Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000254/LER-1982-020, Forwards LER 82-020/03L-0 + (ML20069H606)
- ML20069H607 + (ML20069H607)
- ML20069H613 + (ML20069H613)
- ML20069H618 + (ML20069H618)
- ML20069H619 + (ML20069H619)
- ML20069H620 + (ML20069H620)
- ML20069H622 + (ML20069H622)
- ML20069H623 + (ML20069H623)
- ML20069H626 + (ML20069H626)
- ML20069H628 + (ML20069H628)
- ML20069H630 + (ML20069H630)
- ML20069H631 + (ML20069H631)
- 05000325/LER-1982-100, Forwards LER 82-100/01T-0 + (ML20069H636)
- ML20069H637 + (ML20069H637)
- ML20069H641 + (ML20069H641)
- 05000336/LER-1994-010, :on 940513,actuation Resulted in Starting of Facility II Charging Pump,Both Boric Acid Pumps.Caused by Spurious Actuation of DG Load Sequencer.Signal Noise Spikes Will Be Added to Quenched W/Stunting Resistor + (ML20069H642)
- ML20069H643 + (ML20069H643)
- ML20069H644 + (ML20069H644)
- ML20069H645 + (ML20069H645)
- ML20069H647 + (ML20069H647)
- ML20069H650 + (ML20069H650)
- ML20069H651 + (ML20069H651)
- ML20069H656 + (ML20069H656)
- ML20069H658 + (ML20069H658)
- 05000325/LER-1982-100-01, /01T-0:on 821001,determined That Tailpipe for Safety Relief Valve F013H Could Fail During Seismic Event. Addl Analysis Not Performed.Addl Support (PS-6647) Added Where Tailpipe Passes Through Deflector Plate + (ML20069H659)
- ML20069H660 + (ML20069H660)
- ML20069H665 + (ML20069H665)
- ML20069H670 + (ML20069H670)
- ML20069H672 + (ML20069H672)
- ML20069H680 + (ML20069H680)
- NRC-94-4156, Forwards Nonproprietary & Proprietary Version of Phase Iva Wind Tunnel Testing for Westinghouse AP600 Reactor. Proprietary Version of Rept Withheld (Ref 10CFR2.790) + (ML20069H682)
- ML20069H683 + (ML20069H683)
- ML20069H686 + (ML20069H686)
- ML20069H688 + (ML20069H688)
- ML20069H689 + (ML20069H689)
- ML20069H690 + (ML20069H690)
- ML20069H692 + (ML20069H692)
- ML20069H694 + (ML20069H694)
- 05000302/LER-1982-058-01, /01T-0:on 820924,valve Lineups Identified Which Allow Once Through Steam Generator Drain Lines to Be Used for Blowdown Operations & Also Allows High Energy Fluid Through Lines.Caused by Inadequate Review of Sys Design + (ML20069H696)
- ML20069H697 + (ML20069H697)
- 3F0694-06, Forwards Rev 7 to Training & Qualification Plan.Rev Withheld + (ML20069H699)
- ML20069H705 + (ML20069H705)
- HNP-94-048, Forwards Rev 7 to Security Plan,Per 10CFR50.54(p)(2).Rev Withheld + (ML20069H711)
- ML20069H717 + (ML20069H717)
- ML20069H720 + (ML20069H720)
- ML20069H721 + (ML20069H721)
- ML20069H722 + (ML20069H722)
- ML20069H724 + (ML20069H724)
- ML20069H727 + (ML20069H727)
- 05000254/LER-1982-020-03, /03L-0:on 820920 & 21,RCIC Area High Temp Isolation QIS-28,3 Switches 1-1360-14A,1-1360-17B & 1-1360-16C,would Not Trip.Cause Not Specifically Determined. Failed Switches Returned to Manufacturer for Analysis + (ML20069H728)
- ML20069H730 + (ML20069H730)