Monthly Operating Rept for Dec 1993 for Callaway Plant Unit 1
ML20062N802
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/31/1993
From: Blosser J, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2934, NUDOCS 9401210126
Download: ML20062N802 (6)


Text

<

V

.s Ca!!ney Hunt Pcnt Omm &x 620 Fu!mit Mcsowi t;5251 January 10,1994 UNION Eutenue

?3 Nuclear Regulatory Cormnission Document Control Desk Washington, DC 20555 ULNRC-2934

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT DECEMBER.1993 The enclosed Monthly Operating Report for December,1993 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

[

d. D. Blosser f

%j Manager, Callaway Plant JDB/DEY/JA M J

rd Enclosure cc: Distribution attached i

PDR ADOCK 05000483 d

((2Y l

9401210126'931231 W

R ppg.

. Q+

fj y

. =

A 1

.t cc distribution for ULNRC-2934 l

.i S

EilllanGIM91M

[

Mr. M. J. Farber, Chief

[

Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region ill J

801 Warrenville Road

'l Lisic, IL 60532-4351 I'

Mr. L. R. Wharton (2 copies)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Conunission l

I White Flint, North, Mail Stop 13E21 1155 Rockville,MD 20852

}

NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission

i P.O. Box 360 JefTerson City, MO 65102 l

l

~

q

.1 I

l I'

')

t

=

. j DOCKET NO.

50-483 l

l UNIT NAME CALLAWAY UNIT I i

DATE l-10-94 COMPLETED BY J. B. McInvale

, f TELEP110NE 314/676-8247 2

5 PART A OPERATIONS

SUMMARY

The plant operated at approximately 100% power for the month of December with the following -

f exceptions:

l Power was reduced to 95% from 12-20-93 through 12-30-93 to replace a Heater Drain Pump motor and to repair high pressure feedwater heaters.

Power was reduced to 95% briefly for calibration of excore nuclear instruments on 12-7,12-10,1214 and 12-17-93.

PARTB PORV AND SAFETY VALVE

SUMMARY

t None

'Page1of4 j

. 1

.~j

~

4. I

+-

9 PART C

^

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit I DATE l-10-94 COMPLETED BY J. B. McInvale TELEPilONE. 314/676-8247 MONTil: DECEMBER 1993 j

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l

-)

I t

_DE (MWe-Net)

DAY (MWe-Net) l I

i 1164 17 1149 l

2 1166 18 1170 3

1166 19 1172 4

1168 20 1132 5

1169 21 1094 6

1169 22 1129' 7

1153 23 1129 3

8 1168 24 1117

~!

9 1162 25 1132 i

10 1134 26 1128 i

l1 1172 27 1124 12 1169 28 1078 3

i 13 1166 29 1123

's 14 1852 30 1136 t

15 1169 31 1166 i

16 1170 i

6 h

J

q y-

=

- PART D OPERATING DATA REPORT DOCKET NO. 50-483

{

UNIT NAME CALLAWAY UNIT 1 DATE l-10-94 COMPLETED BY J. B. McInvale TELEPHONE' 314/676-8247.

!q OPERATING STA'IUS t'

(YTD)

(CUM) 1.

REPORTING PERIOD: DECEMI3ER 1993 GROSS llOURS IN REPORTINO PERIOD: 744 8,760 79,165.5 2

CURRENTLY AUDIORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1120 DESIGN EXICTRICAl. RATING (MWe-Net): 1171 3.

POWER 11. VEL TO WillCil RESTRICTED 3

  • ANY)(MW, Net):

l 4.

REASONS FOR RESTRICTION (IF ANY):

Tl!IS MONTil YR TO D ATE CUMULATIVE -

f

?

5.

NUMBER PU llOURS REACTOR WAS CRITICAL 744 7568.0 68,946.7

- I 6, -

REACTOR RESERVE SIRTfDOWN IIOURS 0

0' O

{

7.

IIOLM GENERATOR ON LINE 744 7499.4 67,555.1 8.

UNIT R13ERVE SI(UnX)WN llOURS..

0 0

0 9.

GROSS Tl!ERMAL ENERGY GENER %TED (MWil)...

2,607,610 25,785,138 226,865,088.

10.

GROSS E11CTRICAL ENERGY GENERATED (MWII)._.

894,834 8,809,227 77,371,123~

11.

NET ELFCTRICAL ENERGY GENERATED (MWit) 854.312 8,389,953 73,564,051 12.

REACTOR SERVICE FACTOR 100.0 86.4 87.1 i

13.

REACTOR AVAILAllILITY FACTOR 100.0 86.4' 87.1 14.

UNIT SERVICE FACTOR 100.0 85.6

- 85.3.

15.

UNIT AVAILABILITY FACTOR 100.0 85.6 85.3 16.

UNIT CAPACITY FACTOR (Uning MDC).

- 102.5 85.5 83.0 17.

UNIT CAPACITY FACTOR (Using Design MWe)...

98.1

  • 1.8 79.4 I8 UNIT FORCED OUTAGE RATE 0.0 00 2.53

-.;j 19.

SilUrDOWNS SCIIEDULI D OVER NEXT 6 MONTIIS (TYPE, DATE, AND DURATION OF EAC11):

.s j 20.

IF S1IUT DOWN AT END OF REPORTING PERIOD. ESTIM ATE DATE OF STARTUP: N/A

/

,y i

4 l

t Page 3 or4

/

.:.5 PART E UNTT SIIU11) OWNS AND POWER REDUCTIONS 3

DOCKET No.

$0-483 UNTT NAME CAllAWAY UhTT I DATE l-10-94 i

COMPETED BY 1 B. McInvale TEIIPilONE 314476-8247 REPORT MOSTI1: DECEMBER 1993 MET 1tOD OF TYPE SIIUTTING D0%H F: FORCED DURATION THE REACTOR OR M

DATE S. SCl!EDULED OTOURS).

REASON

. REDUCING PO%TR CORRECTIVE'ACTIONSCOMMENTS

SUMMARY

REASON AtETIIOD i

A: EQUIPMENTFA! LURE (EXPLAIN) 1: MANUAL B: htAINT.ORTEST 2: MANUALSCRAM C: RETELING

' 3: AUTOMATICSCRAM D-REGULATORY RESTRICTION 4: UT11ER(EXPLAIN)

E: OPERATORTRAINING AND

.l LICENSE EXAMINATION F: ADMINISTRATION O: OPERATIONALERROR(EXPLAIN)

II: OTliER(EXPIAIN)

Page 4 of 4 a