- kttachment to TXX-94003 Page 10 of 13 i
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT REVISION 1 DOCKET NO -
50-446 UNIT CPSES 2 j
t DATE 01/14/1994 i
COMPILED BY Janet Hughes j
TELEPHONE.
817-897-5331 l
OPERATING STATUS 1.
REPORTING PERIOD: SEPTEMBER 1993 GROSS HOURS IN REPORTING PERIOD: 720 I
2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX DEPEND. CAPACITY (MWe-Net): 1150' i
DESIGN ELECTRICAL RATING (MWe-Net): 1150 j
f 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE l
I S.
NUMBER OF HOURS REACTOR WAS CRITICAL 430 1,117 1,117 6.
REACTOR RESERVE SHUTDOWN HOURS 290 290 290 i
7.
HOURS GENERATOR ON LINE 406 1.093 1,093 3
8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0-9.
GROSS THERMAL ENERGY GENERATED (MWH) 1,317.156 3,644,602 3,644,602
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 441,350.
1,223,967 1,223,967 11.
NET ELECTR! CAL ENERGY GENERATED (MWH) 417,205 1,168,939 1,168,939-12.
REACTOR RESERVE FACTOR 59.8 79.4 79.4 f
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 100.0 14.
UNIT SERVICE FACTOR 56.4 77.8 77.8 15.
UNIT AVAILABILITY FACTOR 56.4 77.8 77.8 i
- 16. UNIT CAPACITY FACTOR (USING MDC) 50.4 72.3 72.3 i
17.
UNIT CAPACITY FACTOR (USING DESIGN MWe) 50.4 72.3 72.3
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 0.0 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED '
i INITIAL CRITICALITY 930320 930324 l
INITIAL ELECTRICITY 930330 930409' COMMERCIAL OPERATION 930801 930803 i
ESTIMATE I
i i
9401240112 940114 PDR ADOCK 05000445 R_
PDR m
Attachment to TXX-94003 Page 11 of 13 UNIT SHUTDOWNS AND POWER REDUCTIONS PEVISION 1 DOCKET NO 50-446 UNIT CPSES 2 DATE 01/14/1994 COMPILED BY Janet Hughes TELEPHONE 817 897-5331 REPORT MONTH: SEPTEMBER 1993 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 15 930917 S
313E8 8
1 Repaired valve leaks (steam generator 2-03 l
feedwater split flow bypass valve in containmera and feedwater full flow recirculation valve in the turbine building).
t i
- 1) REASON 21 METHOD A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND UCENSE EXAMINATION 1: MANUAL B;MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D. REGULATORY RESTRICTION H:OTHER(EXPLAIN) 4:OTHER(EXPLAIN)
-.. - ~..
. - - -.