ML20062N847

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Nov 1993 for Comanche Peak Steam Electric Station Unit 2
ML20062N847
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/30/1993
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20062N829 List:
References
NUDOCS 9401240116
Download: ML20062N847 (1)


Text

'

. Attachmcot to TXX 94003 Page 13 of 13 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT REVISION 1 DOCKET NO 50-446 UNIT CPSES 2 DATE 01/14/1994 COMPILED BY Janet Hughes TELEPHONE 817-897-5331 OPERATING ST ATUS

1. REPORTING PERIOD: NOVEMBER 1993 GROSS HOURS IN REPORTING PERIOt': 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150*

DESIGN ELECTfuCAL RATING (MWe Net): 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 682 2,545 2,545
6. REACTOR RESLRVE SHUTDOWN HOURS 38 327 327
7. HOURS GENERATOR ON LINE 663 2.501 2,501
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,063,460 8,105,455 8,105,455
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 698,030 2,731,497 2,731,497
11. NET ELECTRICAL LNERGY GENERATED (MWH) 676,354 2,619,488 2,619,488
12. REACTOR RESERVE FACTOR 94.8 88.6 88.6
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 100.0
14. UNIT SERVICE FACTOR 92.1 87.1 87.1
15. UNIT AVAILABILITY FACTOR 92.1 87.1 87.1
16. UNIT CAPACITY FACTOR (USING MDC) 81.7 79.3 79.3
17. UNIT CAPACITY f ACTOR (USING DESIGN MWe) 81.7 79.3 79.3 18 UNIT FORCED OUTAGE RATE 7.9 2.2 2.2 19 SHUTDOV.TJS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PER!OD, ESTIMATED DATE OF STARTUP:
21. UNrt S IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATE 9401240116 940114 PDR ADOCK 05000445 R PDG