Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20062N775 + (ML20062N775)
- ML20062N776 + (ML20062N776)
- 05000247/LER-1982-030, Forwards LER 82-030/03L-0 + (ML20062N778)
- ML20062N780 + (ML20062N780)
- ML20062N785 + (ML20062N785)
- ML20062N788 + (ML20062N788)
- 05000247/LER-1982-030-03, /03L-0:on 820710,during Normal Operation,Bypass Valve 267A in Chemical & Vol Control Sys Found Leaking. Caused by Damaged Diaphragm.New Valve Bonnet Assembly & Diaphragm Installed + (ML20062N791)
- ML20062N792 + (ML20062N792)
- ML20062N794 + (ML20062N794)
- ML20062N796 + (ML20062N796)
- ML20062N798 + (ML20062N798)
- ML20062N800 + (ML20062N800)
- 1CAN088205, Advises That Supplemental ECCS Calculations Will Be Provided by 830215,in Response to 820713 Request.Calculations Address Potential Impact of Cladding Models in NUREG-0630 on B&W ECCS Calculations + (ML20062N801)
- ML20062N802 + (ML20062N802)
- ML20062N806 + (ML20062N806)
- ML20062N808 + (ML20062N808)
- ML20062N809 + (ML20062N809)
- 05000333/LER-1982-033, Forwards LER 82-033/03L-0 + (ML20062N812)
- ML20062N814 + (ML20062N814)
- ML20062N819 + (ML20062N819)
- ML20062N821 + (ML20062N821)
- 05000333/LER-1982-033-03, /03L-0:on 820706,reserve Power Breaker 10022 Was Open for Approx 4 Minutes,Rendering Light House Hill Line 3 Unavailable.Caused by Lightning Strike.No Corrective Action Required + (ML20062N822)
- ML20062N825 + (ML20062N825)
- ML20062N826 + (ML20062N826)
- ML20062N830 + (ML20062N830)
- ML20062N831 + (ML20062N831)
- ML20062N836 + (ML20062N836)
- ML20062N840 + (ML20062N840)
- ML20062N841 + (ML20062N841)
- ML20062N843 + (ML20062N843)
- ML20062N845 + (ML20062N845)
- ML20062N847 + (ML20062N847)
- ML20062N848 + (ML20062N848)
- ML20062N854 + (ML20062N854)
- ML20062N859 + (ML20062N859)
- ML20062N860 + (ML20062N860)
- PY-CEI-NRR-1733, Monthly Operating Rept for Dec 1993 for Perry Nuclear Power Plant,Unit 1 + (ML20062N861)
- ML20062N863 + (ML20062N863)
- ML20062N869 + (ML20062N869)
- ML20062N873 + (ML20062N873)
- ML20062N880 + (ML20062N880)
- ML20062N883 + (ML20062N883)
- 05000249/LER-1982-030, Forwards LER 82-030/03L-0 + (ML20062N885)
- ML20062N887 + (ML20062N887)
- ML20062N890 + (ML20062N890)
- 05000249/LER-1982-030-03, /03L-0:on 820716,transient in-core Probe Ball Valve 3A Failed to Reclose After Opening.Cause Will Be Resolved During Next Outage.Valve Will Be Replaced & Supplemental LER Submitted When Cause Determined + (ML20062N900)
- ML20062N901 + (ML20062N901)
- BSEP-94-0005, Provides Info Discussed W/Nrc During 931221 Telcon Re Unit 1 Shroud Clamp Bolt Bending Stresses & Max Allowable Bolt pre- Load + (ML20062N903)
- ML20062N912 + (ML20062N912)
- ML20062N917 + (ML20062N917)
- ML20062N925 + (ML20062N925)