Response to Suffolk County Motion for Reconsideration of ASLB 840202 Order Re Submission of Discovery Requests.Order Should Be Modified to Identify Party & Nonparty Witnesses. Certificate of Svc Encl
ML20080L126
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 02/11/1984
From: Twana Ellis
HUNTON & WILLIAMS, LONG ISLAND LIGHTING CO.
To:
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OL, NUDOCS 8402160254
Download: ML20080L126 (20)


Text

-

y ,

LILCO, February 11, 1984 00CkE E0 U .' :i:

E' 73 fj0 :4}

UNITED STATES OF AMERICA NUCLEAR. REGULATORY COMMISSION , - . - . , ..

Before the Atomic Safety and Licensing Board In the Matter of )

)

LONG ISLAND LIGHTING COMPANY ~

) Docket No. 50-322 (OL)

)

(Shoreham Nuclear Power Station, )

Unit 1) )

LILCO'S RESPONSE TO THE COUNTY'S MCTION FOR RECONSIDERATION OF BOARD ORDER DATED FEBRUARY 2, 1984 LILCO welcomes and supports the Board's February 2, 1984 Order. LILCO firmly believes that submission of specific document discovery requests in advance of the February 22, 1984 conference will materially assist the efficiency of the hear-

' .ing. More particularly, submission of discovery requests on February 17, as required in the Order, promotes efficiency be-cause:

1. It provides the Board with concrete and-important information concerning the po-tential scope of the County's proposed con-s tentions, Review of these requests will aid

-the Board in determining whether the County's proposed contentions are excessively broad, as LILCO contends, or whether they are suffi-ciently particularized to result in efficient and focused hearings. Review of the parties'

-document requeses will also aid the Board in revising or rewriting any of the contentions should it choose to do so.

~

8402160254 840211

' PDR O ADOCK 05000322 N/

PDR. .

c

.. .. .. . . _ .-- - - =. - . - -- .

.c

2. .It will help the Board identify and l simplify the issues at the February 22, 1984 conference. See 10 CFR $ 2.718(h).
3. It redaces the potential for future discovery disputes by permitting the Board to

~

issue discovery guidance at the time it rules on the admissibility of the County's proposed contentions or issues its own revised ver-sions of the contentions. Discovery guidance based on a review of the parties' proposed requests will help focus discovery efforts, thereby conserving the time and resources of 6 the Board and parties. The time and effort

- spent now by the parties,in preparing these discovery requests will be more than offset by time and effort saved later from the avoidance of future discovery disputes. See 4 10~CFR $ 2.718(e).

4. It permits' discovery, if appropri- '

ate, to proceed immediately following the Board's rulings after the February 22 confer-ence.

The County's motion for reconsideration does not con-tend-that~the Board lacks the authority to issea the February 2 Order or that it abused its discretion in doing so. The oppo-site is true. The Board's authority is not disputed and the reasons-cited above plainly reflect that the Board has properly exercised its discretion in this instance. See In the Matter of Statement of Policy on Conduct of Licensing Proceedings, 13 NRC1452, 456'(1981).

So. manifest are the advantages of the Board's February 2, 1984-Order that LILCO urges the Board to expand the Order to

. require the parties to submit, in addition to document S

e

~

requests, the names of all party and nonparty witnesses they propose to depose and the general subject matter of each pro-posed deposition. This information would be useful to the

' Board for all the reasons listed above. Also, with this infor-mation, the Board may consider and order that certain deposf-tions be taken or not be taken based upon its rulings on the issues.to be litigated. See 10 CFR 55 2.718(d), (e), (f).

In ruling on Suffolk County's motion for reconsid-eration, the Board may consider the following points with re-spect to other matters raised in the County's notion:

1. The County has already received a significant num-ber of documents in discovery. A list of most of those docu-ments is attached. In addition,' representatives of Suffolk County have received information from the NRC Staff, visited the Shoreham site to incpect the diesels, and attended a number of meetings concerning TDI diesel generators.
2. Contrary to the County's. assertions, LILCO has not refused to obtain baseplate and piston-drawings from Delaval.

LILCO informed the County that those drawings were given to LILCO under a protective agreement which prevented LILCO from .

.providing them to the County. Thus, as in the past (with GE and SWEC), LILCO suggested to the County that it would be more efficient to discuss an appropriate protective agreement di-rectly w'ith counsel for TDI. The County chose not to do so.

.n Q

e Nonetheless, LILCO took steps to request that counsel for TDI prepara and send to the County a protective agreement covering the requested documents. On the day the County filed its mo-tion for reconsideration, TDI's counsel sent such an agreement to SC for their signature. The County may be able to expedite matters by dealing directly with counsel for TDI.

3. With respect to deficiency reports, the County made a blanket request for all diesel generator deficiency re-ports and then included a list of 52 specific deficiency re-ports. LILCO objected to the blanket request,1/ but agreed to produce the specific deficiency reports identified by the Coun-ty.2/ In addition, LILCO informed the County that while blanket requests were inappropriate, requests for deficiency reports relating to relevant specific issues or components would be acceptable.
4. With respect to-product improvements, the County also served a blanket request for all documents related to die-sel generator product improvements. The County also requested two specific documents on this subject. LILCO produced these l

1/ Parties should not be " permitted to use discovery proce-dures;to conduct a fishing expedition." 10 CFR Part 2 App. A, IV(a).

_ 2/ LILCO has already provided the County with some of these LDRs and the remainder will be produced as soon as finally re-viewed copies are obtained.

two documents, as well as several others dealing with the sub-ject of diesel generator product improvements. LILCO objected, however, to the blanket request.3/

5. The County suggests that the January 26 diesel generator owners group meeting transcript might affect the Board's views on discovery because the Board might not have re-alized the extensive scope of the diesel generator design re-view and quality revalidation (DRQR) program. This may be so, but LILCO thinks the County underestimates the Board. The Board was informed of LILCO's commitment to perform a complete review of the design and quality of the Shoreham diesels in November 1983. See LILCO Status Report dated November 17, 1983. The Board also received slides from a November 3 meeting (attended by County representatives) between LILCO and the NRC where the proposed program was discussed. See " Summary of November 3, 1983 Emergency Diesel Generator Meeting," dated i

December 8, 1983. Further, in early January, the Board and the County received copies of LILCO's diesel generator recovery program which included a detailed description of the DRQR for Shoreham. This submittal also contained the detailed proce-dures to be used in performing the DRQR.

3/ See note 1 above.

i

LILCO has no objection to the Board's review of the

~ January 26, 1984 transcript, but there is no reason to conclude that such a review must be accomplished before the Board can decide that a review of the parties' proposed document requests (and depositions) would materially advance the progress of the hearings.

For the reasons stated, LILCO respectfully submits that the Board's February 2, 1984 Order should not be vacated, but that it be modified to require the parties to identify the party and nonparty witnesses they now propose to depose and the ,

subject matter of each such deposition.

Respectfully submitted, LONG ISLAND, LIGHTING COMPANY

.. /

a

.. S. 7/l'hr,1IIT Anthonf/F. Earley, Jr.

I Hunton & Williams '

P. O. Box 1535 Richmond,' Virginia 23212 DATED: February 11, 1984

4.

LILCO, Februnry 11, 1984

  • O CERTIFICATE OF SERVICE D I U Eb rr- : -- .- .

In the Matter of hCCD.i a-LONG ISLAND LIGHTING COMPANY C # '*

(Shoreham Nuclear Power Station, Unit 1)

Docket No. 50-322 (OL)

I hereby certify that copies of LILCO's Response to the County's Motion for Reconsideration of Board Order Dated February 2, 1984 were mailed on February 13, 1984 to the fol-lowing by first-class mail, postage prepaid, or were sent by Federal Express on February 11, 1984, as indicated by an aster-isk:

Lawrence Brenner, Esq.* Secretary of the Commission Administrative Judge U.S. Nuclear Regulatory Atomic Safety and Licensing Commission Board Panel Washington, D.C. 20555

~U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Washington, D.C. 20555 Appeal Board Panel U.S. Nuclear Regulatory Dr. Peter A. Morris

  • Commission Administrative Judge Washington, D.C. 20555 Atomic Safety and Licensing Bosrd Panel Atomic Safety and Licensing U.S. Nuclear Regulatory Board Panel Commission U.S. Nuclear Regulatory Washington, D.C. 20555 Commission Washington, D.C. 20555 Dr. George A.~ Ferguson*

Administrative Judge Robert E. Smith, Esq.

Atomic Safety and Licensing Guggenhei.9er & Untermyer Board Panel 80 Pine Street School of Engineering New York, N.Y. 10005 Howard University 2300 6th Street, N.W.

Washington, D.C. 20059

' Bernard M. Bordenick, Esq.* David J. Gilmartin, Esq.

. David A. Repka, Esq. Attn: Patricia A. Dempsey, Esq.

U.S. . Nuclear Regulatory County Attorney Commission Suffolk County Department of Law Washington, D.C. 20555 Veterans Memorial Highway Hauppauge, New York 11787 Herbert H.' Brown,.Esq. Stephen B. Latham, Esq.

Lawrence Coe Lanpher, Esq. Twomey, L,atham & Shea Alan R. Dynner, Esq.* 33 West Second Street Kirkpatrick, Lockhart, Hill, P. O. Box 398 Christopher & Phillips Riverhead, New York 11901 8th Floor 4

1900 M Street, N.W. Ralph Shapiro, Esq.

Washington, D.C. 20036 Cammer and Shapiro, P.C.

9 East 40th Street Mr. Marc W. Goldsmith New York, New York 10016 Energy Research Group 4001 Totten Pond Road James Dougherty, Esq.

Waltham, Massachusetts 02154 3045 Porter Street Washington, D.C. 20008 MHB Technical Associates

. 1723 Hamilton Avenue Howard L. Blau Suite K 217 Newbridge Road

. San Jose, California 95125 Hicksville, New York 11801 Mr. Jay Dunkleberger Jonathan D. Feinberg, Esq.

New York' State Energy Office New York State Agency Building 2 Department of Public Service Empire State Plaza Three Empire State Plaza Albany, New York 12223 Albany, New York 12223 J k Anthony F itrIey, J /

Hunton & Williams 707 East Main Street P.O. Box 1535 Richmond, Virginia 23212

- DATED: February 11, 1984

IT124 PRODUCED --

b 3/29/76 Letter Bienougs (SWEC) f rom W.V.

to E.

'Deane (TDI) following Telecon gr 3/24/76 and inspection of 3/27/76 k/2/76 Letter from {.C.

Deane (TDI) to W.V.

Blenduga (SWEC) re-sponding to }/29/76 Blenduga Letter .

' 4/21/83 Letter from TDI jo kammeyer summarizing TDi's responses to the a rea s or gonce rn ra i sed in Letter of 3/11/83 from D. Terry to S. }chumacher (no attached responses) 3/5/76 Memorandum from W.V. Blenduge (SWEC) to R.A. Plant (SWEC) re Storage gr Diesel Genera-to r Ma rk No. R43*G101, Attaching a Pumber of Ielext -

--- Set or SWEC 3 hop in-spection Reports (indexed by part or diesel) and yariously dated

--- Minutes-Status re-ported 2/2, 2/9, 2/16, 2/23/83

==- Proposed agenda for the 3/17 diesel gene ra to r meeting 10/6/76 TDI-0A yoncestructive Examina-tion Procedure, " Magnetic Pa rt ic le

{xa mi na t ion-Gene ra l" 4/27/78 TDI ),necification no. 600-3. Ites t T ren t -

Procedure }pecification for Normalizing Carbon and Low Alloy Steels 6/3D/79. TDI-0A frocedure-Quality Control inspection Procedures--rinal inspec-tion. l.P. 400 2/27/81. 'TDI guality As-surance Manual s

s.,

ITEM PRODUCED ,

4/1/81 IDI QA

  • frocedure-Shipping and .

Receiving Inspeption, l.P. 200 4/1/81. TDI QA frocedure-in-Process in-spection. 1.P. 300 4/1/81 TDI QA Procedu re-Non-De s t ruc t i ve lxamination. I.P. 600 2/12/82 Rev. TDI 9A Procedure-Qua li ty Control Inspection ,

f rocedu re s--Ca l i b ra t i on. ,

l P. 100 8/24/82.

IDI-Qualification Test.

TVA, Hartsville Nuclear Plant, thipps Bend Nucle-er Plant. C. F. Braun Specification 164-03, Bev. 6, 10/20/80 1/26/83 Agenda item for Weekly Sta rtup Meet ing-Sta tus repor ted 1/19/83

--- Minutes f rom 1/19 and 1/26/83 Weekly Startup Mee t i ng 1/25/83 Rev. TDI foundry Quality Control Manual 1

3/17-18/83. LILCO-Notes gr Conference, Diesel Generator Operator Review Meeting -- SNPS 4/14/83 Hemo f rom J.J.

Cirilli to A.W. Zeuthen re Trip Report on Diesel Generators at kansas and Delaval, California 4/21/83 signed trip re- .

. port by Hammeyer, Schuster, Cirilli on trip to Lincoln Municipal Power Station, Lincoln, Kansas, 4/5/83 and TDI, -

3/7-8/83

e.

i ITEM PRODUCED .

9/26/77 Letter to IDI from J.F. Wallace, Case -

Western Reserve, outlining ppinions con-cerning problems of a steel head for a 4 valve gylinder 8/16/82 Letter to

erecke, LILCO, from R.S.

Costa, SWEC, re proposed A/30-9/2/82 survey 1/5/83 Letter Boyer, to R.E.

TDI, from f.C.

Bajada, LILCO, re quality gurvey for the week of

  • 2/14/83 1/?O/83 Letter lo Ray Ca rdella f rom Youngling re acquisition no. 75766 for approx. S75,000 to cover cost of purchasing 2 cylinder heads and as-sociated gaskets from Delaval 1/20/83 letter le Tom .

Brown, LILCO, from R.

Feinstein, TDI, re repair hulletin on 4-valve cyl- -

' Inder heads 2/10/83 Letter to J.

Spolizino, LILCO, from R.

i Feinstein, TDI, waiving

' $3000 charge for vendor audit 2/22/83 Letter to 3 Rudikoff from W.L.

i McHugh, TDI, re qualifi-l L

cation of gylinder head l P/N 1 A-6646 for use on nuclear engine 1

5/4/83 Letter to A.W.

Wof ford LILCO, f rom R. A.

l

' Pra t t, TDI, confirming Delaval's offer to sell LILCO new, current pro-duction cylinder heads at a reduced price l 5/19/83 Letter to A.W.

Wof f o rd, L'LCO, from P.J.

Hold 6n, SkiC, enclosin; .

u purchase requisition no.

100402-18, issued to up-date purchase Erder 310552 to cover the cost of 19 replacement eviin-der liead assembt !?S and associated hardware I

. s 4

ITEM PRODUCED 2/27/74 loc from 9 1 1 Beaman, SWEC, to R.A.  ; .

Plant /M.F. Cibbons, SWEC, .

re 2/26/74 PQC- Survey

( a tssched )

Undated 10C from }.J.

Stratis to E. O'Connor with manual checklist dated }/14/74 attached 12/12/74 IOC from 9 l. -

Beaman to R.A. Plant /J.D.

Tramontane, on 12/13/74 greliminary QC spec re- ,

view ,

8/12/75 10M rrom W.C. .

. Mo rrey ( SWEC) to W.S.

Diehl (SWEC) re 7/28-29/75 ylsit to TDI 1 and - 7heraxchanger 8/22/75 IOC from James Powers to Ralph Costa re-questing parts of the QA Manuals s 6/24/76 IOM from B.A.

Plant to G. Mikuda re-sponding to LILCO QA Ac-tion Bequest 1-76 10/6/76 IOM from W.C.

Morrey ( SWEC) to W.S. a Dicht (SWEC) re 7/19-20/76 ylsit to TDI- .

2/8/83 Memo from 1.C.Prats, 1 Schumache r to R. A. J TDI, giving report on 3 rip or 1/31-2/4/83 to J Shorubam to review items needing dispositioning 3/2/83 Memo from E.J.

Maksin to R. Ca rdella at-tachin grder"g status report on "Open 3/25/83 Memo from M.3.

Milligan to W.J. Muscler re potential problem involving suspected cracking in two cylinder s heads 4/7/83 lelephonc Memoran-

  • dum between R. Callow 79d

-C.K. Seaman and W.H.

Judge re potential Rep.

Def. DG Cracked Cylinder Heads 4/4/83 10C from J.C. '

kammeyor to A. Muller at-teching TDI failure Anal-yscs Hos, 0150 and 0151  ;

(not attached) 3

ITEM PRODUCED fa/21/83(? ) hantiwritten note from Jim Higgins to Mike Milligan gon*aining , ,

questions on the 50.55c .

report 4/25/83 10M from R.J.'

Jaquinto to M.lf. Hilligan re recommendation grrored arter diesel generator requa li fica tion requi re-ments were reviewed 5/2/83 Handwritten Mcmo freq M.H. Milligan to J.

Higgins attaching answers-10 Higgins' questions on the DG Head Cracks Letter .

5/31/83 loc from R.S.

Costa to E.C. BaJada attaching responses to questions raised about Delaval during a tele-phone conversation 6/8/83 Memo from Q.K.

Seaman to J.M. kelly re-questing an audic be cer-formed to verify that all required NDE is or has been performed on Shoreham's replacement cylinder heads 6/15/83 loc rrom W.H.

Judge to J.C. kammeyer re 1WX to TDI requesting any 4 exterior weld repairs on the cast surraces of the gylinder heads being sent tc SNPS be MT 6/16/83 IOC f rom George Cula to Joe Spolizino at-taching.1DI response to deficiencies per 3/17/83 and 5/31/83 correspon-dence 10/8/75 Telex f rom W.V.

Bienduga to J.A.

Marques /J. Powers showing 10/29-30/75 scheduled audit for TDI 10/9/75 Letter to I.C.

Deane, TDI. from W.V.

Blenduga, SWEC, re sched- -

ute or audit for 10/29-3I/75

)

l l

l 1

l

IT]QH PRODUCED s 11/13/75 IDc from W.V.

Bienduge to J.A. Marques reporting on 10'/28-3D/75 tudit or TDI 3 11/20/75 Lette r f rom R. A.

Plant to E.G. Deane (101) w/ attached Duality Assur-ance Audit Report,.TDI, 10/28-3D/75 1/13/76 Letter f rom E.G.

Deane (TDI) to R.A. Plant in response to 10/28-3D/75 audit .

. 1/27/76 IOC from 9. Folty to W.V. Blenduga at-taching TDi's response to the 10/28-30/75 audit 5/18/76 Letter f rom R. A.

Plant to E.G. Deane v/ attached Quality Assur-ance Re-audit Report.

TDI, 2/23/76, and S/18/76 cove r f rom J. A. Ma rques to R.A. Plant 6/2/76 IDM rrom J.A.

MJrques to R.A. Plant at- -

taching Audit Status Re-port for week ending 5/28/76 6/14/76 Letter f rom g.

Renfro to R.A. Plant re corrective actions in re-sponse lo 2/23/76 reaudit report 6/21/76 Telex from W.V.

Bionduga to J. Marques regarding reaudit or 1DI gerformed 6/13/76 7/1/76 Letter f rom R. A.

!- Plant to E.G. Deane w/ attached Quality Assur-ance Se-Audit Report.

TDI, 6/18/75 and 7/1/76 cover f rom J. A. Ma rques to R.A. Plant 3/17/83 Letter to R.

Boyer, TDI, from G.M. .

u Schierberg, SWEC, thanking him for courtesy shown representative dur-ing audit 3/22/83 Trar.smitta l Let-ter to T.r. Gerecke.

LILCD, from R.S. Costa, SWEC, with 9A survey dated 3/22/83 attacned

ITEM PRODUCED

(/6/83 Letter to 9.M.

Schierberg, SWEC, f rom L.L. Mills, TDI, re- .

sponding to gericiencies found during tria 2/27-28/83 survey and re-ferencing 3/17/83 letter from Schierberg -

FA-1627, 6/14/83; lo T.T.

Cerocke from Nicholas and Kelly, to assure all re-qui red NDE and tests a re being performed on the DG Ieplacement heads SNRC-873, g/15/83, from -

M.H. Milligan to J.M.

Allan, NRC, 30-day writ-ten report on potential deficiency concerning ap-pa rent gracking of cylin-der heads 6/8/70 Delaval Quality Control Inspection proce-dures (IP-300) 3/14/74 SWEC Manual Check List for TDI with OA Man-ual sections attached 9/25/75 SWEC } hop Inspec-tion Report 1/20/76 SWEC } hop Inspec-tion Report 2/24/76 SWEC 1 hop inspec-tion Report 12/21/79 SWEC } hop in-spection Report ,

9/20-26/82 TDI Gustomer Service Report with attached memoranda on the Star of Texas, some with deleted portions as given to SC 3/15/83 TDI foundry Prac-tice Procedure, Spec.

9010-03-360-03-0F.

'3/20-31/83 Synoptic Re-port Oy R.D. Jacobs and ,

Associetes, observation or Emergency Diesel-Generator Set Sta rt-Up Operations and Tests 4/13/83 Approved LILCO Qua li ty Assurance Suppli- l er Evaluation Report based gn survey of TDI performed 2/28/83 by SWEC i

. - _ . . _ . , - . ,_ m _ , - - - _

e 1

' ITEM PRODUCED 6/28/63 Transmittal gr Supplier Evaluation Re-suits - Supplier Name:

TDI Undated 5 gage document with title "o Valve Steel Head 360-03-OF" ( see do above) listing changes to roundrY 2rocedures) 6/7/76 LILCO guality As-sprance Action Request 1-76 with responses at-tached ,

Ur. dated one-page document ,

on a suggestion to per-form NDE (MP) on pur-chased glesel heads f rom Delaval af ter repa i r weld PWH1 1982 Table antitled Cast-ing and Machining Prob-lems with RV-4 Steel Gyl-inder Heads, TDI 10/6/83 Final Report on the Diesel Engine Head Casting, with Cover Let-te r f rom C.R. Isleib to R.M. Kascsak and Cover Letter dated 10/14/83 from A.W. Zeuthen to A.F.

Ea rley 1/15/75, Revised 3/31/76, TDI Liquid F.netrant Ex-amination - Genera l Pro-

' cedure 6/78-9/80 IDI Daily Found ry Reports 2/27/81 TDI ASMT Quality Assurance Manual 10/3/83 Letter from Earicy to Judges and Ser-vice List, attaching "Prel imina ry Meta l lurgi-cal.Evnluation of Failed Cranksha f t f rom DC 102" by' Failure Analysis Asso-cistes ,

11/2/83 Letter from L.

McHuDh (TDI) to J.

Kammeyer ( LILCO) at-taching the 10/28/83 )

Woodward Governor Failure ,

Analysis for DC 102 11/9/83 Letter from W.L.

McHugh (TDI) to John 1 l

kammeyer (LILCO) re Pa r- '

sons Peebles Electric Products, Generator Fa il- **

ure Ana lysis

*=

f .

_9_

ITDI PRODUCED 9/9/83 Menorandum from W.H. Wells (rAA) to M.

Milligan (LILCO) containing 1he checklist

  • of metallurgical analyses to be performed imemoran-dum attached to Prelimi-na ry Me ta l lu rg ica l Evalu-stion) 9/22/83 Memorandum f rom Youngling to Pollock re:

reassembly or Diesel gen-e ra to r 103 9/25/83 Memorandum f rom Younglin) to Pollock re:

reassembly or Diesel gen- .

e ra to r 102 10/13/81 Memorandum f rom Loa Swanger (I AA) to Mike Milligan (LILCo) re:

.stimma ry n f' rindings:

. Lmurgerney Dicsci Eng one Connecting Rod Doa rie:os lu/24/83 Memornndum f rom E.J. Youngling to 1-1.5.

I'nf lock re reassembly or

' Diesel Generator 101 11/2/83 Telephone Memo-random between J.C. -

kammcynr (SWCC) and P.

Silvosberg f l'a rsons-l'ceb l e s )

Prel imina ry Meta llurgical Evaluation of Failed Crankshaf t f rom DC 102 by FAA Ultrasonic Evaluation Re-port or Diesel Gene ra to r Crankshaf ts (Nuclea r _En-orgy Services)

- LILCO {mergency Diesel Generator Insoection Pro-cedures for Diesel Ge ne r-stors 101, 102 and 103 LILCO {morgency Diesel Ganerator Tea rdown Ga.delines for Diesel Gene ra to rs 101, 102 and 193 Ll;CO $ train Cauge Test s Prtcedure Emergency Diesel Generator No.1 Crankshart (Revisions 0 and 1) 10/5/83 Delavas Beport entitled "rfeld

~ Torslograph Test Report" for LILCO 10/11/83 Parsons .

feebles-Electric Inc rallure Analy Products

$ ~

Pecort - LF-3060 t c0c 102 generator rotor)

6

-10e ITEM' PRODUCED 11/25/83 Memorandum

, from L.A. Swanger/M.F. Wacheb (FaAA) to M.H. Milli ?cn re:. Failure Analysis of Fractured Cylinder Head Nut, TDI Enterprise Emergency Diesel i Generators ll/30/83. Memorandum from L.A. Swanger

.to M.H. Milligan re: Selected Component Weights, TDI Enterprise Emergency Diesel Generators

. 9/19/83 Letter from W.L. McHugh,TDI, .

to Neal-Rudikoff, LILCO, re:

  • Dispositions for LDR's Noted upon Disasssmbly of DG 103

'12/6/83 IOM.from Ralph Jaquinto'to E.J. Youngling forwarding Report on Analysis of Lubricating Oil for Emergency Diesel Generators 12/2/83 Memorandum from L.A. Swanger to M.H. Milligan re: Selected Component Weights,.TDI Enterprise, Emergency l

Diesel Generators

- 12/9/83 Failure Analysis Associates'

' report. entitled Metallurgical Analysis

. of Cracked Piston Skirts from

! Emergency Diesel Generators, Shoreham-Nuclear Power Station, FaAA-83-ll-13 l

12/7/83 Letter from C.H. Wells to

- M.H. Milligan/W.M. Judge re:

Integrity of EDG Engine Bases, Shoreham Nuclear Power Station-Unit 1 12/14/83 Shoreham Nuclear Power Station '

l . Emergency Diesel Generator Recovery Iest Program, approved by E.J. Youngling, 12/14/83

!~ 12/15/83 Failure Analysis Associates' final = report on connecting rod bearings l 12/15/83 Memorandum from Donald O. Cox, l

FaAA, to M.H. Milligan re: inspection of jacket water pumps from.TDI Diesel Engines, Shoreham

J ITEM PRODUCED Emergency Diesel Generator 101 Crankshaft Strain Gauge Test Procedure (Rev. 0)

Emergency Diesel Generator 101 Crankshaft Strain-Gauge Test Procedure (Rev. 1)

SWEC Field Test on Emergency Diesel 101 Report FaAA's Emergency Diesel Generator .

Crankshaft Failure Investigation FaAA's Analysis of the Replacement Crankshaft for Emergency Diesel Generators f

1/6/84 LILCO Shoreham Diesel Recovery Program Summary and.

Appendices P

e I

i l

1

- l 1

=

~. l

1. -TDI Inspection Report No. 0783 dated 2/21/81;
2. TDI Nondestructive Examination Procedure entitled " Hydrostatic Testing" dated 10/24/80;
3. TDI ASME Quality. Assurance Program issued 4/1/81;
4. Delaval Quality Control Inspection Procedures issued 4/28/75;
5. Delaval Quality Assurance Manual- issued 3/1/74;
6. TDI Quality Control Inspection Procedures I.P. 100 Calibration Manual issued 6/30/79; ,
7. TDI Shipping and Receiving Inspection Manual I.P. 200 issued 6/30/79;
8. TDI Quality- Control Inspection Procedures I.P. 300 In-Process Inspection issued 6/30/79;
9. TDI Quality control Inspection Procedures I.P. 400 Final Inspection issued 6/30/79; and
10. TDI .Non-Destructive Examination I.P. 600

. issued 6/30/79.