3/4.7 PLANT SYSTEMS i
SURVEILLANCE REQUIREMENTS (Continued) b.
Before entering MODE 3 after a COLD SHUTDOWN of at least 14 days by completing a flow test that verifies the flow path from the condensate storage tank to the steam generators.
egroEume wTsue-c.
At least once per 28 =th:- by:
1 1.
Verifying that each automatic valve in the flow path actuates to its correct position (verification of flow-modulating characteristics not required) and each auxiliary feedwater pump automatically starts.upon receipt of each AFAS test signal, and 2.
Verifying that the Auxiliary Feedwater System is capable of providing a minimum of 300 gpm nominal flow to each flow leg.
f-4 This surveillance may be performed on one flow leg at a time.
CALVERT CLIFFS - UNIT'l 3/4 7-7 Amendment No. 4efr '
l 9406130252 94060s PDR ADOCK 05000317 P
ATTACIIMENT (2)
UNIT 2 TECIINICAL SPECIFICATION MARKED-UP PAGE 3/477
f 3/4.7 PLANT SYSTEMS SURVEILUUICE REQUIREMENTS (Continued) b.
Before entering MODE 3 after a COLD SHUTDOWN of at least 14 days by completing a flow test that verifies the flow path from the condensate storage tank to the steam generators.
gsFost.wcr 1NTEAVAL c.
At least once per 18 n aths by:
l 1.
Verifying that each automatic valve in the flow path actuates to its correct position (verification of flow-modulating characteristics not required) and each auxiliary feedwater pump automatically starts upon receipt of each AFAS test signal, and 2.
Verifying that the Auxiliary Feedwater System is capable of proyiding a minimum of 300 gpm nominal flow to each flow leg.
This surveillance may be performed on one flow leg at a time.
CALVERT CLIFFS - UNIT 2 3/4 7-7 Amendment No. -163-l