penetration which varies from approximately 8 feet to 27 feet depending on the number of cables used and the bollard spacing. There is no portion of the VBS where the penetration would be within the calculated (safe) standoff distance.
- 3. The Mississippi River and two existing plant buildings.
The VBS will utilize the Mississippi River on the north side of the plant as a
" natural" passive barrier.
Warehouse No. 5 on the southeast corner and the guardhouse on the south will also serve as part of the passive barrier.
The location of the proposed VBS is shown on Attachment 2. This figure shows a general layout of the Bollard /Cabic and Jersey Barrier system being used at l
Monticello. The proposed passive barriers will be located a minimum of 8 feet outside the existing outer protected area fence. The final location of the barriers may vary slightly from what is shown on Attachment 2, however, the requirements of NUREG/CR-6190 Volume 1, Revision 1 and Volume 2, Revision 1 will be met.
When Separated from Enclosure Attachments 1&2.
Handle This Document as Decontrolled SAFEGUARDS INFORMATION
ENCLOSURE !
February 24, 1995 i Page 3 of 5 SAFEGUARDS INFORMATION l
J Removable Passive Barriers to Allow infrecuent Access l Removable Jersey Barriers or Super Barriers in-line with the I Bollard / Cable barriers will be installed in three locations to allow infrequent access for maintenance vehicles. The design of these access points will meet the requirements of NUREG/CR-6190 Volume 2, Revision 1 or the GPU Nuclear drawing 3E-SK-S-107. These access points will be located:
- on the river service road on the north side of the site
- north of Warehouse No 5 on the east side of the site
- on the west side of the site ACTIVE BARRIERS Main North / South Vehicle Gate The existing main outer vehicle gate will be removed and replaced with a ;
DELTA model Sc3000S power operated cantilever gate. The manufacturer has !
provided a certificate of conformance stating the SC3000s gate will stop :
l a vehicle which is within the weight and velocity characteristics as defined in the NUREG/CR-6190 Volume 2, Revision 1, Section 3.3 and will meet or exceed the maximum parameters of the design basis vehicle threat and protection criteria found in Regulatory Guide 5.68.
Secondarv Vehicle Gates The secondary East / West vehicle gate, the Turbine Building railroad access gate, and Reactor Building railroad access gate will be DELTA Model TT212E manual lift gates. The manufacturer has provided a certificate of Conformance stating the TT212E gate will stop a vehicle which is within the weight and velocity characteristics as defined in the NUREG/CR-6190 Volume 2, Revision 1, Section 3.3 and will meet or exceed the maximum parameters of the design basis vehicle threat and protection criteria found in Regulatory Guide 5.68.
LAND VEHICLE BOMB COMPARISON In accordance with the guidelines of NUREG/CR-6190 volume 1, Revision 1, the minimum safe stand-off distances between the buildings housing vital equipment and the design basis bomb threat were determined for the Monticello Nuclear Generating Plant. The table in Attachment 1 shows the results of this analysis.
When Separated from Enclosure Attaciments 1&2, Handle This Document as Decontrolled SAFEGUARDS INFORMATION
i 1
l I
ENCLOSURE February 23, 1995 Page 4 of 5. l SAFEGUARDS INFORMATION :
l i
i Attachment 1, lists the affected plant vital area buildings, exterior wall ;
construction characteristics and the calculated (safe) stand-off distances. 1 All vital equipment required for safe shutdown is protected by buildings or enclosures capable of withstanding an impact from a tornado missile. The calculated (safe) stand-off distances are either the minimum safe stand-off distance from the tables included in NUREG/CR-6190 Volume 1, Revision 1, or the actual plant stand-off distances which were verified as acceptable using the FACEDAP computer program.
The bomb comparison analysis shows that the building walls, together with the actual stand-off distance (which is in all cases greater than the calculated i I
safe stand-off distance), will provide acceptable protection for the systems and components contained within the buildings against the effects of a design basis bomb at the proposed vehicle barrier.
l l
l i
1
)
When Separated from Enclosure Attachments 1&2, Handle This Document as Decontrolled SAFEGUARDS INFORMATION
ENCLOSURE February 23, 1995 Page 5 of 5 SAFEGUARDS INFORMATION ATTACHMENTS:
- 1. Attachment 1, Table showing calculated (safe) stand-off distances to each vital area building, minimum actual distances from the proposed VBS to the various vital area buildings, and wall thickness / reinforcement information.
- 2. Attachment 2, Site Plan showing location and type of proposed vehicle barriers, location of vital area buildings, and the minimum actual distance from vital area buildings to the proposed VBS. General location and type of proposed active barriers are also shown on this drawing. l l
REFERENCES:
- 1. Final rule revising 10 CFR Part 73 " Protection Against Malevolent Use of Vehicles at Nuclea:- Power Plants" as published in the Federal Register )
Vol. 59 No. 146 Monday August 1, 1994.
- 2. Letter dated July 21, 1994 from Ledyard B. Marsh, U.S. NRC, to Roger O. ]
Anderson, NSP Co. titled " Characteristics of Design Basis Vehicle".
- 3. Reg Guide 5.68 dated August 1994 " Protection Against Malevolent Use of Vehicles at Nuclear Power Plants".
- 4. NUREG/CR-6190 " Protection Against Malevolent Use of Vehicles at Nuclear Power Plants, Vehicle Barrier System Siting Guidance for Blast Protection" Volume 1, Revision 1 (published 12/1/94).
- 5. NUREG/CR-6190 " Protection Against Malevolent Use of Vehicles at Nuclear I Power Plants, Vehicle Barrier System Selection Guidance" Volume 2, Revision 1 (published 12/1/94).
- 6. NEI letter dated February 16, 1995 to NEI Administrative Points of Contact titled " Supplemental Information on the Use of the Jersey Barrier Design of NUREG/CR-6190, Vol. 2, Rev. 1, to Heat Security Requirements to Protect Against Malevolent Use of Vehicles." (It is noted that this letter transmitted the February 16, 1995 letter from the NRC to NEI that approved the Super Barrier design as given in GPU Nuclear drawing 3E-SK-S-170.)
- 7. NEI letter dated January 26, 1995 to Attendees NEI Workshop on Barriers (December 6-7, 1994) titled " Supplemental Passive Barrier System Designs to Meet Security Requirements to Protect Against Malevolent Use of Vehicles." (It is noted that this letter transmitted the January 25, 1995 letter from '.he NRC to NEI that approved the alternate cable design for the Bollard / Cable barrier as submitted by Sargent and Lundy &
Southern company Services.)
When Separated from Enclosure Attachments 1&2, Handle This Document as Decontrolled SAFEGUARDS INFORMATION