.: * . j 3/4.8 ELECTRICAL POWER SYSTEMS )

SURVEILLANCE REQUIREMENTS (Continued)

2. For the 69 kV SMECO offsite power circuit, within one hour of substitution for a 500 kV offsite power circuit, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability; and 6 E FOEuNrr .ToTERVAL
b. Demonstrated OPERABLE at least once per -18 ;rsrthe during shutdown i by manually transferring unit power supply from the normal circuit to the alternate circuit.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a. At least once per 31 days on a 3TAGGERED TEST BASIS by:
1. Verifying the fuel level in the day fuel tank.
2. Verifying the fuel level in the fuel storage tank.
3. Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank.
4. Verifying the diesel starts and accelerates to at least 900 rpm with generator voltage and and 60 1 1.2 Hz, respectively., frequency at 41601420 volts
5. Verifying the generator is synchronized, loaded to 31250 kW, and operates for E 60 minutes.
6. Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.
7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval.
b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits specified in Table 1 of ASTM D975-81 when checked for viscosity, water and sediment.

All engine starts for the purpose of this Surveillance Requirement i

may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.

CALVERT CLIFFS - UNIT 1 3/4 8-4 Amendment No. -l&

9406130247 940608 PDR P

ADOCK 05000317 PDR

.. .- 1 A'ITACIIMENT (2)

I l

UNIT 2 TECHNICAL SPECIFICATION MARKED-UP PAGE 3/48-4

r-

/ - ,

3/4.8 ELECTRICAL POWER SYSTEMS

, SURVEILLANCE REQUIREMENTS (Continued) f

2. For the 69 kV 1.200 offsite power circuit, within one hour of ,

substitution for a 500 kV offsite power circuit, and at least l' once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability; and REFusuwr raTeAv6L

b. Demonstrated OPERABLE at least once per 18 :: th: during shutdown l by manually transferring unit power supply from the normal circuit to the alternate circuit. ,

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:  :

a. At least once per 31 days on a STAGGERED TEST BASIS by:  ;
1. Verifying the fuel level in the day fuel tank. ,
2. Verifying the fuel level in the fuel storage tank.
3. Verifying the fuel transfer pump can be started and transfers  !

fuel from the storage system to the day tank. -

4. Verifying the diesel starts and accelerates to at least 900  !

rpm with generator voltage and 4160 1 420 volts and 6011.2 Hz, respectively., frequency at

5. Verifying the generator is synchronized, loaded to 21250 kW, and operates for E 60 minutes.
6. Verifying the diesel generator is aligned to provide standby j power to the associated emergency busses.  ;

i

7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval. l l
b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits l specified in Table 1 of ASTM D975-81 when checked for viscosity, l water and sediment. l l

l 1

l All engine starts for the purpose of this Surveillance Requirement t may be preceded by an engine prelube period and/or other wannup procedures reconnended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.

CALVERT CLIFFS - UNIT 2 3/4 8-4 Amendment No. -149- ,