Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045H095 + (ML20045H095)
- ML20045H097 + (ML20045H097)
- LIC-93-0170, Discusses Control Element Assembly Replacements Due to Cladding Problems W/Assembly Ctr Fingers Discovered at Maine Yankee.Util Plans to Replace Assemblies 47 & 48 Prior to Beginning of Cycle 16,currently Scheduled for May 1995 + (ML20045H098)
- ML20045H099 + (ML20045H099)
- ML20045H101 + (ML20045H101)
- ML20045H102 + (ML20045H102)
- ML20045H104 + (ML20045H104)
- ML20045H106 + (ML20045H106)
- ML20045H107 + (ML20045H107)
- ML20045H108 + (ML20045H108)
- ML20045H109 + (ML20045H109)
- IR 05000155/1993008 + (ML20045H110)
- ML20045H111 + (ML20045H111)
- ML20045H112 + (ML20045H112)
- ML20045H115 + (ML20045H115)
- ML20045H116 + (ML20045H116)
- ML20045H117 + (ML20045H117)
- ML20045H119 + (ML20045H119)
- ML20045H120 + (ML20045H120)
- ML20045H121 + (ML20045H121)
- ML20045H124 + (ML20045H124)
- ML20045H125 + (ML20045H125)
- ML20045H126 + (ML20045H126)
- ML20045H127 + (ML20045H127)
- ML20045H128 + (ML20045H128)
- ML20045H129 + (ML20045H129)
- ST-HL-AE-4511, Monthly Operating Repts for June 1993 for South Texas Project,Units 1 & 2 + (ML20045H131)
- 3F0793-08, Monthly Operating Rept for June 1993 for Crystal River Unit 3 + (ML20045H132)
- ML20045H135 + (ML20045H135)
- ML20045H136 + (ML20045H136)
- ML20045H137 + (ML20045H137)
- ML20045H139 + (ML20045H139)
- ML20045H141 + (ML20045H141)
- ML20045H143 + (ML20045H143)
- ML20045H144 + (ML20045H144)
- LIC-93-0180, Forwards Rev 6 to Site Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20045H146)
- ML20045H147 + (ML20045H147)
- ML20045H148 + (ML20045H148)
- ML20045H149 + (ML20045H149)
- ML20045H150 + (ML20045H150)
- ML20045H152 + (ML20045H152)
- ML20045H153 + (ML20045H153)
- 05000320/LER-1993-003, Forwards LER 93-003-00 Re Failure to Perform Channel Functional Test of HP-R-226 within Surveillance Interval Specified in ODCM + (ML20045H155)
- 05000320/LER-1993-003-02, :on 930607,discovered That Required Channel Functional Test Not Performed on HP-R-226 within Required Monthly Interval.On 930605,reactor Bldg Purge Operated W/ HP-R-225 & 226 Inoperable.Test Sucessfully Performed + (ML20045H158)
- ML20045H159 + (ML20045H159)
- ML20045H160 + (ML20045H160)
- ML20045H163 + (ML20045H163)
- ML20045H164 + (ML20045H164)
- ML20045H165 + (ML20045H165)
- 05000213/LER-1993-008, :on 930613,determined That Analyzed ECT Data Placed SGs 2 & 4 Into C-3 Category.Total of 39 Tubes Plugged & 83 Tubes re-rolled in Four SGs + (ML20045H168)
- ML20045H169 + (ML20045H169)