Monthly Operating Repts for Dec 1993 for McGuire Nuclear Station Units 1 & 2
ML20062N887
Person / Time
Site: McGuire, Mcguire  
Issue date: 12/31/1993
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20062N884 List:
References
NUDOCS 9401240177
Download: ML20062N887 (10)


Text

. -...

g<

I t,:

3 0FERATINB DATA FEFDRI

[

i

-DOCKET NO 50-369 DATEJanuary 14. 1994 DPERATINB STATUS

- COMPLETED Bf

-R.A. Williaes TELEPHONE 704-382-53%

1. Unit Name McGuire 1

-2 Reporting Period: Detecter 1,19934ecember 31,1993

3. Licensed therral Power (MWth 3411 t
4. Naseplate Rating (Grtss MWeh 1305+

Notes-tNareplate Rating-

- 5. Design Electrical Rating (Net MWe):

1190 (Bross MWe) talculated as 3

6. M6isce Deperelable Capacity (Bross Ne):

1171 1450.000 MVA x. 90 p wer

'7; Maxieua Deper.dable Capaa ty (Net N e):

1129 facter per Page lii,-

9. If Changes Dccur in Capacity Ratings (Itess Number 3 Through O Since Last NUREB-0020.

)

Eeprt. Give Reasons:

9. Fower Level To inich Restricted, if Any (Net MWel:
10. Reason For h stritti:ns, If any:

This Month Yr.-to4 ate-l Cumulative

11. Mrs In Reprting Fened 744.0 8760.0 105936.0' "12. Number Of Hours Reactor Was Crttit.:

74.0 5164.3 74020.5

13. Eeacter Resene Shutdown fiours ~0--

~0--

14. Hars Geterater On-Ltr.e 74.0 5097.0' 73219.5.
15. Unit Reserve htdcen liours -

- --0--

14. Bross Thereal Erergy Ger.erated (NH)

-2532733.

16950795

.E26724836.

17. Brcss Electrical Energy Beverated (NH:

877953 5786825 77962155'

'j

18. Net Electncal Energy Secerated (MW)

B45173 5517815 7 % 34150 19, ilnit Senite factor 100.0 58.E.

69.1

. EL L' tit Anilability Fattor 100.0..

58.2 69.1 -

i

21. Unit Capacity Factor (Using MDC Net) 100.6

.'55.8 61.1-

22. tinit C&pacity facter (Using DER Net) 96.3 53.4 59.6
23. Unit Forted Cutage Rate 0.0-23.3 14.3-

'24. Shutde*n Scheduled Over 6t 6 Months (Type, Date, 'and Duration of Each):

None.

25. if Stut Down At End Cf Report Period. Esti*ated Date of Starto :
26. Units In Test Status (Frier to Consercial Operation):

Forecast Achieved INITIAL CRITICA1.!1Y INITIAL ELECTEICITY CDMERCIAL 0fiFATION-e 9401240177 940114 i

~PDR ADOCK 05000369 y R-PDR-t

~

l i

i l

OPERATING DATA REFDRT 1

DOCKET NO 50-369 ~

ONIT McGuire 1 DATE Jawary 14. 1993 COMPLETED BY R.A. Willises.

TELEPHONE 704-382-5346

)

- MONTH Detenber,1993 DAY-AVERA5E DAILY F0WER LEVEL DAY

-AVERABE DAILY POWER LEVEL INWe-Neti

%'e-Ne t )

I I

1133 17 1137 5

2 133 10 1139 1

l 3

1134 19 1133

.t

>\\

4 1133 20 1138 5

1135 El 1137 4

1135 22 1138 7

1135 23 1139

{.i E

1137 24 1139 9

!!36 25 1140 10 1137 26

!!40 11 1137 27.

1139 12 1137 28 1133 13 1137 29 113!

f

p 14 1137 30 1132-

,15 1136 31

1133, j

f 16 1139 l

t l

l-l i

fi

f.

"GNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME McGulut i DATE ul/14/v4 REPORT MONTH December 1993 COMPLETED BY x.

A.

w11.11ams TELEPHONE

( / v 4 3 -3 6 2 -:> a 4 0 (1).

A)

d. Ei--

(2 (3)

(4).

(S)

E HOD-T A

OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE

.O P

DURATION O

DOWN

REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S

(1)' ~

(2)'

(3)

(4)

Reason Method:

Exhibit G - Instructions F Forced A-Equih' ment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data S Scheduled 2-Manual Scram Entry Snects For Licensee C-Refueling ' Restriction 3-Automatic Scram Event Report (NUREG-0161)')

(LER D-Regulaton 4-Other (Explain).

File License Examination E-OgeratorTraining&

r$

r E N~

xhibit I - Same Source H-O her (Explain) (Explain)

....-m_,.---a-.u.

w...wm.

v.

e,=,--.w-.-4-%ww w~w w

~w,

  • -ww.e,--ww u.e

= *

-v aw

N ~ L _,..

p i

8 i

DOCKET: 50-369

-i UNIT: McGuire 1-Data:

01/14/94

.j i

NARRATIVE

SUMMARY

- MONTH: December 1993

+

McGuire Unit 1 began the month of December operating at 100% full power. The unit operated at or near 100% full power for the entire month.

)

I i

I

~

i i

l l

j Prepared by: R. A. Williams

- Telephone: (704)-382-5346 i

f 4

b 1

t's**r D

=

?W

?

W-4-

.~

li l

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name: McGuire.

Unit 1 I

2.

Scheduled next refueling shutdown: Auaust 1994 i

3.

Scheduled restart following refueling: October 1994 j

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY-T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require'a technical specification change or other licence amendment?

j If yes, what will these be?

i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

l 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, i

significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pcol: 583 8.

Present licensed fuel pool capacity: 1463 l

Size of requested or planned increase:

9.

Projected date of.last refueling which can be accommodated by j

present licensed capacity: March 2006 l

DUKE POWER COMPANY DATE:

January 14, 1994 j

9 Name of

Contact:

R.

A. Williams Phone: -(704)-382-5346 l

-l a-

-I u'l

~

c!

r

-,r

.?

O CPERATING CATA REPDRT j

1 DOCKET K0 50-370 I

1 DATE January 14, 1994 l

DrEBTING STATUS COMPLETED BY R.A. Williams

-s l

G2b TELEPHONE 704-382-5346 l' Unit Naan McGuirek.

2. Reprting Feriod: Decester 1, 1993-C+:esber 31, 1993 i
3. Licensed Thermal Power (Wth 3411

]

4. Naeplate Batirg 15ross fWeh 1305#

Notes *Naeeplate Rating

5. tesign Electrical Rating (Wet Geh 1180 (Bross W e) calculated as
6. Maxisas Dependable Capacity (Bross Meh 1171 1450.000 W A x.90 poner
7. Moisar DependaDie Captity (Net MWeh

!!29 factor per Page iii, l

2. If Charges 0:tur in Captity Ratinp (Itess Naber 3 Through 7) Since Last NUREG-0020.

^

Feport. B ne Reasons:

I

{

9. Feuer Leve! To With Restricted, if Any (Net Nel:
10. h uson For Restrictions, If any:

3 4 -

i

)

'l 1

f Inns Month

'fr -to-Bate Cueulative i

i

11. F cts in Rep rting Feriod 744.0 E760.0 86232.0

)

i

12. Wrter Cf 6:rs seatter,las Critical 646.1 6425.7 65B42.1

.)

13. Eeatter Feserve Shatdown h is

- --0--

--0--

i

14. H urs Ger.erator On-Line 646.1 6379.1 64876.2.

1

15. ! hit Reserve Shatdtwo Hours

--0--

. - ~

-j

16. Eress Iteraa! Energy Benerated (Mel 2077334 20464431 211871997 I

)

,17. Gress Electrical Energy Generated (NH1 725772 7129234 74048?35

'l

19. Net Electrical Enngy Generated (NK) 6*56B4 6805155 73966120 i

19, Unit Service factcr 26.B 72.8

-75.2 20, 3rit Availability f actor 86.0 72.8 75.2 1

21c um ! Capatity factor (Using M K het)

B2.8

~69.B 72.0

22. Unit Captity Fatter tusing DER Net) 79.2 65.9 69 B
23. Unit Fcrtet! r tage Rate 13.2 3.0 7.2 u
24. 5%thwr. Schedaled dyer Next 6 ftttts (Typ, Iate, art bration of Eachh i

None

'l l

- 25. If Shut twn At End Of Reprt Feriod. Estiaated Date of Startup: January 07, 1994 1

26, Unitt in itst Etati.s (Prict to Ceraercial Operatienh Ferecast Achieved t

t INITIAL CRITICALITY INITUL ELECTRICITY I

CGMMERCIAL GFEEAll0N l

1 i

i l

I l

.i

F; P

.?

i k

OPEflATING DATA REFORT

-[

+

i I

DOCKET NO 50-370 LiMT McGuire 2

,j DATE h nuary 14. 1993 t

COMPLETED BY - R.A. Williams TELEPHONE 704-3B2-5346 j

f NOMH Decester,!??3 1

D AVERAGE DAILY POWER LEVEL

'f DH AVERASE MILf F0WER LEVEL E

(MWe-NetI (HWe-Net)'

Ll 4

1-1145 17 1150 i

i-;

-2 1145 IB 1151 e

i.

t i

3 777 19 1151 l

1-l 4

i i-4 90 20 1150 i

i-5 689 21 1150

?

b

!!48 22 1150 i

7

!!47 23 1150 2

!!45 24' 1150 v.

9 1149 25 1151 I

10-1 49 26

-!!52 11 1149 27 1062 12.

1149 28 0

i 13

!!49 29 0

14 1149 30 0

15 1t49 31 0-16-1152 i

j

-l L

j i

1.

i

1 "a.

._;l

UNIT ~ SHUTDOWNS AND POWER REDUCTIONS DOCKET No..

50-370-UNIT NAME M w u1Hr. z i

DATE v1/14/ 94 -

REPORT MONTH December 1993 COMPLETED BY ~~k.

A.

williams TELEPHONE

( v u 41 -J a z -:> J 4 6 (1) 11 ) flET-(2 (3)

(4)_

(5)

E HOD T

A OF LICENSE N-Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E-HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE A

CG ACCUMU REACTOR COOLANT DRAIN TANK LEAK-24-P 93 3 F

REPAIR B

SF INSTRU.

SAFETY INJECTION CALIBRATION 25-P 93 5 F

8 93-12-27

.F 5.38 A

3 EA ELECON LOSS OF OFFSITE POWER (TURBINE / REACTOR TRIP) 9-93-12-28 F

44.50 A

HB VALVEX MAIN STEAM ISOLATION VALVE 10 93-12-30 F

48.00 A

SF HTEXCH ICE CONDENSER INSPECTION i

I l

(1)

(2)

(3)

(4)

F Forced' Reason

  • Method:

Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data S Scheduled 2-Manual Scram Entry Sheets For Licensee C-Refueling ' Restrictior) 3-Automatic Scram (LER Eyent Report (NUREG-Ol61))

D-Regulatorv 4-Other (Explain)

File E-Operator training & License Examination F-Administrative-(5)

G-Operator Errgr'(Explain)

Exhibit I - Same Source H-Other (Explain)-

__m___'__a,_-___

. m

...1,-

m.e

,,,-m,

e l

i DOCKET: 50-370 UNIT: McGuire.2 l

Date: 01/14/94-

]

-)

i 9

i NARRATIVE

SUMMARY

MONTH: December 1993 i

McGuire Unit 2 began the month of December operating at 100% power. On 12/03/93 at 1900 the unit had reduced load to 15% power to repair reactor coolant drain tank leak. The unit held at 51% power to perform safety injection calibration. On 12/27/93 at 2207 the unit experienced a turbine / reactor trip due to a loss of offsite power The unit remained in the outage for approximately 2 days due to main steam _ isolation valve problems and 2 days for ice condenser inspections. The unit did not return to service during the month of December, 1993.

i t

Prepared by: R. A. Williams Telephone: (704)-382-5346 i

3

?

I

e MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown: November 1994 3.

Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED.BY SEPARATE COMMUNICATION OF l

ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

1 6

If yes, what will these be?

..e If no, has reload desicn and core configuration been reviewed'by Safety Review Committea regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods,

{

significant changes in design or new operating procedures).

~

7.

Number of Fuel assemblies (a) in the core: 192 (b) in the spent fuel pool: 817 l

8.

Present licensed fuel pool capacity: 1463 l

Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE:

January 14, 1994 Name of

Contact:

R.

A.

Williams Phone:

(7041-382-5346

+