Text
,
pp no %
v
.t UNITED STATES
[.kif[]~ j
~
NUCLEAR REGULATORY COMMISSION
- f4;g[
WASHINGTON, D.C. 20555-0001 g m.
July 12, 1993 Docket No. 50-382 Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.
Post Office Box B Killona, Louisiana 70066
Dear Mr. Barkhurst:
SUBJECT:
EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 3 (TAC NO. M84113)
By letter dated July 6, 1983, the Louisiana Power and Light Company (LP&L) submitted a report on the implementation of Regulatory Guide (RG) 1.97, Revision 2.
The NRC staff's safety evaluation (SE), dated October 18, 1985, accepted the LP&L proposal for compliance with RG 1.97, Revision 2.
During the period August 20-24, 1990, Region IV conducted an inspection of the Waterford 3 facility to examine implementation of RG 1.97.
Several deviations were found and documented in the inspection report dated September 19, 1990.
Entergy Operations, Inc. (E01), responded to the deviations by letter dated October 18, 1990.
By letter dated February 28, 1991, E01 changed its commitment from RG 1.97, Revision 2, to Revision 3 and submitted information regarding the implementation of RG 1.97, Revision 3.
The staff has completed the review of the following changes and finds that they either conform to, or are justified in deviating from, the guidance of RG 1.97:
1) identification program for Type A, B, and C instruments designated as Categories 1 and 2,
- 2) two neutron flux monitoring instruments with IE-8 to 100 percent full power,
- 3) reactor coolant system (RCS) soluble boron concentration monitors with a 10 to 5000 ppm range, 4) four modified cold-leg temperature instruments with a range of 50 to 750 degrees F, 5) implementation of qualified safety parameter display system for continuous monitoring of RCS pressure, 140016 E9C file CENTER C0f"I 9307190132 930712 PDR ADOCK 05000302 P
ppg
Mr. Ross P. Barkhurst 6) containment sump level wide range of 0 to 16 feet, and 7) two wide-range level instruments per steam generator, j
On the basis of the submittals and as clarified by E01,'we find the changes R
acceptable. This completes our effort under TAC No. M84113.
Our supplemental safety evaluation is enclosed.
I l
Sincerely, ORIGINAL SIGNED BY:
Terence L. Chan, Acting Project Director Project Directorate IV-1
'l Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
~
Enclosure:
Supplemental safety evaluation cc w/ enclosure:
See next page
' DISTRIBUTION Docket File NRC & Local PDRs PD4-1 Reading D. Wigginton E. Adensam T. Chan P. Noonan ACRS (10) (P-315)
OGC (15B18)
J. Roe A. B. Beach, RIV H. Rathbun B. Marcus A. Hansen 0FC LA:PD4-13 M PM:PDkOI D(A):PD4-1 NAME PNoonan)
DWig h n:pk TChan 1/ h93 I
DATE
?/X/93
~7/ 8/93 COPY YES/ M ffES)N0 YES/h0) v v
0FFICIAL RECORD COPY Document Name: WAT84113.ltr
4 Mr. Ross P. Barkhurst 6) containment sump level wide range of 0 to 16 feet, and 7) two wide-range level instruments per steam generator.
On the basis of the.submittals and as clarified by E01, we find the changes acceptable.
This completes our effort under TAC No. M84113.
Our supplemental safety evaluation is enclosed.
Sincer ly,
/
/
,/',., _
i jjwh. I
/
Q erence L. Chan, Acting Project Director Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Supplemental safety evaluation cc w/ enclosure:
See next page i
1
9 Mr. Ross P. Barkhurst Entergy Operations, Inc.
Waterford 3 cc:
Mr. Hall Bohlinger, Administrator Regional Administrator, Region IV Radiation Protection Division U.S. Nuclear Regulatory Commission Office of Air Quality and Nuclear Energy 611 Ryan Plaza Drive, Suite 1000 Post Office Box 82135 Arlington, Texas 76011 Baton Rouge, Louisiana 70884-2135 Resident Inspector /Waterford NPS Mr. John R. McGaha Post Office Box 822 Vice President, Operations Killona, Louisiana 70066 Support i
Entergy Operations, Inc.
Parish President Council P. O. Box 31995 St. Charles Parish Jackson, Mississippi 39286 P. O. Box 302 Hahnville, Louisiana 70057 William A. Cross Bethesda Licensing Office Mr. Harry W. Keiser, Executive Vice-3 Metro Center President and Chief Operating Officer Suite 610 Entergy Operations, Inc.
Bethesda, Maryland 20814 P. O. Box 31995 Jackson, Mississippi 39286-1995 Mr. Robert B. McGehee Wise, Carter, Child & Caraway Chairman P.O. Box 651 Louisiana Public Service Commission Jackson, Mississippi 39205 One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Mr. D. F. Packer General Manager Plant Operations Mr. R. F. Burski, Director Entergy Operations, Inc.
Nuclear Safety P. O. Box B Entergy Operations, Inc.
Killona, Louisiana 70066 P. O. Box B Killona, Louisiana 70066 Mr. L. W. Laughlin, Licensing Manager Entergy Operations, Inc.
P. O. Box B Killona, Louisiana 70066 Winston & Strawn Attn:
N. S. Reynolds 1400 L Street, N.W.
Washington, DC 20005-3502